Severn Trent Water reported 2,452 storm overflows in England for 2025. Together they recorded 36,471 spills over 200,361 hours, an average of 14.9 spills per overflow against 20.4 across England. That ranks 2 of 10 companies, where 1 is the fewest spills per overflow. Counting the same overflows in both years, spills were down 41% on 2024.

429 overflows did not spill · 72 spilled more than 60 times · 2,342 had monitors working for 90% of the year or more · 435 sewage treatment works with overflows

Hours spilling by month, 2025

020k40k60kJan 2025: 59,762 hours spillingJanFeb 2025: 8,544 hours spillingFebMar 2025: 2,127 hours spillingMarApr 2025: 992 hours spillingAprMay 2025: 2,015 hours spillingMayJun 2025: 1,050 hours spillingJunJul 2025: 2,845 hours spillingJulAug 2025: 481 hours spillingAugSep 2025: 8,682 hours spillingSepOct 2025: 4,788 hours spillingOctNov 2025: 51,286 hours spillingNovDec 2025: 57,819 hours spillingDec
Hours spilling, all Severn Trent Water overflows, from the start/stop records. Spills running across a month end are split between the months.

All Severn Trent Water storm overflows

Sorted by hours spilling. Open an overflow for its permit, location, reasons for high spills and improvement status.

OverflowDischarges toSpills 2025Hours 2025Spills vs 2024Monitor uptime
Church Stretton STW
Storm tank at sewage works (with treatment)
Sewage works
Church Stretton
Company site name
CHURCH STRETTON STW (SSTO)
EA ID / permit
SVT00558 · S/09/55956/R
Outlet location
SO4406090820 (OS grid reference) · View on Apple Maps
WFD catchment
Quinny Bk - source to conf R Onny (GB109054044350)
Treatment
Reed bed
2024 spills / hours
260 / 5,220
Long-term average
163.3 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 3,257 hours spilling →
Trib of Quinny Brook 162 3,257 down 38% 98%
Warslow Sewage Treatment Works
Inlet overflow at sewage works (with treatment)
Sewage works
Warslow
Company site name
WARSLOW STW (SSTO)
EA ID / permit
SVT02448 · T/26/35919/R
Outlet location
SK0856057790 (OS grid reference) · View on Apple Maps
WFD catchment
Manifold - source to conf R Dove (GB104028052891)
Treatment
Reed bed
2024 spills / hours
162 / 1,909
Long-term average
127.8 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 2,007 hours spilling →
Warslow Brook 152 2,007 down 6% 97%
Snarestone Sewage Treatment Works
Storm tank at sewage works
Sewage works
Snarestone
Company site name
SNARESTONE STW (SSTO)
EA ID / permit
SVT02076 · T/23/35619/R
Outlet location
SK3369009480 (OS grid reference) · View on Apple Maps
WFD catchment
Mease from Source to Gilwiskaw Brook (GB104028046550)
2024 spills / hours
208 / 3,780
Long-term average
159.8 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
UWWTR improvement ongoing, Operational improvement completed
Volume & pollution
Estimate from 1,969 hours spilling →
River Mease 121 1,969 down 42% 100%
Sutton on Trent (Cromwell) WwTW
Storm tank at sewage works
Sewage works
Sutton On Trent
Company site name
SUTTON ON TRENT - CROMWELL STW (SSTO)
EA ID / permit
SVT02251 · T/69/46017/R
Outlet location
SK8069362542 (OS grid reference) · View on Apple Maps
WFD catchment
Trent from Soar to The Beck (GB104028053110)
2024 spills / hours
237 / 3,657
Long-term average
139.0 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 1,601 hours spilling →
River Trent 125 1,601 down 47% 99%
Blakeney STW (Ssto)
Storm tank at sewage works
Sewage works
Blakeney
Company site name
BLAKENEY (STW)
EA ID / permit
SVT00291 · S/20/26262/R
Outlet location
SO6911006040 (OS grid reference) · View on Apple Maps
WFD catchment
Severn River and Trib Estuary (GB530905415403)
2024 spills / hours
197 / 2,807
Long-term average
128.5 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 1,579 hours spilling →
