Storm overflow register · Severn Trent Water

Coalport sewage works: storm overflow spills 2025

Coalport sewage treatment works, run by Severn Trent Water, has 2 monitored storm overflows discharging to River Severn. In 2025 they recorded 78 spills totalling 542 hours, against 136 spills and 1,226 hours in 2024. By hours spilling, it ranks 79 of 435 Severn Trent Water works, where 1 spilled longest.

Works size: 72,855 population equivalent (TELFORD SOUTH STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecCoalport Sewage…1 Jan 2025 12:06 GMT, 3.2 h1 Jan 2025 15:19 GMT, 5 min5 Jan 2025 13:52 GMT, 58.8 h8 Jan 2025 00:42 GMT, 8 min27 Jan 2025 00:50 GMT, 21.7 h23 Apr 2025 01:38 GMT, 8 min23 Apr 2025 02:08 GMT, 44 min28 May 2025 12:36 GMT, 77 min20 Jul 2025 18:26 GMT, 3.9 h4 Sep 2025 11:58 GMT, 3.7 h4 Sep 2025 16:00 GMT, 2 h7 Sep 2025 12:30 GMT, 4.2 h14 Sep 2025 16:02 GMT, 7.1 h17 Sep 2025 08:04 GMT, 4.8 h20 Sep 2025 18:32 GMT, 10.1 h4 Nov 2025 19:38 GMT, 6.1 h12 Nov 2025 14:22 GMT, 10.6 h14 Nov 2025 07:26 GMT, 41.2 h29 Nov 2025 04:18 GMT, 14.7 h29 Nov 2025 19:38 GMT, 3.2 h1 Dec 2025 20:00 GMT, 4.4 h5 Dec 2025 16:46 GMT, 32.9 h7 Dec 2025 10:39 GMT, 11.7 h9 Dec 2025 13:08 GMT, 10.5 h12 Dec 2025 10:14 GMT, 5.7 h15 Dec 2025 09:48 GMT, 16.1 h16 Dec 2025 02:01 GMT, 14 min16 Dec 2025 02:34 GMT, 46 min16 Dec 2025 06:18 GMT, 9.1 h16 Dec 2025 16:26 GMT, 53 min16 Dec 2025 18:17 GMT, 3 h17 Dec 2025 20:54 GMT, 44.8 h19 Dec 2025 17:44 GMT, 4.3 hCoalport Sewage…1 Jan 2025 09:05 GMT, 6 min5 Jan 2025 13:41 GMT, 34.1 h6 Jan 2025 23:54 GMT, 5 min27 Jan 2025 00:32 GMT, 4.1 h27 Jan 2025 04:42 GMT, 3 min27 Jan 2025 04:46 GMT, 4 min24 Feb 2025 10:36 GMT, 2.7 h24 Feb 2025 13:49 GMT, 2.3 h15 Apr 2025 20:53 GMT, 2.3 h21 Apr 2025 10:10 GMT, 3.2 h21 Apr 2025 15:48 GMT, 3.5 h23 Apr 2025 00:31 GMT, 110 min23 Apr 2025 03:01 GMT, 2.2 h23 Apr 2025 10:08 GMT, 27 min1 May 2025 18:31 GMT, 3.2 h24 May 2025 01:30 GMT, 98 min27 May 2025 10:16 GMT, 2 h27 May 2025 12:18 GMT, 42 min27 May 2025 13:46 GMT, 2 h27 May 2025 18:10 GMT, 12 min28 May 2025 10:08 GMT, 4.9 h28 May 2025 15:44 GMT, 10 min3 Jun 2025 06:42 GMT, 5 h5 Jun 2025 09:12 GMT, 36 min6 Jun 2025 08:23 GMT, 21 min4 Sep 2025 10:36 GMT, 2.8 h4 Sep 2025 16:29 GMT, 37 min7 Sep 2025 11:26 GMT, 3.1 h7 Sep 2025 15:53 GMT, 2.2 h7 Sep 2025 18:22 GMT, 2 min7 Sep 2025 20:06 GMT, 16 min10 Sep 2025 11:49 GMT, 86 min10 Sep 2025 19:02 GMT, 7 min11 Sep 2025 12:09 GMT, 2.2 h11 Sep 2025 19:26 GMT, 109 min11 Sep 2025 21:39 GMT, 108 min13 Sep 2025 02:56 GMT, 21 min13 Sep 2025 04:33 GMT, 60 min13 Sep 2025 11:14 GMT, 19 min13 Sep 2025 12:53 GMT, 70 min14 Sep 2025 14:42 GMT, 2.7 h14 Sep 2025 18:46 GMT, 2 min14 Sep 2025 18:56 GMT, 3 min14 Sep 2025 19:01 GMT, 3 min14 Sep 2025 21:23 GMT, 111 min15 Sep 2025 09:14 GMT, 15 min17 Sep 2025 04:38 GMT, 3.7 h17 Sep 2025 08:36 GMT, 2.1 h17 Sep 2025 10:59 GMT, 2.3 h17 Sep 2025 13:30 GMT, 3 min17 Sep 2025 13:34 GMT, 10 min17 Sep 2025 13:44 GMT, 3 min17 Sep 2025 15:07 GMT, 2 min17 Sep 2025 15:11 GMT, 2 min17 Sep 2025 17:55 GMT, 2 min17 Sep 2025 17:58 GMT, 16 min20 Sep 2025 14:07 GMT, 9 min20 Sep 2025 18:30 GMT, 113 min20 Sep 2025 23:17 GMT, 30 min21 Sep 2025 00:02 GMT, 18 min14 Nov 2025 09:05 GMT, 2.4 h14 Nov 2025 15:29 GMT, 14.3 h15 Nov 2025 06:00 GMT, 9 min15 Nov 2025 06:17 GMT, 13 min15 Nov 2025 06:50 GMT, 2 min15 Nov 2025 17:26 GMT, 6.1 h29 Nov 2025 19:00 GMT, 91 min1 Dec 2025 21:48 GMT, 2.9 h2 Dec 2025 08:32 GMT, 2 min2 Dec 2025 08:50 GMT, 8 min2 Dec 2025 09:12 GMT, 82 min2 Dec 2025 10:45 GMT, 8 min2 Dec 2025 11:35 GMT, 38 min2 Dec 2025 12:29 GMT, 4 min2 Dec 2025 14:04 GMT, 16 min2 Dec 2025 18:36 GMT, 38 min2 Dec 2025 19:52 GMT, 4 min2 Dec 2025 20:33 GMT, 37 min4 Dec 2025 09:10 GMT, 4.5 h6 Dec 2025 06:42 GMT, 68 min6 Dec 2025 10:32 GMT, 77 min6 Dec 2025 21:42 GMT, 94 min7 Dec 2025 10:34 GMT, 4.8 h7 Dec 2025 15:36 GMT, 71 min7 Dec 2025 17:39 GMT, 55 min7 Dec 2025 19:24 GMT, 58 min7 Dec 2025 21:29 GMT, 29 min9 Dec 2025 04:30 GMT, 2.2 h9 Dec 2025 07:36 GMT, 64 min9 Dec 2025 09:23 GMT, 12.9 h10 Dec 2025 08:30 GMT, 36 min10 Dec 2025 09:24 GMT, 35 min12 Dec 2025 08:25 GMT, 97 min15 Dec 2025 16:46 GMT, 4.8 h15 Dec 2025 21:36 GMT, 2 min16 Dec 2025 12:38 GMT, 16 min17 Dec 2025 21:11 GMT, 3.1 h18 Dec 2025 12:45 GMT, 10.6 h18 Dec 2025 23:18 GMT, 15 min18 Dec 2025 23:35 GMT, 2 min18 Dec 2025 23:40 GMT, 3 min18 Dec 2025 23:47 GMT, 4 min18 Dec 2025 23:57 GMT, 2 min19 Dec 2025 00:06 GMT, 3 min19 Dec 2025 00:27 GMT, 1 min

