Storm overflow register · Severn Trent Water

Froghall sewage works: storm overflow spills 2025

Froghall sewage treatment works, run by Severn Trent Water, has 2 monitored storm overflows discharging to River Churnet. In 2025 they recorded 140 spills totalling 1,464 hours, against 164 spills and 1,396 hours in 2024. By hours spilling, it ranks 9 of 435 Severn Trent Water works, where 1 spilled longest.

Works size: 2,789 population equivalent (FROGHALL STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecFroghall Sewage…2 spills, 71.7 h, 1 Jan to 4 Jan5 Jan 2025 14:55 GMT, 83.3 h2 spills, 82.1 h, 26 Jan to 30 Jan2 spills, 41 h, 31 Jan to 2 Feb2 spills, 59.2 h, 23 Feb to 26 Feb2 spills, 44.1 h, 27 May to 29 May2 spills, 6.8 h, 20 Jul to 21 Jul4 Sep 2025 11:24 GMT, 10.9 h2 spills, 9.4 h, 14 Sep to 15 Sep17 Sep 2025 03:51 GMT, 28.2 h20 Sep 2025 14:54 GMT, 37.7 h3 Oct 2025 13:21 GMT, 49.2 h19 Oct 2025 17:38 GMT, 26.8 h4 Nov 2025 18:29 GMT, 22.7 h4 spills, 174 h, 11 Nov to 19 Nov2 spills, 28.5 h, 23 Nov to 24 Nov29 Nov 2025 03:41 GMT, 73 h3 spills, 182.2 h, 4 Dec to 12 Dec15 Dec 2025 07:20 GMT, 220.7 hFroghall Sewage…6 spills, 11.5 h, 1 Jan to 1 Jan11 spills, 22.1 h, 5 Jan to 6 Jan4 spills, 4.8 h, 26 Jan to 27 Jan31 Jan 2025 01:57 GMT, 6.1 h20 Feb 2025 14:54 GMT, 34 min2 spills, 1 h, 23 Feb to 23 Feb28 Mar 2025 04:23 GMT, 93 min23 Apr 2025 01:52 GMT, 3.3 h24 May 2025 01:08 GMT, 58 min5 spills, 4.1 h, 26 May to 28 May29 May 2025 02:21 GMT, 29 min10 Jun 2025 05:06 GMT, 41 min6 Jul 2025 05:38 GMT, 91 min19 Jul 2025 05:26 GMT, 66 min2 spills, 1.4 h, 20 Jul to 20 Jul4 Aug 2025 11:10 GMT, 52 min27 Aug 2025 12:41 GMT, 41 min28 Aug 2025 16:35 GMT, 39 min3 spills, 1.6 h, 30 Aug to 30 Aug1 Sep 2025 13:22 GMT, 37 min3 Sep 2025 12:40 GMT, 55 min4 Sep 2025 09:57 GMT, 4.8 h7 Sep 2025 12:22 GMT, 46 min10 Sep 2025 18:22 GMT, 18 min13 Sep 2025 02:48 GMT, 61 min2 spills, 2.1 h, 14 Sep to 14 Sep3 spills, 7.4 h, 17 Sep to 17 Sep3 spills, 7.5 h, 20 Sep to 21 Sep28 Sep 2025 00:55 GMT, 37 min5 spills, 7.5 h, 3 Oct to 3 Oct7 spills, 7.6 h, 19 Oct to 20 Oct21 Oct 2025 16:55 GMT, 11 min23 Oct 2025 00:47 GMT, 22 min28 Oct 2025 02:25 GMT, 35 min31 Oct 2025 17:07 GMT, 65 min5 spills, 8.7 h, 4 Nov to 5 Nov11 Nov 2025 07:23 GMT, 34 min12 Nov 2025 17:02 GMT, 5.2 h3 spills, 10.9 h, 14 Nov to 15 Nov2 spills, 3.5 h, 18 Nov to 18 Nov22 Nov 2025 04:27 GMT, 90 min3 spills, 3.3 h, 23 Nov to 23 Nov5 spills, 5 h, 28 Nov to 29 Nov1 Dec 2025 19:25 GMT, 60 min2 spills, 4 h, 4 Dec to 4 Dec3 spills, 2.1 h, 5 Dec to 5 Dec2 spills, 1.2 h, 7 Dec to 7 Dec4 spills, 16.5 h, 9 Dec to 10 Dec12 Dec 2025 09:10 GMT, 38 min5 spills, 18.1 h, 15 Dec to 16 Dec8 spills, 20.6 h, 17 Dec to 19 Dec2 spills, 1.5 h, 21 Dec to 22 Dec

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low-high range. Method.