River Severn 153 1,579 down 22% 100%
Wellesbourne Sewage Treatment Works
Storm tank at sewage works
Sewage works
Wellesbourne
Company site name
WELLESBOURNE STW 3DWF (SSTO)
EA ID / permit
SVT02487 · S/13/26721/R
Outlet location
SP2710055780 (OS grid reference) · View on Apple Maps
WFD catchment
Dene - Butlers Marston to conf R Avon (GB109054039540)
2024 spills / hours
224 / 4,008
Long-term average
101.6 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
UWWTR improvement ongoing, Operational improvement completed
Volume & pollution
Estimate from 1,509 hours spilling →
River Dene 87 1,509 down 61% 100%
Lydney Sewage Treatment Works
Storm tank at sewage works
Sewage works
Lydney
Company site name
LYDNEY STW (SSTO)
EA ID / permit
SVT01447 · S/20/26643/R
Outlet location
SO6365000550 (OS grid reference) · View on Apple Maps
WFD catchment
SEVERN MIDDLE (GB530905415402)
2024 spills / hours
196 / 1,848
Long-term average
174.3 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Monitor below 90%
Installation set-up/design issue · Resolved - Jul
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 1,476 hours spilling →
River Severn Estuary 178 1,476 down 9% 90%
The Crescent CSO
Overflow on sewer network
Company site name
BRADWELL - THE CRESCENT 23 (CSO)
EA ID / permit
SVT02283 · T/38/21458/O
Outlet location
SK1753281692 (OS grid reference) · View on Apple Maps
WFD catchment
Noe from Peakshole Water to Derwent (GB104028057850)
2024 spills / hours
97 / 616
Long-term average
40.4 spills a year (monitored since 2019)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement ongoing
Volume & pollution
Estimate from 1,394 hours spilling →
Bradwell Brook 127 1,394 up 31% 100%
Matlock Lea STW
Storm tank at sewage works
Sewage works
Matlock Lea
Company site name
MATLOCK LEA STW (SSTO)
EA ID / permit
SVT01515 · T/40/08170/R
Outlet location
SK3150055994 (OS grid reference) · View on Apple Maps
WFD catchment
Derwent from Wye to Amber (GB104028052390)
2024 spills / hours
123 / 1,773
Long-term average
79.6 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 1,282 hours spilling →
River Derwent 77 1,282 down 37% 100%
Froghall Sewage Treatment Works
Storm tank at sewage works
Sewage works
Froghall
Company site name
FROGHALL STW (SSTO)
EA ID / permit
SVT00933 · T/30/35538/R
Outlet location
SK0255046950 (OS grid reference) · View on Apple Maps
WFD catchment
Churnet from Consall to River Dove (GB104028052652)
2024 spills / hours
85 / 1,055
Long-term average
58.8 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 1,252 hours spilling →
River Churnet 74 1,252 down 13% 100%
Hanbury STW
Inlet overflow at sewage works (with treatment)
Sewage works
Hanbury
Company site name
HANBURY (WORCESTERSHIRE) STW (SSTO)
EA ID / permit
SVT01037 · S/19/25309/R
Outlet location
SO9573462424 (OS grid reference) · View on Apple Maps
WFD catchment
Seeley Bk - source to conf Bow Bk (GB109054043790)
Treatment
Reed bed
2024 spills / hours
89 / 665
Long-term average
96.8 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 1,232 hours spilling →
Tributary of Seeley Brook 71 1,232 down 20% 100%
Wessington Pumping Station
Storm discharge at pumping station
Company site name
WESSINGTON - BACK LANE (SSO)
EA ID / permit
SVT02504 · T/41/40327/O
Outlet location
SK3859058150 (OS grid reference) · View on Apple Maps
WFD catchment
Amber from Press Brook to Alfreton Brook (GB104028052340)
2024 spills / hours
102 / 1,599
Long-term average
81.0 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 1,211 hours spilling →
River Amber 68 1,211 down 33% 100%
Frankton Sewage Treatment Works
Storm tank at sewage works
Sewage works
Frankton
Company site name
FRANKTON STW (SSTO)
EA ID / permit
SVT00925 · S/12/25970/R
Outlet location
SP4332069411 (OS grid reference) · View on Apple Maps
