Storm overflow register · 2025 annual return

Severn Trent Water storm overflows, 2025

Severn Trent Water reported 2,452 storm overflows in England for 2025. Together they recorded 36,471 spills over 200,361 hours, an average of 14.9 spills per overflow against 20.4 across England. That ranks 2 of 10 companies, where 1 is the fewest spills per overflow. Counting the same overflows in both years, spills were down 41% on 2024.

429 overflows did not spill · 72 spilled more than 60 times · 2,342 had monitors working for 90% of the year or more · 435 sewage treatment works with overflows

Hours spilling by month, 2025

020k40k60kJan 2025: 59,762 hours spillingJanFeb 2025: 8,544 hours spillingFebMar 2025: 2,127 hours spillingMarApr 2025: 992 hours spillingAprMay 2025: 2,015 hours spillingMayJun 2025: 1,050 hours spillingJunJul 2025: 2,845 hours spillingJulAug 2025: 481 hours spillingAugSep 2025: 8,682 hours spillingSepOct 2025: 4,788 hours spillingOctNov 2025: 51,286 hours spillingNovDec 2025: 57,819 hours spillingDec
Hours spilling, all Severn Trent Water overflows, from the start/stop records. Spills running across a month end are split between the months.

All Severn Trent Water storm overflows

Sorted by hours spilling. Open an overflow for its permit, location, reasons for high spills and improvement status.

OverflowDischarges toSpills 2025Hours 2025Spills vs 2024Monitor uptime
Beeston (Lilac Grove) STW
Storm tank at sewage works
Sewage works
Beeston
Company site name
BEESTON -LILAC GROVE STW (SSTO)
EA ID / permit
SVT00234 · T/62/45769/R
Outlet location
SK5409436648 (OS grid reference) · View on Apple Maps
WFD catchment
Trent from Soar to The Beck (GB104028053110)
2024 spills / hours
65 / 584
Long-term average
84.7 spills a year (monitored since 2020)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Monitor below 90%
Installation set-up/design issue · Resolved - January after reporting year
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement ongoing
Volume & pollution
Estimate from 699 hours spilling →
Pasture Lane Dyke 88 699 up 35% 86%
Belle Vale Combined Sewer Overflow
Overflow on sewer network
Company site name
BELLE VALE - CORNGREAVES ROAD (CSO)
EA ID / permit
SVT00240 · S/06/56331/O
Outlet location
SO9519684756 (OS grid reference) · View on Apple Maps
WFD catchment
Stour (Worcs) source to conf Smestow Bk (GB109054044750)
2024 spills / hours
63 / 775
Long-term average
38.8 spills a year (monitored since 2020)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 699 hours spilling →
River Stour 49 699 down 22% 100%
Bamford - Rose Gardens Terminal PS
Storm discharge at pumping station
Company site name
BAMFORD - ROSE GARDENS SPS (SSO)
EA ID / permit
SVT00169 · T/38/40245/O
Outlet location
SK2033182605 (OS grid reference) · View on Apple Maps
WFD catchment
Noe from Peakshole Water to Derwent (GB104028057850)
2024 spills / hours
55 / 444
Long-term average
64.2 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 690 hours spilling →
River Noe 52 690 down 5% 100%
Haxey STW
Storm tank at sewage works
Sewage works
Haxey
Company site name
HAXEY - GRAIZELOUND STW (SSTO)
EA ID / permit
SVT01094 · T/82/45052/R
Outlet location
SK7669498512 (OS grid reference) · View on Apple Maps
WFD catchment
Ferry Drain Catchment (trib of Trent) (GB104028058241)
2024 spills / hours
83 / 1,132
Long-term average
67.8 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 687 hours spilling →
Trib of Ferry Drain 51 687 down 39% 100%
Collingham STW
Storm tank at sewage works
Sewage works
Collingham
Company site name
COLLINGHAM STW (SSTO)
EA ID / permit
SVT00617 · T/69/45554/R
Outlet location
SK8263662794 (OS grid reference) · View on Apple Maps
WFD catchment
The Fleet Upper Catchment (trib of Trent) (GB104028053430)