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

0200k400k600k800kJan 2025: 122 h spilling ≈ 152,795 m³ (range 60,862–383,599 m³)JanFeb 2025: 5.0 h spilling ≈ 6,242 m³ (range 2,486–15,670 m³)FebMar 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MarApr 2025: 15 h spilling ≈ 18,101 m³ (range 7,210–45,443 m³)AprMay 2025: 16 h spilling ≈ 19,973 m³ (range 7,956–50,144 m³)MayJun 2025: 6.0 h spilling ≈ 7,490 m³ (range 2,983–18,804 m³)JunJul 2025: 3.9 h spilling ≈ 4,868 m³ (range 1,939–12,223 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AugSep 2025: 68 h spilling ≈ 84,262 m³ (range 33,563–211,544 m³)SepOct 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)OctNov 2025: 101 h spilling ≈ 125,707 m³ (range 50,072–315,592 m³)NovDec 2025: 206 h spilling ≈ 257,281 m³ (range 102,480–645,913 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
5 Jan 2025, 13:52Coalport Sewage Treatment Works2.5 days29,246 – 184,330 m³
17 Dec 2025, 20:54Coalport Sewage Treatment Works1.9 days22,260 – 140,298 m³
14 Nov 2025, 07:26Coalport Sewage Treatment Works1.7 days20,503 – 129,224 m³
5 Jan 2025, 13:41Coalport Sewage Treatment Works1.4 days16,939 – 106,764 m³
5 Dec 2025, 16:46Coalport Sewage Treatment Works1.4 days16,342 – 103,003 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate676,469 m³range 269,452 – 1.7 million m³
In litres676.5 millionrange 269.5 million – 1.7 billion L
Olympic swimming pools271at 2,500 m³ each
Organic load, as people's raw sewage1.0 millionperson-days of untreated BOD

Assumed spill rate while spilling: 138.1 – 870.5 L/s (central 346.8 L/s), from a dry-weather flow of 138.1 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 10,778 kg60,882 kg339,661 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 28,292 kg287,500 kg1.2 million kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 512 kg4,262 kg15,794 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 323 kg1,759 kg9,171 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 26.9 trillion organisms676.5 trillion organisms1.7 × 10¹⁶ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Coalport Sewage Treatment Works

Storm tank at sewage works · discharges to River Severn

Spills 2025
33 (342 hours) · down 60% on 2024
Spills 2024
83 (892 hours)
Long-term average
66.2 spills a year (monitored since 2020)
Monitor uptime
99% of the year
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
WFD catchment
Severn conf M Wenlock-Farley Bk to conf R Worfe (GB109054049143)
Outlet location
SJ7098201406 (OS grid reference) · View on Apple Maps
EA ID / permit
SVT00590 · S/02/56070/R · company name: COALPORT STW (SSTO)

Coalport Sewage Treatment Works

Inlet overflow at sewage works · discharges to River Severn

Spills 2025
45 (200 hours) · down 15% on 2024
Spills 2024
53 (334 hours)
Long-term average
32.8 spills a year (monitored since 2021)
Monitor uptime
100% of the year
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation completed
Improvement
No improvement action in reporting period
WFD catchment
Severn conf M Wenlock-Farley Bk to conf R Worfe (GB109054049143)
Outlet location
SJ7098201406 (OS grid reference) · View on Apple Maps
EA ID / permit
SVT00591 · S/02/56070/R · company name: COALPORT STW (CSO)

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Severn Trent Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.