WFD catchment
Leam - conf Rains Bk to conf R Itchen (GB109054044130)
2024 spills / hours
217 / 4,439
Long-term average
120.4 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 1,191 hours spilling →
Tributary of River Leam 83 1,191 down 62% 99%
Great Glen Sewage Treatment Works
Storm tank at sewage works
Sewage works
Great Glen
Company site name
GREAT GLEN STW (SSTO)
EA ID / permit
SVT00994 · T/51/45910/R
Outlet location
SP6599097416 (OS grid reference) · View on Apple Maps
WFD catchment
Burton Brook from Source to Sence (GB104028046630)
2024 spills / hours
21 / 168
Long-term average
67.6 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 1,185 hours spilling →
Burton Brook 69 1,185 up 229% 91%
Letwell Sewage Treatment Works
Storm tank at sewage works
Sewage works
Letwell
Company site name
LETWELL STW (SSTO)
EA ID / permit
SVT01351 · T/76/45987/R
Outlet location
SK5665386851 (OS grid reference) · View on Apple Maps
WFD catchment
Hodsock Bk (to Oldcoates Dyke) (GB104028058190)
2024 spills / hours
100 / 1,736
Long-term average
77.2 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 1,184 hours spilling →
Tributary of Carlton Beck 65 1,184 down 35% 99%
Balsall Common WwTW
Inlet overflow at sewage works (with treatment)
Sewage works
Balsall Common
Company site name
BALSALL COMMON STW SRBO SPILL 1 (SSTO)
EA ID / permit
SVT00166 · T/11/35953/R
Outlet location
SP2223877770 (OS grid reference) · View on Apple Maps
WFD catchment
Blythe from Temple Balsall Brook to Patrick Bridge (GB104028042571)
Treatment
Reed bed
2024 spills / hours
45 / 658
Long-term average
29.8 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation completed
Improvement
UWWTR improvement ongoing, Operational improvement completed
Volume & pollution
Estimate from 1,129 hours spilling →
Tributary of River Blythe 77 1,129 up 71% 99%
Broadoak Sewage Treatment Works
Storm tank at sewage works
Sewage works
Broadoak
Company site name
BROADOAK STW (CSO)
EA ID / permit
SVT00365 · S/20/25648/R
Outlet location
SO7023013200 (OS grid reference) · View on Apple Maps
WFD catchment
Severn River and Trib Estuary (GB530905415403)
2024 spills / hours
88 / 620
Long-term average
65.8 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 1,127 hours spilling →
River Severn 87 1,127 down 1% 100%
Wirksworth Sewage Treatment Works
Storm tank at sewage works
Sewage works
Wirksworth
Company site name
WIRKSWORTH STW (SSTO)
EA ID / permit
SVT02577 · T/43/45907/R
Outlet location
SK2845052264 (OS grid reference) · View on Apple Maps
WFD catchment
Ecclesborne Catchment (trib of Derwent) (GB104028052720)
2024 spills / hours
74 / 847
Long-term average
93.0 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement ongoing
Volume & pollution
Estimate from 1,121 hours spilling →
River Ecclesbourne 74 1,121 no change 100%
Bradwell Sewage Treatment Works
Storm tank at sewage works
Sewage works
Bradwell
Company site name
BRADWELL STW (SSTO)
EA ID / permit
SVT00323 · T/38/46039/R
Outlet location
SK1799082230 (OS grid reference) · View on Apple Maps
WFD catchment
Noe from Peakshole Water to Derwent (GB104028057850)
2024 spills / hours
87 / 968
Long-term average
97.0 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 1,109 hours spilling →
Bradwell Brook 71 1,109 down 18% 100%
Madresfield (Waterloo Close) STW
Inlet overflow at sewage works
Sewage works
Madresfield
Company site name
MADRESFIELD WATERLOO CLOS (STW)
EA ID / permit
SVT01453 · S/08/25823/R
Outlet location
SO8013448155 (OS grid reference) · View on Apple Maps
WFD catchment
Madresfield Bk - source to conf R Severn (GB109054039740)
2024 spills / hours
114 / 1,574
Long-term average
85.6 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 1,094 hours spilling →