2024 spills / hours
25 / 333
Long-term average
32.8 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 679 hours spilling →
The Fleet 34 679 up 36% 100%
Coaley Sewage Treatment Works
Storm tank at sewage works
Sewage works
Coaley
Company site name
COALEY STW (SSTO)
EA ID / permit
SVT00588 · S/20/26180/R
Outlet location
SO7563002160 (OS grid reference) · View on Apple Maps
WFD catchment
The Cam R source to conf Glos and Sharpness Canal (GB109054026550)
2024 spills / hours
114 / 1,515
Long-term average
68.4 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 670 hours spilling →
The River Cam 47 670 down 59% 100%
Tewkesbury STW
Storm tank at sewage works
Sewage works
Tewkesbury
Company site name
TEWKESBURY STW (SSTO)
EA ID / permit
SVT02281 · S/17/26480/R
Outlet location
SO8812031860 (OS grid reference) · View on Apple Maps
WFD catchment
Avon - Tolsey Lane to conf R Severn (GB109054039800)
2024 spills / hours
41 / 551
Long-term average
46.3 spills a year (monitored since 2020)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 669 hours spilling →
The Mill Avon 36 669 down 12% 96%
Wymondham Sewage Treatment Works
Inlet overflow at sewage works
Sewage works
Wymondham
Company site name
WYMONDHAM (STW)
EA ID / permit
SVT02644 · T/54/45839/R
Outlet location
SK8503618389 (OS grid reference) · View on Apple Maps
WFD catchment
Wymondham Brook Catchment (trib of Langham Brook) (GB104028047540)
2024 spills / hours
105 / 1,832
Long-term average
59.2 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 669 hours spilling →
Tributary of River Wreake 43 669 down 59% 100%
Hognaston Sewage Treatment Works
Inlet overflow at sewage works
Sewage works
Hognaston
Company site name
HOGNASTON STW (CSO)
EA ID / permit
SVT01157 · T/29/35579/R
Outlet location
SK2376649843 (OS grid reference) · View on Apple Maps
WFD catchment
Henmore Brook Catch (trib of R Dove) (GB104028052700)
2024 spills / hours
102 / 426
Long-term average
85.6 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 667 hours spilling →
Henmore Brook 61 667 down 40% 94%
Duffield STW
Storm tank at sewage works
Sewage works
Duffield
Company site name
DUFFIELD STW (SSTO)
EA ID / permit
SVT00802 · T/44/08090/R
Outlet location
SK3537841387 (OS grid reference) · View on Apple Maps
WFD catchment
Derwent from Amber to Bottle Brook (GB104028052310)
2024 spills / hours
115 / 1,032
Long-term average
128.8 spills a year (monitored since 2020)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 657 hours spilling →
River Derwent 57 657 down 50% 99%
Kirk Langley STW
Storm tank at sewage works (with treatment)
Sewage works
Kirk Langley
Company site name
KIRK LANGLEY STW (SSTO)
EA ID / permit
SVT01288 · T/47/46016/R
Outlet location
SK2931039009 (OS grid reference) · View on Apple Maps
WFD catchment
Mackworth Brook Catchment (trib of Markeaton Brook) (GB104028052840)
Treatment
Reed bed
2024 spills / hours
80 / 993
Long-term average
81.6 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 657 hours spilling →
Flagshaw Brook 63 657 down 21% 99%
Ashford - Buxton Road (CSO)
Overflow on sewer network
EA ID / permit
SVT00445 · Unpermitted
Outlet location
SK1986569486 (OS grid reference) · View on Apple Maps
WFD catchment
Wye from Monk's Dale to Derwent (GB104028057820)
2024 spills / hours
55 / 537
Long-term average
55.6 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 642 hours spilling →
River Wye 42 642 down 24% 97%
Southwell Sewage Treatment Works
Storm tank at sewage works
Sewage works
Southwell
Company site name
SOUTHWELL STW (SSTO)
EA ID / permit
SVT02123 · NPSWQD008782
Outlet location
SK7420951453 (OS grid reference) · View on Apple Maps
WFD catchment
Trent from Soar to The Beck (GB104028053110)
2024 spills / hours
141 / 1,774
