Storm overflow register · Severn Trent Water

East Markham sewage works: storm overflow spills 2025

East Markham sewage treatment works, run by Severn Trent Water, has 1 monitored storm overflow discharging to Tributary of Laneham Beck. In 2025 it recorded 23 spills totalling 132 hours, against 28 spills and 168 hours in 2024. By hours spilling, it ranks 233 of 435 Severn Trent Water works, where 1 spilled longest.

Works size: 4,134 population equivalent (EAST MARKHAM STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecEast Markham STW1 Jan 2025 08:59 GMT, 36 min1 Jan 2025 09:55 GMT, 14 min5 Jan 2025 11:10 GMT, 12.2 h6 Jan 2025 05:25 GMT, 115 min6 Jan 2025 12:25 GMT, 115 min6 Jan 2025 14:55 GMT, 9.9 h7 Jan 2025 01:10 GMT, 25 min27 Jan 2025 03:29 GMT, 111 min6 Jul 2025 12:55 GMT, 40 min6 Jul 2025 22:08 GMT, 87 min3 Sep 2025 15:58 GMT, 76 min4 Sep 2025 12:28 GMT, 2.1 h17 Sep 2025 07:28 GMT, 2.4 h20 Sep 2025 21:28 GMT, 2.4 h21 Sep 2025 00:25 GMT, 115 min23 Oct 2025 01:43 GMT, 7.1 h23 Oct 2025 09:16 GMT, 48 min4 Nov 2025 21:44 GMT, 6 min10 Nov 2025 16:57 GMT, 53 min12 Nov 2025 00:29 GMT, 59 min14 Nov 2025 06:58 GMT, 31.6 h15 Nov 2025 15:25 GMT, 25 min15 Nov 2025 16:40 GMT, 40 min15 Nov 2025 17:40 GMT, 47 min15 Nov 2025 18:32 GMT, 17 min29 Nov 2025 07:23 GMT, 12 h29 Nov 2025 19:55 GMT, 10 min29 Nov 2025 20:25 GMT, 18 min29 Nov 2025 20:46 GMT, 5.1 h30 Nov 2025 02:10 GMT, 50 min4 Dec 2025 19:58 GMT, 4.2 h5 Dec 2025 20:27 GMT, 3.6 h6 Dec 2025 00:40 GMT, 40 min9 Dec 2025 05:58 GMT, 3.9 h9 Dec 2025 10:10 GMT, 10 min9 Dec 2025 10:40 GMT, 10 min9 Dec 2025 11:17 GMT, 27 min9 Dec 2025 13:25 GMT, 40 min18 Dec 2025 15:13 GMT, 12.6 h19 Dec 2025 04:25 GMT, 25 min19 Dec 2025 05:55 GMT, 18 min19 Dec 2025 07:10 GMT, 18 min19 Dec 2025 07:32 GMT, 32 min19 Dec 2025 08:40 GMT, 40 min19 Dec 2025 09:55 GMT, 25 min19 Dec 2025 10:40 GMT, 10 min

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

02,5005,0007,50010kJan 2025: 29 h spilling ≈ 2,054 m³ (range 818–5,157 m³)JanFeb 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)FebMar 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MarApr 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AprMay 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MayJun 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JunJul 2025: 2.1 h spilling ≈ 149 m³ (range 59–373 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AugSep 2025: 10 h spilling ≈ 708 m³ (range 282–1,778 m³)SepOct 2025: 7.9 h spilling ≈ 560 m³ (range 223–1,405 m³)OctNov 2025: 54 h spilling ≈ 3,825 m³ (range 1,524–9,603 m³)NovDec 2025: 29 h spilling ≈ 2,068 m³ (range 824–5,193 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
14 Nov 2025, 06:58East Markham STW1.3 days892 – 5,619 m³
18 Dec 2025, 15:13East Markham STW12.6 h356 – 2,241 m³
5 Jan 2025, 11:10East Markham STW12.2 h343 – 2,161 m³
29 Nov 2025, 07:23East Markham STW12.0 h337 – 2,125 m³
6 Jan 2025, 14:55East Markham STW9.9 h280 – 1,763 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate9,364 m³range 3,730 – 23,509 m³
In litres9.4 millionrange 3.7 million – 23.5 million L
Olympic swimming pools3.7at 2,500 m³ each
Organic load, as people's raw sewage14,046person-days of untreated BOD

Assumed spill rate while spilling: 7.8 – 49.4 L/s (central 19.7 L/s), from a dry-weather flow of 7.8 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 149 kg843 kg4,702 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 392 kg3,980 kg16,950 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 7.1 kg59 kg219 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 4.5 kg24 kg127 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 373.0 billion organisms9.4 trillion organisms235.1 trillion organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

East Markham STW

Storm tank at sewage works · discharges to Tributary of Laneham Beck

Spills 2025
23 (132 hours) · down 18% on 2024
Spills 2024
28 (168 hours)
Long-term average
26.0 spills a year (monitored since 2021)
Monitor uptime
100% of the year
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
WFD catchment
Tuxford Beck Catchment (trib of North Beck) (GB104028058320)
Outlet location
SK7530072599 (OS grid reference) · View on Apple Maps
EA ID / permit
SVT00826 · T/69/45785/R · company name: EAST MARKHAM STW (SSTO)

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Severn Trent Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.