Madresfield Brook 88 1,094 down 23% 100%
Pinxton Sewage Treatment Works
Storm tank at sewage works
Sewage works
Pinxton
Company site name
PINXTON STW (SSTO)
EA ID / permit
SVT01797 · T/61/46266/R
Outlet location
SK4488054000 (OS grid reference) · View on Apple Maps
WFD catchment
Erewash from Source to Nethergreen Brook (GB104028052740)
2024 spills / hours
103 / 1,469
Long-term average
102.0 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 1,022 hours spilling →
River Erewash 67 1,022 down 35% 100%
Hodsock Wastewater Treatment Works
Storm tank at sewage works
Sewage works
Hodsock
Company site name
HODSOCK STW (SSTO)
EA ID / permit
SVT01154 · T/76/45601/R
Outlet location
SK5976086420 (OS grid reference) · View on Apple Maps
WFD catchment
Hodsock Bk (to Oldcoates Dyke) (GB104028058190)
2024 spills / hours
116 / 1,810
Long-term average
75.8 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
UWWTR improvement ongoing, Operational improvement completed
Volume & pollution
Estimate from 1,018 hours spilling →
Tributary of Carlton Beck 75 1,018 down 35% 99%
Bomere Heath STW
Storm tank at sewage works
Sewage works
Bomere Heath
Company site name
BOMERE HEATH STW (SSTO)
EA ID / permit
SVT00304 · S/02/55802/R
Outlet location
SJ4731318259 (OS grid reference) · View on Apple Maps
WFD catchment
Severn - conf Bele Bk to conf Sundorne Bk (GB109054049142)
2024 spills / hours
72 / 1,082
Long-term average
75.8 spills a year (monitored since 2020)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 998 hours spilling →
Leaton Brook 62 998 down 14% 100%
Kniveton STW
Storm tank at sewage works
Sewage works
Kniveton
Company site name
KNIVETON STW (SSTO)
EA ID / permit
SVT01302 · T/29/35675/R
Outlet location
SK2077049290 (OS grid reference) · View on Apple Maps
WFD catchment
Henmore Brook Catch (trib of R Dove) (GB104028052700)
2024 spills / hours
94 / 616
Long-term average
88.8 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement ongoing
Volume & pollution
Estimate from 995 hours spilling →
Kniveton Brook 84 995 down 11% 100%
Whatstandwell STW
Storm tank at sewage works
Sewage works
Whatstandwell
Company site name
WHATSTANDWELL STW (SSTO)
EA ID / permit
SVT02530 · T/40/45704/R
Outlet location
SK3337253910 (OS grid reference) · View on Apple Maps
WFD catchment
Derwent from Wye to Amber (GB104028052390)
2024 spills / hours
112 / 2,063
Long-term average
45.6 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement ongoing
Volume & pollution
Estimate from 987 hours spilling →
River Derwent 58 987 down 48% 100%
Ogston WTW CSO
Overflow on sewer network
Company site name
OGSTON TREATMENT WORKS (CSO)
EA ID / permit
SVT01710 · T/41/07443/O
Outlet location
SK3810059840 (OS grid reference) · View on Apple Maps
WFD catchment
Amber from Source to Press Brook (GB104028052380)
2024 spills / hours
79 / 893
Long-term average
72.3 spills a year (monitored since 2019)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 986 hours spilling →
River Amber 80 986 up 1% 100%
Matlock Bath - Dale Road (Coal Me-
Overflow on sewer network
Company site name
MATLK BTH-DALE RD (COAL MERCHANTS) (CSO)
EA ID / permit
SVT01511 · DT/2179
Outlet location
SK2958359027 (OS grid reference) · View on Apple Maps
WFD catchment
Derwent from Wye to Amber (GB104028052390)
2024 spills / hours
109 / 602
Long-term average
77.9 spills a year (monitored since 2017)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement ongoing
Volume & pollution
Estimate from 977 hours spilling →
River Derwent 118 977 up 8% 100%
Worcester STW
Storm tank at sewage works
Sewage works
Worcester
Company site name
WORCESTER - BROMWICH ROAD STW (SSTO)
EA ID / permit
SVT02635 · S/07/55380/R
Outlet location
SO8462053410 (OS grid reference) · View on Apple Maps
WFD catchment