Long-term average
97.4 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
UWWTR improvement completed, Operational improvement ongoing
Volume & pollution
Estimate from 639 hours spilling →
River Trent 58 639 down 59% 100%
Ashbourne STW
Storm tank at sewage works
Sewage works
Ashbourne
Company site name
ASHBOURNE STW (SSTO)
EA ID / permit
SVT00118 · T/29/35728/R
Outlet location
SK1632846189 (OS grid reference) · View on Apple Maps
WFD catchment
Bentley Brook Catch (trib of Dove) (GB104028052750)
2024 spills / hours
28 / 248
Long-term average
20.8 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 639 hours spilling →
Bentley Brook 44 639 up 57% 100%
Malvern Sewage Treatment Works
Storm tank at sewage works
Sewage works
Malvern
Company site name
MALVERN STW (SSTO)
EA ID / permit
SVT00180 · S/08/26522/R
Outlet location
SO8366045370 (OS grid reference) · View on Apple Maps
WFD catchment
Severn - conf R Teme to conf R Avon (GB109054039760)
2024 spills / hours
148 / 2,237
Long-term average
93.6 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 637 hours spilling →
River Severn 57 637 down 61% 99%
Newton Solney (East) SPS
Storm discharge at pumping station
Company site name
NEWTON SOLNEY - BLACKSMITHS LANE (SSO)
EA ID / permit
SVT01649 · T/24/12286/O
Outlet location
SK2801025950 (OS grid reference) · View on Apple Maps
WFD catchment
Trent - R Tame to R Dove (GB104028047180)
2024 spills / hours
134 / 1,917
Long-term average
104.7 spills a year (monitored since 2023)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 637 hours spilling →
River Trent (Non-Tidal) 69 637 down 49% 96%
Ridge Lane Mancetter STW
Inlet overflow at sewage works
Sewage works
Ridge Lane Mancetter
Company site name
MANCETTER - RIDGE LANE STW (CSO)
EA ID / permit
SVT01888 · T/15/35759/R
Outlet location
SP2952794543 (OS grid reference) · View on Apple Maps
WFD catchment
Bourne - source to R Tame (GB104028042481)
2024 spills / hours
108 / 885
Long-term average
118.4 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 637 hours spilling →
Tributary of Bourne Brook 67 637 down 38% 100%
Long Whatton STW
Storm tank at sewage works
Sewage works
Long Whatton
Company site name
LONG WHATTON STW (SSTO)
EA ID / permit
SVT01407 · T/57/08423/R
Outlet location
SK4918023330 (OS grid reference) · View on Apple Maps
WFD catchment
Long Whatton Brook Catchment (trib of Soar) (GB104028047170)
2024 spills / hours
74 / 602
Long-term average
101.5 spills a year (monitored since 2020)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 626 hours spilling →
Long Whatton Brook 55 626 down 26% 100%
Eccleshall & Sturbridge STW
Storm tank at sewage works
Sewage works
Eccleshall And Sturbridge
Company site name
ECCLESHALL AND STURBRIDGE STW (SSTO)
EA ID / permit
SVT00840 · T/02/35657/R
Outlet location
SJ8355329525 (OS grid reference) · View on Apple Maps
WFD catchment
Sow - Brockton Bk to Doxey Bk (GB104028047220)
2024 spills / hours
113 / 1,498
Long-term average
66.2 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 617 hours spilling →
River Sow 46 617 down 59% 100%
Buxton Wastewater Treatment Works
Storm tank at sewage works
Sewage works
Buxton
Company site name
BUXTON STW (SSTO)
EA ID / permit
SVT00446 · T/39/45680/R
Outlet location
SK0674272868 (OS grid reference) · View on Apple Maps
WFD catchment
Wye from Source to Monk's Dale (GB104028058460)
2024 spills / hours
67 / 747
Long-term average
88.4 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement ongoing
Volume & pollution
Estimate from 612 hours spilling →
River Wye 60 612 down 10% 99%
Holbury Crescent Pumping Station
Storm discharge at pumping station
Company site name
WHITMINSTER - SCHOOL LANE (CSO)
EA ID / permit
SVT01162 · S/20/25538/O
Outlet location
SO7722008630 (OS grid reference) · View on Apple Maps
