Loughborough sewage works: storm overflow spills 2025

Loughborough sewage treatment works, run by Severn Trent Water, has 1 monitored storm overflow discharging to Wood Brook. In 2025 it recorded 33 spills totalling 213 hours, against 42 spills and 389 hours in 2024. By hours spilling, it ranks 164 of 435 Severn Trent Water works, where 1 spilled longest.

Works size: 75,001 population equivalent (LOUGHBOROUGH STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecLoughborough Sewage…5 Jan 2025 17:18 GMT, 76.6 h8 Jan 2025 21:53 GMT, 4 min8 Jan 2025 22:01 GMT, 1 min8 Jan 2025 22:05 GMT, 1 min27 Jan 2025 03:44 GMT, 36 min27 May 2025 13:07 GMT, 3.4 h27 May 2025 18:39 GMT, 2.3 h27 May 2025 23:27 GMT, 2.1 h28 May 2025 09:07 GMT, 2.4 h5 Jun 2025 10:03 GMT, 2.3 h6 Jun 2025 07:30 GMT, 3.8 h6 Jul 2025 08:06 GMT, 3.8 h7 Jul 2025 00:15 GMT, 8.7 h20 Jul 2025 18:59 GMT, 3.6 h30 Jul 2025 08:30 GMT, 117 min7 Aug 2025 21:20 GMT, 6 min7 Aug 2025 21:34 GMT, 3 min27 Aug 2025 16:11 GMT, 60 min3 Sep 2025 16:45 GMT, 12 min3 Sep 2025 17:01 GMT, 1 min14 Sep 2025 16:19 GMT, 7.2 h17 Sep 2025 06:30 GMT, 6.5 h21 Sep 2025 00:12 GMT, 2.2 h3 Oct 2025 14:41 GMT, 4 h3 Oct 2025 21:33 GMT, 104 min3 Oct 2025 23:35 GMT, 3 min31 Oct 2025 15:09 GMT, 61 min4 Nov 2025 22:05 GMT, 3 min10 Nov 2025 04:24 GMT, 2.6 h10 Nov 2025 13:54 GMT, 2.4 h10 Nov 2025 16:18 GMT, 12 min14 Nov 2025 07:47 GMT, 37.8 h15 Nov 2025 21:37 GMT, 5 min23 Nov 2025 06:49 GMT, 49 min29 Nov 2025 07:33 GMT, 11.6 h29 Nov 2025 19:13 GMT, 3 min29 Nov 2025 19:19 GMT, 1 min29 Nov 2025 19:23 GMT, 2 min1 Dec 2025 21:16 GMT, 94 min16 Dec 2025 07:07 GMT, 4.9 h16 Dec 2025 12:02 GMT, 4 min18 Dec 2025 13:52 GMT, 15.3 h19 Dec 2025 05:11 GMT, 2 min

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

0100k200k300kJan 2025: 77 h spilling ≈ 99,338 m³ (range 39,568–249,392 m³)JanFeb 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)FebMar 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MarApr 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AprMay 2025: 10 h spilling ≈ 13,108 m³ (range 5,221–32,908 m³)MayJun 2025: 6.1 h spilling ≈ 7,839 m³ (range 3,122–19,680 m³)JunJul 2025: 18 h spilling ≈ 23,260 m³ (range 9,265–58,396 m³)JulAug 2025: 1.1 h spilling ≈ 1,414 m³ (range 563–3,549 m³)AugSep 2025: 16 h spilling ≈ 20,690 m³ (range 8,241–51,943 m³)SepOct 2025: 6.8 h spilling ≈ 8,739 m³ (range 3,481–21,939 m³)OctNov 2025: 56 h spilling ≈ 71,452 m³ (range 28,461–179,382 m³)NovDec 2025: 22 h spilling ≈ 28,015 m³ (range 11,159–70,333 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
5 Jan 2025, 17:18Loughborough Sewage Treatment Works3.2 days39,193 – 247,027 m³
14 Nov 2025, 07:47Loughborough Sewage Treatment Works1.6 days19,324 – 121,793 m³
18 Dec 2025, 13:52Loughborough Sewage Treatment Works15.3 h7,815 – 49,255 m³
29 Nov 2025, 07:33Loughborough Sewage Treatment Works11.6 h5,929 – 37,371 m³
7 Jul 2025, 00:15Loughborough Sewage Treatment Works8.7 h4,462 – 28,123 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate273,726 m³range 109,031 – 687,200 m³
In litres273.7 millionrange 109.0 million – 687.2 million L
Olympic swimming pools109at 2,500 m³ each
Organic load, as people's raw sewage410,589person-days of untreated BOD

Assumed spill rate while spilling: 142.2 – 896.2 L/s (central 357.0 L/s), from a dry-weather flow of 142.2 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 4,361 kg24,635 kg137,440 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 11,448 kg116,334 kg495,471 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 207 kg1,724 kg6,391 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 131 kg712 kg3,711 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 10.9 trillion organisms273.7 trillion organisms6.9 × 10¹⁵ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Loughborough Sewage Treatment Works

Storm tank at sewage works · discharges to Wood Brook

Spills 2025
33 (213 hours) · down 21% on 2024
Spills 2024
42 (389 hours)
Long-term average
46.7 spills a year (monitored since 2020)
Monitor uptime
100% of the year
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
WFD catchment
Wood Brook Catchment (trib of Soar) (GB104028047080)
Outlet location
SK5314021500 (OS grid reference) · View on Apple Maps
EA ID / permit
SVT01420 · T/57/45484/R · company name: LOUGHBOROUGH STW (SSTO)

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Severn Trent Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.