Lydney sewage treatment works, run by Severn Trent Water, has 1 monitored storm overflow discharging to River Severn Estuary. In 2025 it recorded 178 spills totalling 1,476 hours, against 196 spills and 1,848 hours in 2024. By hours spilling, it ranks 8 of 435 Severn Trent Water works, where 1 spilled longest.

Works size: 22,722 population equivalent (LYDNEY STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecLydney Sewage…34 spills, 40.5 h, 2 Jan to 6 Jan9 Jan 2025 04:26 GMT, 10 min62 spills, 43.9 h, 10 Jan to 15 Jan2 spills, 0.2 h, 17 Jan to 18 Jan4 spills, 0.5 h, 21 Jan to 21 Jan24 spills, 59.3 h, 23 Jan to 27 Jan124 spills, 145 h, 29 Jan to 15 Feb7 spills, 0.6 h, 16 Feb to 17 Feb5 spills, 0.7 h, 18 Feb to 19 Feb30 spills, 34.9 h, 19 Feb to 24 Feb45 spills, 56.4 h, 26 Feb to 3 Mar3 spills, 0.3 h, 4 Mar to 6 Mar2 spills, 0.8 h, 8 Mar to 8 Mar4 spills, 0.6 h, 9 Mar to 9 Mar2 spills, 0.9 h, 10 Mar to 10 Mar12 Mar 2025 03:43 GMT, 4 min13 Mar 2025 12:12 GMT, 5 min21 Mar 2025 20:26 GMT, 8 min23 Mar 2025 01:57 GMT, 50 min24 Mar 2025 10:01 GMT, 23 min13 Apr 2025 11:28 GMT, 3 min2 spills, 0.2 h, 18 Apr to 19 Apr2 spills, 8.3 h, 22 Apr to 23 Apr4 spills, 2.1 h, 26 May to 27 May2 spills, 3.2 h, 3 Jun to 3 Jun4 spills, 3.9 h, 5 Jun to 5 Jun3 spills, 1.4 h, 7 Jun to 7 Jun6 spills, 1.9 h, 12 Jun to 13 Jun1 Jul 2025 02:14 GMT, 1 min2 spills, 0.8 h, 29 Jul to 29 Jul2 spills, 1.8 h, 31 Jul to 31 Jul29 Aug 2025 02:39 GMT, 8 min5 spills, 5.8 h, 30 Aug to 30 Aug10 spills, 13.4 h, 3 Sep to 4 Sep3 spills, 12.6 h, 7 Sep to 7 Sep42 spills, 37.9 h, 10 Sep to 15 Sep20 spills, 8.2 h, 17 Sep to 18 Sep13 spills, 16.5 h, 3 Oct to 5 Oct7 Oct 2025 02:43 GMT, 17 min8 Oct 2025 02:42 GMT, 4 min9 Oct 2025 02:42 GMT, 5 min10 Oct 2025 02:42 GMT, 5 min11 Oct 2025 02:43 GMT, 3 min3 spills, 0.4 h, 12 Oct to 13 Oct14 Oct 2025 07:12 GMT, 6 min15 Oct 2025 03:43 GMT, 4 min16 Oct 2025 10:12 GMT, 5 min18 Oct 2025 03:43 GMT, 3 min17 spills, 26.7 h, 19 Oct to 21 Oct25 spills, 19.2 h, 22 Oct to 26 Oct3 spills, 3.4 h, 29 Oct to 29 Oct36 spills, 14.5 h, 30 Oct to 3 Nov22 spills, 34.2 h, 4 Nov to 8 Nov57 spills, 234 h, 9 Nov to 21 Nov450 spills, 638.2 h, 21 Nov to 29 Dec2 spills, 0.2 h, 30 Dec to 30 Dec

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low-high range. Method.

0200k400k600kJan 2025: 209 h spilling ≈ 81,370 m³ (range 32,411-204,282 m³)JanFeb 2025: 166 h spilling ≈ 64,590 m³ (range 25,727-162,155 m³)FebMar 2025: 12 h spilling ≈ 4,477 m³ (range 1,783-11,240 m³)MarApr 2025: 8.6 h spilling ≈ 3,348 m³ (range 1,334-8,406 m³)AprMay 2025: 2.1 h spilling ≈ 818 m³ (range 326-2,053 m³)MayJun 2025: 11 h spilling ≈ 4,088 m³ (range 1,628-10,263 m³)JunJul 2025: 2.6 h spilling ≈ 1,012 m³ (range 403-2,541 m³)JulAug 2025: 5.9 h spilling ≈ 2,297 m³ (range 915-5,767 m³)AugSep 2025: 72 h spilling ≈ 28,032 m³ (range 11,166-70,375 m³)SepOct 2025: 70 h spilling ≈ 27,253 m³ (range 10,855-68,420 m³)OctNov 2025: 397 h spilling ≈ 154,486 m³ (range 61,535-387,842 m³)NovDec 2025: 521 h spilling ≈ 202,996 m³ (range 80,857-509,629 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
15 Dec 2025, 04:56Lydney Sewage Treatment Works5.9 days21,977 - 138,517 m³
11 Nov 2025, 17:01Lydney Sewage Treatment Works5.0 days18,478 - 116,460 m³
1 Dec 2025, 04:20Lydney Sewage Treatment Works4.1 days15,280 - 96,309 m³
5 Dec 2025, 14:52Lydney Sewage Treatment Works2.7 days9,966 - 62,816 m³
9 Dec 2025, 00:05Lydney Sewage Treatment Works2.7 days9,940 - 62,653 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate574,727 m³range 228,926 - 1.4 million m³
In litres574.7 millionrange 228.9 million - 1.4 billion L
Olympic swimming pools230at 2,500 m³ each
Organic load, as people's raw sewage862,090person-days of untreated BOD

Assumed spill rate while spilling: 43.1 - 271.5 L/s (central 108.1 L/s), from a dry-weather flow of 43.1 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 9,157 kg51,725 kg288,575 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 24,037 kg244,259 kg1.0 million kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 435 kg3,621 kg13,419 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3-9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 275 kg1,494 kg7,792 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 22.9 trillion organisms574.7 trillion organisms1.4 × 10¹⁶ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Lydney Sewage Treatment Works

Storm tank at sewage works · discharges to River Severn Estuary

Spills 2025
178 (1,476 hours) · down 9% on 2024
Spills 2024
196 (1,848 hours)
Long-term average
174.3 spills a year (monitored since 2021)
Monitor uptime
90% of the year · Installation set-up/design issue
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
WFD catchment
SEVERN MIDDLE (GB530905415402)
Outlet location
SO6365000550 (OS grid reference) · View on Apple Maps
EA ID / permit
SVT01447 · S/20/26643/R · company name: LYDNEY STW (SSTO)

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024-25 [EA]. Infiltration of groundwater into sewers is taken as 0-40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies - environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 - per capita consumption
  3. HBF: Foul sewer design - historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 - CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Severn Trent Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.