Severn - conf R Stour to conf RIver Teme (GB109054049144)
2024 spills / hours
150 / 2,193
Long-term average
96.2 spills a year (monitored since 2020)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 975 hours spilling →
River Severn 68 975 down 55% 100%
Bakewell Sewage Treatment Works
Storm tank at sewage works
Sewage works
Bakewell
Company site name
BAKEWELL - PICKORY CORNER STW (SSTO)
EA ID / permit
SVT00161 · T/39/46184/R
Outlet location
SK2426265281 (OS grid reference) · View on Apple Maps
WFD catchment
Wye from Monk's Dale to Derwent (GB104028057820)
2024 spills / hours
95 / 1,627
Long-term average
77.0 spills a year (monitored since 2020)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing, Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 969 hours spilling →
Tributary of River Wye 57 969 down 40% 100%
South Normanton STW
Storm tank at sewage works
Sewage works
South Normanton
Company site name
SOUTH NORMANTON STW 3DWF (SSTO)
EA ID / permit
SVT02109 · T/41/46401/R
Outlet location
SK4485957679 (OS grid reference) · View on Apple Maps
WFD catchment
Alfreton Brook from Source to Westwood Brook (GB104028052350)
2024 spills / hours
37 / 393
Long-term average
38.6 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 948 hours spilling →
Normanton Brook 53 948 up 43% 98%
Alkborough STW
Storm tank at sewage works
Sewage works
Alkborough
Company site name
ALKBOROUGH STW (SSTO)
EA ID / permit
SVT00050 · T/81/45466/R
Outlet location
SE8791922121 (OS grid reference) · View on Apple Maps
WFD catchment
Humber estuary TRaC (GB530402609203)
2024 spills / hours
67 / 1,235
Long-term average
97.2 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 946 hours spilling →
Tributary of River Humber 57 946 down 15% 100%
Crowle-Scunthorpe STW
Storm tank at sewage works
Sewage works
Crowle Scunthorpe
Company site name
CROWLE - SCUNTHORPE STW (SSTO)
EA ID / permit
SVT00693 · T/84/46212/R
Outlet location
SE7657612587 (OS grid reference) · View on Apple Maps
WFD catchment
North Soak Drain Catchment (trib of Torne/Three Rivers) (GB104028064350)
2024 spills / hours
216 / 3,582
Long-term average
75.0 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
UWWTR improvement completed
Volume & pollution
Estimate from 925 hours spilling →
Tributary of Pauper¿S Drain 51 925 down 76% 99%
Baslow STW
Storm tank at sewage works
Sewage works
Baslow
Company site name
BASLOW STW (SSTO)
EA ID / permit
SVT00196 · T/38/45845/R
Outlet location
SK2534071770 (OS grid reference) · View on Apple Maps
WFD catchment
Derwent from Westend to Wye (GB104028057880)
2024 spills / hours
116 / 1,317
Long-term average
82.8 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement ongoing
Volume & pollution
Estimate from 915 hours spilling →
River Derwent 86 915 down 26% 100%
Ashover STW
Inlet overflow at sewage works
Sewage works
Ashover
Company site name
ASHOVER STW (CSO)
EA ID / permit
SVT00130 · T/41/45611/R
Outlet location
SK3461362880 (OS grid reference) · View on Apple Maps
WFD catchment
Amber from Source to Press Brook (GB104028052380)
2024 spills / hours
148 / 1,275
Long-term average
115.4 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 911 hours spilling →
River Amber 103 911 down 30% 100%
Pitts Mill Sewage Treatment Works
Storm tank at sewage works
Sewage works
Pitts Mill
Company site name
PITTS MILL STW (SSTO)
EA ID / permit
SVT01799 · S/21/26069/R
Outlet location
SO7850028392 (OS grid reference) · View on Apple Maps
WFD catchment
Glynch Bk - source to conf R Leadon (GB109054039620)
2024 spills / hours
179 / 3,460
Long-term average
84.4 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
UWWTR improvement ongoing, Operational improvement completed
Volume & pollution
Estimate from 907 hours spilling →
Glynch Brook 51 907 down 72% 93%