WFD catchment
Epney Rhyne - source to conf R Severn Estuary (GB109054032600)
2024 spills / hours
102 / 1,082
Long-term average
71.8 spills a year (monitored since 2020)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 605 hours spilling →
Trib River Severn 53 605 down 48% 99%
Keyworth Sewage Treatment Works
Storm tank at sewage works
Sewage works
Keyworth
Company site name
KEYWORTH STW (SSTO)
EA ID / permit
SVT01252 · T/62/45371/R
Outlet location
SK6051430320 (OS grid reference) · View on Apple Maps
WFD catchment
Fairham Brook Catchment (trib of Trent) (GB104028053150)
2024 spills / hours
60 / 671
Long-term average
66.3 spills a year (monitored since 2020)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 604 hours spilling →
Tributary of Fairham Brook 46 604 down 23% 100%
Sutton Bonington STW
Storm tank at sewage works
Sewage works
Sutton Bonington
Company site name
SUTTON BONINGTON STW (SSTO)
EA ID / permit
SVT02249 · T/57/46002/R
Outlet location
SK4990626232 (OS grid reference) · View on Apple Maps
WFD catchment
Soar from Long Whatton Brook to Trent (GB104028047212)
2024 spills / hours
156 / 1,857
Long-term average
91.4 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 599 hours spilling →
Tributary of River Soar 48 599 down 69% 100%
Ludlow Sewage Treatment Works
Storm tank at sewage works
Sewage works
Ludlow
Company site name
LUDLOW STW (SSTO)
EA ID / permit
SVT01443 · S/09/55809/R
Outlet location
SO5178673272 (OS grid reference) · View on Apple Maps
WFD catchment
Teme - conf R Onny to conf R Severn (GB109054044510)
2024 spills / hours
124 / 1,649
Long-term average
84.8 spills a year (monitored since 2020)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
UWWTR improvement completed, Operational improvement completed
Volume & pollution
Estimate from 583 hours spilling →
River Teme 59 583 down 52% 100%
Laverton Sewage Treatment Works
Storm tank at sewage works
Sewage works
Laverton
Company site name
LAVERTON STW (CSO)
EA ID / permit
SVT01322 · S/18/25216/R
Outlet location
SP0703035874 (OS grid reference) · View on Apple Maps
WFD catchment
Isbourne - source to conf R Avon (GB109054039631)
2024 spills / hours
70 / 528
Long-term average
80.8 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 576 hours spilling →
Tributary of River Isbourne 59 576 down 16% 99%
Brailsford Sewage Treatment Works
Inlet overflow at sewage works (with treatment)
Sewage works
Brailsford
Company site name
BRAILSFORD STW (SSTO)
EA ID / permit
SVT00325 · T/34/36002/R
Outlet location
SK2556040730 (OS grid reference) · View on Apple Maps
WFD catchment
Hilton Bk (trib of R Dove) (GB104028052870)
Treatment
Reed bed
2024 spills / hours
138 / 1,713
Long-term average
51.7 spills a year (monitored since 2020)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 570 hours spilling →
Tributary of Brailsford Brook 74 570 down 46% 97%
Clay Cross Sewage Treatment Works
Storm tank at sewage works
Sewage works
Clay Cross
Company site name
CLAY CROSS STW (SSTO)
EA ID / permit
SVT00570 · T/41/45710/R
Outlet location
SK3880062389 (OS grid reference) · View on Apple Maps
WFD catchment
Press Brook Catchment (trib of Amber) (GB104028052370)
2024 spills / hours
72 / 638
Long-term average
82.2 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 569 hours spilling →
Smithy Brook 60 569 down 17% 100%
Cherington STW
Storm tank at sewage works
Sewage works
Cherington
Company site name
CHERINGTON STW (SSTO)
EA ID / permit
SVT00529 · S/14/26294/R
Outlet location
SP2890636900 (OS grid reference) · View on Apple Maps
WFD catchment
Stour (Warks) - source to conf Nethercote Bk (GB109054039860)
2024 spills / hours
131 / 2,397
Long-term average
110.2 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 568 hours spilling →
