Storm overflow register · Severn Trent Water

Albrighton sewage works: storm overflow spills 2025

Albrighton sewage treatment works, run by Severn Trent Water, has 1 monitored storm overflow discharging to Maltby Dyke. In 2025 it recorded 10 spills totalling 57 hours, against 45 spills and 251 hours in 2024. By hours spilling, it ranks 312 of 435 Severn Trent Water works, where 1 spilled longest.

Works size: 4,479 population equivalent (ALBRIGHTON STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecAlbrighton Sewage…5 Jan 2025 23:57 GMT, 82 min6 Jan 2025 01:40 GMT, 22 min6 Jan 2025 16:58 GMT, 3 min6 Jan 2025 17:58 GMT, 18 min6 Jan 2025 18:58 GMT, 33 min6 Jan 2025 19:58 GMT, 2.1 h6 Jan 2025 22:40 GMT, 10 min27 Jan 2025 03:27 GMT, 38 min4 Sep 2025 10:49 GMT, 3.7 h4 Sep 2025 15:58 GMT, 71 min4 Nov 2025 20:13 GMT, 82 min14 Nov 2025 08:29 GMT, 27.4 h29 Nov 2025 07:50 GMT, 3.4 h15 Dec 2025 17:58 GMT, 4 h18 Dec 2025 14:28 GMT, 10.5 h

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

02,0004,0006,0008,000Jan 2025: 5.6 h spilling ≈ 430 m³ (range 171–1,079 m³)JanFeb 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)FebMar 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MarApr 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AprMay 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MayJun 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JunJul 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AugSep 2025: 4.9 h spilling ≈ 376 m³ (range 150–944 m³)SepOct 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)OctNov 2025: 32 h spilling ≈ 2,464 m³ (range 981–6,185 m³)NovDec 2025: 15 h spilling ≈ 1,113 m³ (range 443–2,794 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
14 Nov 2025, 08:29Albrighton Sewage Treatment Works1.1 days838 – 5,279 m³
18 Dec 2025, 14:28Albrighton Sewage Treatment Works10.5 h322 – 2,029 m³
15 Dec 2025, 17:58Albrighton Sewage Treatment Works4.0 h122 – 771 m³
4 Sep 2025, 10:49Albrighton Sewage Treatment Works3.7 h114 – 716 m³
29 Nov 2025, 07:50Albrighton Sewage Treatment Works3.4 h102 – 645 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate4,382 m³range 1,745 – 11,002 m³
In litres4.4 millionrange 1.7 million – 11.0 million L
Olympic swimming pools1.8at 2,500 m³ each
Organic load, as people's raw sewage6,573person-days of untreated BOD

Assumed spill rate while spilling: 8.5 – 53.5 L/s (central 21.3 L/s), from a dry-weather flow of 8.5 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 70 kg394 kg2,200 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 183 kg1,862 kg7,932 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 3.3 kg28 kg102 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 2.1 kg11 kg59 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 174.5 billion organisms4.4 trillion organisms110.0 trillion organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Albrighton Sewage Treatment Works

Storm tank at sewage works · discharges to Maltby Dyke

Spills 2025
10 (57 hours) · down 78% on 2024
Spills 2024
45 (251 hours)
Long-term average
32.6 spills a year (monitored since 2021)
Monitor uptime
100% of the year
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
WFD catchment
Albrighton Bk - source to conf R Worfe (GB109054050270)
Outlet location
SJ8019304695 (OS grid reference) · View on Apple Maps
EA ID / permit
SVT00038 · S/05/55875/R · company name: ALBRIGHTON STW (SSTO)

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Severn Trent Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.