Stanley Downton WwTW
Storm tank at sewage works
Sewage works
Stanley Downton
Company site name
STANLEY DOWNTON (STW)
EA ID / permit
SVT02163 · S/22/26240/R
Outlet location
SO7933004970 (OS grid reference) · View on Apple Maps
WFD catchment
Frome - Ebley Mill to conf R Severn (GB109054032450)
2024 spills / hours
127 / 1,647
Long-term average
67.3 spills a year (monitored since 2020)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 907 hours spilling →
River Frome 58 907 down 54% 100%
Ilmington STW
Storm tank at sewage works
Sewage works
Ilmington
Company site name
ILINGTON STW (SSTO)
EA ID / permit
SVT01210 · S/14/25976/R
Outlet location
SP2229044080 (OS grid reference) · View on Apple Maps
WFD catchment
Stour - conf Nethercote Bk to conf Back Bk (GB109054039922)
2024 spills / hours
111 / 2,164
Long-term average
93.0 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 903 hours spilling →
Tributary of Back Brook 54 903 down 51% 97%
Ashover STW
Storm tank at sewage works
Sewage works
Ashover
Company site name
ASHOVER STW (SSTO)
EA ID / permit
SVT00129 · T/41/45611/R
Outlet location
SK3461362880 (OS grid reference) · View on Apple Maps
WFD catchment
Amber from Source to Press Brook (GB104028052380)
2024 spills / hours
0 / 0.0
Long-term average
54.5 spills a year (monitored since 2020)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 870 hours spilling →
River Amber 49 870 up from 0 99%
Fenny Compton STW
Inlet overflow at sewage works (with treatment)
Sewage works
Fenny Compton
Company site name
FENNY COMPTON STW (SSTO)
EA ID / permit
SVT00891 · S/12/25307/R
Outlet location
SP4203853138 (OS grid reference) · View on Apple Maps
WFD catchment
Itchen - source to conf with R Stowe (GB109054044070)
Treatment
Reed bed
2024 spills / hours
250 / 4,249
Long-term average
104.6 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Monitor below 90%
Installation set-up/design issue · Scheduled
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 866 hours spilling →
Tributary of the River Itchen 70 866 down 72% 79%
Kegworth STW
Storm tank at sewage works
Sewage works
Kegworth
Company site name
KEGWORTH STW (SSTO)
EA ID / permit
SVT01241 · T/59/45410/R
Outlet location
SK4921727848 (OS grid reference) · View on Apple Maps
WFD catchment
Soar from Long Whatton Brook to Trent (GB104028047212)
2024 spills / hours
88 / 938
Long-term average
68.4 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 826 hours spilling →
River Soar 58 826 down 34% 100%
Endon Sewage Treatment Works
Storm tank at sewage works
Sewage works
Endon
Company site name
ENDON STW (SSTO
EA ID / permit
SVT00866 · T/30/35824/R
Outlet location
SJ9377354135 (OS grid reference) · View on Apple Maps
WFD catchment
Endon Bk (GB104028052711)
2024 spills / hours
108 / 553
Long-term average
97.4 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 811 hours spilling →
Endon Brook 83 811 down 23% 99%
Milton Sewage Treatment Works
Storm tank at sewage works
Sewage works
Milton
Company site name
MILTON STW (SSTO)
EA ID / permit
SVT01573 · T/36/45730/R
Outlet location
SK3319227862 (OS grid reference) · View on Apple Maps
WFD catchment
Trent from Dove to Derwent (GB104028047420)
2024 spills / hours
147 / 1,753
Long-term average
111.3 spills a year (monitored since 2020)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 806 hours spilling →
River Trent 76 806 down 48% 100%
Darley Dale No 11 CSO
Storm discharge at pumping station
Company site name
MATLOCK - BAKEWELL RD (HOOLEY TOWN) (SSO)
EA ID / permit
SVT00740 · EPRKB3593RU
Outlet location
SK2867360855 (OS grid reference) · View on Apple Maps
WFD catchment
Derwent from Wye to Amber (GB104028052390)
2024 spills / hours
91 / 818
Long-term average
89.7 spills a year (monitored since 2019)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 804 hours spilling →