River Stour 44 568 down 66% 99%
Harby Sewage Treatment Works
Storm tank at sewage works
Sewage works
Harby
Company site name
HARBY STW (SSTO)
EA ID / permit
SVT01062 · T/66/45609/R
Outlet location
SK7397430704 (OS grid reference) · View on Apple Maps
WFD catchment
Stroom Dyke Catchment (trib of Smite) (GB104028053030)
2024 spills / hours
85 / 1,276
Long-term average
72.8 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 566 hours spilling →
Tributary of Stroom Dyke 51 566 down 40% 100%
Longhope STW
Storm tank at sewage works
Sewage works
Longhope
Company site name
LONGHOPE STW (SSTO)
EA ID / permit
SVT01410 · S/20/08537/R
Outlet location
SO6906017880 (OS grid reference) · View on Apple Maps
WFD catchment
Westbury Bk - source to mouth (GB109054032770)
2024 spills / hours
97 / 1,160
Long-term average
60.2 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 564 hours spilling →
Longhope Brook 44 564 down 55% 100%
Itchen Bank Sewage Treatment Works
Storm tank at sewage works
Sewage works
Itchen Bank
Company site name
ITCHEN BANK STW (SSTO)
EA ID / permit
SVT01223 · S/12/26557/R
Outlet location
SP4067462821 (OS grid reference) · View on Apple Maps
WFD catchment
Itchen - conf R Stowe to conf R Leam (GB109054044110)
2024 spills / hours
121 / 1,834
Long-term average
74.8 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
UWWTR improvement completed, Operational improvement completed
Volume & pollution
Estimate from 561 hours spilling →
River Itchen 53 561 down 56% 100%
Much Wenlock Sewage Treatment Works
Storm tank at sewage works
Sewage works
Much Wenlock
Company site name
MUCH WENLOCK STW (SSTO)
EA ID / permit
SVT01592 · S/02/55942/R
Outlet location
SJ6296300596 (OS grid reference) · View on Apple Maps
WFD catchment
Much Wenlock-Farley Bk - source to conf R Severn (GB109054049390)
2024 spills / hours
75 / 784
Long-term average
54.4 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 559 hours spilling →
Shyte Brook 52 559 down 31% 97%
Laxton Sewage Treatment Works
Inlet overflow at sewage works
Sewage works
Laxton
Company site name
LAXTON STW (CSO&EO)
EA ID / permit
SVT01326 · T/69/45349/R
Outlet location
SK7296166332 (OS grid reference) · View on Apple Maps
WFD catchment
Moorhouse Beck (Trib of Goosemoor Dyke) (GB104028058260)
2024 spills / hours
102 / 1,690
Long-term average
84.4 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 555 hours spilling →
Moorhouse Beck 54 555 down 47% 99%
Lower Lode Lane Pumping Station
Storm discharge at pumping station
Company site name
TEWKESBURY - LOWER LODE (CSO)
EA ID / permit
SVT01432 · S/17/26249/O
Outlet location
SO8870032190 (OS grid reference) · View on Apple Maps
WFD catchment
Avon - Tolsey Lane to conf R Severn (GB109054039800)
2024 spills / hours
110 / 1,292
Long-term average
85.0 spills a year (monitored since 2020)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 551 hours spilling →
Mill Avon 61 551 down 45% 100%
Aslockton Sewage Treatment Works
Storm tank at sewage works
Sewage works
Aslockton
Company site name
ASLOCKTON - SSTO OVERFLOW-3PG
EA ID / permit
SVT00134 · T/67/45582/R
Outlet location
SK7268840586 (OS grid reference) · View on Apple Maps
WFD catchment
Car Dyke (GB104028052501)
2024 spills / hours
150 / 2,000
Long-term average
83.2 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 549 hours spilling →
Tributary of Car Dyke 45 549 down 70% 100%
Rowington Sewage Treatment Works
Inlet overflow at sewage works
Sewage works
Rowington
Company site name
ROWINGTON STW (CSO)
EA ID / permit
SVT01913 · S/15/26102/R
Outlet location
SP1869769716 (OS grid reference) · View on Apple Maps
WFD catchment
Preston Bagot Bk - source to conf R Alne (GB109054043850)
2024 spills / hours
111 / 954
Long-term average