020k40k60kJan 2025: 303 h spilling ≈ 14,485 m³ (range 5,769-36,364 m³)JanFeb 2025: 80 h spilling ≈ 3,837 m³ (range 1,529-9,634 m³)FebMar 2025: 1.6 h spilling ≈ 76 m³ (range 30-192 m³)MarApr 2025: 3.3 h spilling ≈ 158 m³ (range 63-396 m³)AprMay 2025: 50 h spilling ≈ 2,375 m³ (range 946-5,963 m³)MayJun 2025: 0.7 h spilling ≈ 33 m³ (range 13-84 m³)JunJul 2025: 11 h spilling ≈ 516 m³ (range 206-1,296 m³)JulAug 2025: 3.8 h spilling ≈ 182 m³ (range 72-456 m³)AugSep 2025: 112 h spilling ≈ 5,362 m³ (range 2,136-13,461 m³)SepOct 2025: 93 h spilling ≈ 4,459 m³ (range 1,776-11,194 m³)OctNov 2025: 308 h spilling ≈ 14,728 m³ (range 5,867-36,976 m³)NovDec 2025: 497 h spilling ≈ 23,760 m³ (range 9,464-59,651 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
15 Dec 2025, 07:20Froghall Sewage Treatment Works9.2 days4,202 - 26,482 m³
12 Nov 2025, 13:48Froghall Sewage Treatment Works6.0 days2,727 - 17,190 m³
9 Dec 2025, 03:13Froghall Sewage Treatment Works3.5 days1,591 - 10,030 m³
5 Jan 2025, 14:55Froghall Sewage Treatment Works3.5 days1,586 - 9,998 m³
26 Jan 2025, 15:40Froghall Sewage Treatment Works3.4 days1,559 - 9,826 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate69,966 m³range 27,869 - 175,653 m³
In litres70.0 millionrange 27.9 million - 175.7 million L
Olympic swimming pools28at 2,500 m³ each
Organic load, as people's raw sewage104,949person-days of untreated BOD

Assumed spill rate while spilling: 5.3 - 33.3 L/s (central 13.3 L/s), from a dry-weather flow of 5.3 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 1,115 kg6,297 kg35,131 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 2,926 kg29,736 kg126,646 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 53 kg441 kg1,634 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3-9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 33 kg182 kg949 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 2.8 trillion organisms70.0 trillion organisms1.8 × 10¹⁵ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Froghall Sewage Treatment Works

Storm tank at sewage works · discharges to River Churnet

Spills 2025
74 (1,252 hours) · down 13% on 2024
Spills 2024
85 (1,055 hours)
Long-term average
58.8 spills a year (monitored since 2021)
Monitor uptime
100% of the year
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
WFD catchment
Churnet from Consall to River Dove (GB104028052652)
Outlet location
SK0255046950 (OS grid reference) · View on Apple Maps
EA ID / permit
SVT00933 · T/30/35538/R · company name: FROGHALL STW (SSTO)

Froghall Sewage Treatment Works

Inlet overflow at sewage works · discharges to River Churnet

Spills 2025
66 (212 hours) · down 16% on 2024
Spills 2024
79 (341 hours)
Long-term average
83.2 spills a year (monitored since 2021)
Monitor uptime
100% of the year
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement ongoing
WFD catchment
Churnet from Consall to River Dove (GB104028052652)
Outlet location
SK0255046950 (OS grid reference) · View on Apple Maps
EA ID / permit
SVT00934 · T/30/35538/R · company name: FROGHALL STW (CSO)

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024-25 [EA]. Infiltration of groundwater into sewers is taken as 0-40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies - environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 - per capita consumption
  3. HBF: Foul sewer design - historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 - CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Severn Trent Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.