River Derwent 84 804 down 8% 100%
Colwall Sewage Treatment Works
Storm tank at sewage works
Sewage works
Colwall
Company site name
COLWALL STW (SSTO)
EA ID / permit
SVT00621 · S/09/55757/R
Outlet location
SO7367842954 (OS grid reference) · View on Apple Maps
WFD catchment
Cradley Bk - source to conf Suckley Bk (GB109054039910)
2024 spills / hours
143 / 1,947
Long-term average
103.4 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 799 hours spilling →
Cradley Brook 81 799 down 43% 100%
Snarrows STW
Storm tank at sewage works
Sewage works
Snarrows
Company site name
SNARROWS STW (SSTO)
EA ID / permit
SVT02077 · T/57/46075/R
Outlet location
SK4344718479 (OS grid reference) · View on Apple Maps
WFD catchment
Grace Dieu Brook Catchment (trib of Black Brook) (GB104028047090)
2024 spills / hours
104 / 1,276
Long-term average
80.2 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing, Operational investigation completed
Improvement
UWWTR improvement completed
Volume & pollution
Estimate from 796 hours spilling →
Grace Dieu Brook 66 796 down 37% 99%
Tideswell STW
Storm tank at sewage works
Sewage works
Tideswell
Company site name
TIDESWELL STW (SSTO)
EA ID / permit
SVT02324 · T/39/45417/R
Outlet location
SK1540974474 (OS grid reference) · View on Apple Maps
WFD catchment
Wye from Monk's Dale to Derwent (GB104028057820)
2024 spills / hours
92 / 837
Long-term average
97.0 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 772 hours spilling →
Tideswell Brook 68 772 down 26% 100%
Avening Sewage Treatment Works
Inlet overflow at sewage works
Sewage works
Avening
Company site name
TETBURY - AVENING STW (CSO)
EA ID / permit
SVT00150 · S/22/26628/R
Outlet location
ST8787698744 (OS grid reference) · View on Apple Maps
WFD catchment
Nailsworth Stream - source to conf R Frome (GB109054026531)
2024 spills / hours
154 / 975
Long-term average
135.2 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 759 hours spilling →
Nailsworth Stream 113 759 down 27% 100%
The Post Office CSO
Storm discharge at pumping station
Company site name
ASHFORD - CHURCH ST (POST OFFICE) (CSO)
EA ID / permit
SVT02300 · T/39/21265/O
Outlet location
SK1973969647 (OS grid reference) · View on Apple Maps
WFD catchment
Wye from Monk's Dale to Derwent (GB104028057820)
2024 spills / hours
22 / 155
Long-term average
11.9 spills a year (monitored since 2019)
High-spill reason (company)
Data collection - EDM non-representative location
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 728 hours spilling →
River Wye 57 728 up 159% 100%
Crowle STW
Storm tank at sewage works
Sewage works
Crowle
Company site name
CROWLE - WORCESTER (STW)
EA ID / permit
SVT00694 · S/19/25637/R
Outlet location
SO9347455685 (OS grid reference) · View on Apple Maps
WFD catchment
Bow Bk - Shell to conf R Avon (GB109054043712)
2024 spills / hours
143 / 2,487
Long-term average
123.7 spills a year (monitored since 2020)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 720 hours spilling →
Bow Brook 56 720 down 61% 99%
Lydney - East Marsh SPS
Storm discharge at pumping station
Company site name
LYDNEY - EAST MARSH (SSO)
EA ID / permit
SVT00827 · S/20/26052/O
Outlet location
SO6346802492 (OS grid reference) · View on Apple Maps
WFD catchment
Cannop Bk - source to R Severn Estuary (GB109054032640)
2024 spills / hours
126 / 1,878
Long-term average
111.4 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 703 hours spilling →
Tributary of the Lyd 48 703 down 62% 100%

Sewage treatment works

Storm tanks and inlet overflows at each Severn Trent Water sewage works. The figures are 2025 spills.

← All water companies · Contains Environment Agency data licensed under the Open Government Licence v3.0. How to read the data.