78.8 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 546 hours spilling →
Kingswood Brook 45 546 down 59% 95%
Alvington - St Annes Well SPS
Storm discharge at pumping station
Company site name
ALVINGTON - ST ANNES WELL (CSO)
EA ID / permit
SVT00070 · S/20/21755/O
Outlet location
SO6011000160 (OS grid reference) · View on Apple Maps
WFD catchment
Severn River and Trib Estuary (GB530905415402)
2024 spills / hours
85 / 1,218
Long-term average
56.2 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 538 hours spilling →
Cone Brook 51 538 down 40% 93%
Kemerton Pumping Station
Storm discharge at pumping station
Company site name
KEMERTON SPS (CSO)
EA ID / permit
SVT01243 · S/17/26559/O
Outlet location
SO9419036020 (OS grid reference) · View on Apple Maps
WFD catchment
Carrant Bk - source to conf R Avon (GB109054039851)
2024 spills / hours
118 / 1,725
Long-term average
73.6 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 534 hours spilling →
Kemerton Brook 44 534 down 63% 100%
Twyning Sewage Treatment Works
Storm tank at sewage works
Sewage works
Twyning
Company site name
TWYNING STW (SSTO)
EA ID / permit
SVT02361 · S/17/25353/R
Outlet location
SO9085236932 (OS grid reference) · View on Apple Maps
WFD catchment
Avon conf Workman Br, Evesham to conf R Severn (GB109054044403)
2024 spills / hours
149 / 1,883
Long-term average
98.7 spills a year (monitored since 2020)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
UWWTR improvement ongoing, Operational improvement completed
Volume & pollution
Estimate from 533 hours spilling →
Tributary of River Avon 49 533 down 67% 100%
Lighthorne Heath STW
Inlet overflow at sewage works (with treatment)
Sewage works
Lighthorne Heath
Company site name
LIGHTHORNE HEATH STW (SSTO)
EA ID / permit
SVT01361 · S/13/25884/R
Outlet location
SP3622256831 (OS grid reference) · View on Apple Maps
WFD catchment
Tach Bk - source to conf R Avon (GB109054043740)
Treatment
Reed bed
2024 spills / hours
86 / 419
Long-term average
42.2 spills a year (monitored since 2020)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 530 hours spilling →
Tributary of Tach Brook 41 530 down 52% 100%
Westwood Brook STW
Storm tank at sewage works
Sewage works
Westwood Brook
Company site name
WESTWOOD BROOK STW (SSTO)
EA ID / permit
SVT02528 · T/41/45991/R
Outlet location
SK4202359620 (OS grid reference) · View on Apple Maps
WFD catchment
Westwood Brook Catchment (trib of Alfreton Brook) (GB104028052360)
2024 spills / hours
120 / 1,391
Long-term average
111.8 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 529 hours spilling →
Morton Brook 61 529 down 49% 100%
Beckford Sewage Treatment Works
Storm tank at sewage works
Sewage works
Beckford
Company site name
BECKFORD STW (CSO)
EA ID / permit
SVT00221 · S/17/25751/R
Outlet location
SO9710935246 (OS grid reference) · View on Apple Maps
WFD catchment
Carrant Bk - source to conf R Avon (GB109054039851)
2024 spills / hours
61 / 510
Long-term average
61.8 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
UWWTR improvement ongoing, Operational improvement completed
Volume & pollution
Estimate from 521 hours spilling →
Carrant Brook&Trib of Carrant 37 521 down 39% 96%
Strongford Sewage Treatment Works
Storm tank at sewage works
Sewage works
Strongford
Company site name
STRONGFORD STW (SSTO)
EA ID / permit
SVT02239 · T/01/36052/R
Outlet location
SJ8767039229 (OS grid reference) · View on Apple Maps
WFD catchment
Trent from Fowlea Brook to Tittensor (GB104028053271)
2024 spills / hours
84 / 821
Long-term average
73.8 spills a year (monitored since 2020)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 521 hours spilling →
Yockerton Brook 57 521 down 32% 100%
Cromford - Derby Rd (Bus Shelter) (CSO)
Overflow on sewer network
EA ID / permit
SVT02705 · Unpermitted
Outlet location
SK2956357058 (OS grid reference) · View on Apple Maps
WFD catchment
Derwent from Wye to Amber (GB104028052390)
2024 spills / hours
– / –
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Monitor below 90%
Telemetry or data archiving failure / issue · Resolved - May
Investigation
Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 514 hours spilling →
River Derwent 46 514 65%
Earlswood (Wood End) Sewage PS
Storm discharge at pumping station
Company site name
TAMWORTH IN ARDEN - WOOD END LANE (CSO)
EA ID / permit
SVT00817 · T/11/35906/O
Outlet location
SP1058072080 (OS grid reference) · View on Apple Maps
WFD catchment
Blythe from Source to Cuttle Brook (GB104028042400)
2024 spills / hours
83 / 1,326
Long-term average
59.5 spills a year (monitored since 2024)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 510 hours spilling →
Spring Brook 36 510 down 57% 100%
Colwall CSO
Overflow on sewer network
Company site name
COLWALL - PARK FARM PS (CSO)
EA ID / permit
SVT00620 · S/09/20392/O
Outlet location
SO7384542555 (OS grid reference) · View on Apple Maps
WFD catchment
Cradley Bk - source to conf Suckley Bk (GB109054039910)
2024 spills / hours
81 / 641
Long-term average
64.1 spills a year (monitored since 2019)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 507 hours spilling →
Tributary of Cradley Brook 50 507 down 38% 100%
Pontesbury Sewage Treatment Works
Storm tank at sewage works
Sewage works
Pontesbury
Company site name
PONTESBURY (STW)
EA ID / permit
SVT01809 · S/02/56261/R
Outlet location
SJ3999106576 (OS grid reference) · View on Apple Maps
WFD catchment
Rea Bk - conf Minsterley Bk to conf Pontesford Bk (GB109054049570)
2024 spills / hours
101 / 976
Long-term average
71.6 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 503 hours spilling →
Tributary of Rea Brook 53 503 down 48% 100%
Coventry-Finham WwTW
Storm tank at sewage works
Sewage works
Coventry Finham
Company site name
FINHAM - SSTO OVERFLOW-3PG-FINHAM BROOK
EA ID / permit
SVT02690 · S/11/26637/R
Outlet location
SP3325474303 (OS grid reference) · View on Apple Maps
WFD catchment
Finham Bk - conf Canley Bk to conf R Sowe (GB109054044480)
2024 spills / hours
81 / 1,363
Long-term average
59.0 spills a year (monitored since 2024)
High-spill reason (company)
Performance - Asset configuration (e.g. PS/rising main/storm tanks)
Investigation
UWWTR investigation completed, Operational investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 487 hours spilling →
Finham Brook 37 487 down 54% 100%
Oldcroft - Old Dam Road SPS
Storm discharge at pumping station
Company site name
OLDCROFT - OLD DAM ROAD (CSO)
EA ID / permit
SVT01722 · S/20/25519/O
Outlet location
SO6468905855 (OS grid reference) · View on Apple Maps
WFD catchment
Cannop Bk - source to R Severn Estuary (GB109054032640)
2024 spills / hours
41 / 635
Long-term average
30.4 spills a year (monitored since 2021)
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 481 hours spilling →
Plummers Brook 30 481 down 27% 100%
Blockley Sewage Treatment Works
Storm tank at sewage works
Sewage works
Blockley
Company site name
BLOCKLEY (STW)
EA ID / permit
SVT00297 · S/14/25492/R
Outlet location
SP1817936324 (OS grid reference) · View on Apple Maps
WFD catchment
Blockley Bk - source to conf Knee Bk (GB109054039830)
2024 spills / hours
106 / 2,034
Long-term average
116.6 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 480 hours spilling →
Blockley Brook 32 480 down 70% 100%

Sewage treatment works

Storm tanks and inlet overflows at each Severn Trent Water sewage works. The figures are 2025 spills.

← All water companies · Contains Environment Agency data licensed under the Open Government Licence v3.0. How to read the data.