Storm overflow register · Severn Trent Water

Balsall Common sewage works: storm overflow spills 2025

Balsall Common sewage treatment works, run by Severn Trent Water, has 2 monitored storm overflows discharging to Tributary of River Blythe. In 2025 they recorded 104 spills totalling 1,239 hours, against 146 spills and 2,047 hours in 2024. By hours spilling, it ranks 11 of 435 Severn Trent Water works, where 1 spilled longest.

Works size: 6,928 population equivalent (BALSALL COMMON STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecBalsall Common WwTW1 Jan 2025 12:00 GMT, 13.1 h5 spills, 126.9 h, 5 Jan to 10 Jan12 Jan 2025 13:30 GMT, 2.8 h3 spills, 17.3 h, 23 Jan to 24 Jan11 spills, 145.3 h, 26 Jan to 2 Feb4 Feb 2025 22:45 GMT, 60 min4 spills, 56.8 h, 9 Feb to 11 Feb2 spills, 24 h, 15 Feb to 16 Feb8 spills, 29.5 h, 20 Feb to 22 Feb10 spills, 220.9 h, 23 Feb to 5 Mar22 Mar 2025 22:15 GMT, 6.5 h2 spills, 10.6 h, 23 Apr to 23 Apr7 Jun 2025 14:45 GMT, 6.3 h3 spills, 36.4 h, 20 Jul to 22 Jul14 Sep 2025 16:00 GMT, 35.2 h19 Oct 2025 18:16 GMT, 44.2 h9 spills, 134.3 h, 10 Nov to 16 Nov7 spills, 25.9 h, 22 Nov to 23 Nov3 spills, 16.5 h, 29 Nov to 30 Nov3 spills, 27.6 h, 1 Dec to 2 Dec6 Dec 2025 06:48 GMT, 14.1 h4 spills, 5.2 h, 7 Dec to 7 Dec3 spills, 28 h, 9 Dec to 10 Dec4 spills, 4 h, 12 Dec to 12 Dec7 spills, 96.5 h, 15 Dec to 20 Dec22 Dec 2025 11:31 GMT, 41 minBalsall Common WwTW12 spills, 13.8 h, 5 Jan to 6 Jan3 spills, 0.8 h, 27 Jan to 27 Jan2 spills, 0.1 h, 28 Jan to 28 Jan3 spills, 0.5 h, 23 Feb to 24 Feb26 Feb 2025 08:58 GMT, 4 min23 Apr 2025 02:27 GMT, 108 min7 Jun 2025 14:56 GMT, 80 min3 spills, 3.8 h, 21 Jul to 21 Jul14 Sep 2025 16:11 GMT, 83 min2 spills, 0.7 h, 19 Oct to 19 Oct3 spills, 1.3 h, 10 Nov to 10 Nov2 spills, 5.8 h, 12 Nov to 12 Nov2 spills, 24.8 h, 14 Nov to 15 Nov2 spills, 4.3 h, 22 Nov to 22 Nov29 Nov 2025 07:27 GMT, 5.3 h2 spills, 4.6 h, 1 Dec to 1 Dec6 Dec 2025 06:58 GMT, 5 min5 spills, 10.4 h, 9 Dec to 9 Dec3 spills, 7.3 h, 15 Dec to 16 Dec8 spills, 21.5 h, 17 Dec to 19 Dec

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low-high range. Method.

025k50k75k100kJan 2025: 292 h spilling ≈ 34,698 m³ (range 13,821-87,111 m³)JanFeb 2025: 272 h spilling ≈ 32,229 m³ (range 12,837-80,912 m³)FebMar 2025: 95 h spilling ≈ 11,325 m³ (range 4,511-28,431 m³)MarApr 2025: 12 h spilling ≈ 1,472 m³ (range 586-3,695 m³)AprMay 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)MayJun 2025: 7.6 h spilling ≈ 902 m³ (range 359-2,265 m³)JunJul 2025: 40 h spilling ≈ 4,772 m³ (range 1,901-11,980 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)AugSep 2025: 37 h spilling ≈ 4,345 m³ (range 1,731-10,908 m³)SepOct 2025: 45 h spilling ≈ 5,330 m³ (range 2,123-13,381 m³)OctNov 2025: 218 h spilling ≈ 25,902 m³ (range 10,317-65,028 m³)NovDec 2025: 220 h spilling ≈ 26,104 m³ (range 10,398-65,534 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
23 Feb 2025, 12:00Balsall Common WwTW5.7 days6,501 - 40,978 m³
6 Jan 2025, 15:31Balsall Common WwTW3.7 days4,155 - 26,191 m³
26 Jan 2025, 15:07Balsall Common WwTW3.5 days3,984 - 25,108 m³
17 Dec 2025, 22:31Balsall Common WwTW2.2 days2,493 - 15,711 m³
12 Nov 2025, 09:31Balsall Common WwTW2.1 days2,386 - 15,040 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate147,067 m³range 58,580 - 369,216 m³
In litres147.1 millionrange 58.6 million - 369.2 million L
Olympic swimming pools59at 2,500 m³ each
Organic load, as people's raw sewage220,600person-days of untreated BOD

Assumed spill rate while spilling: 13.1 - 82.8 L/s (central 33.0 L/s), from a dry-weather flow of 13.1 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 2,343 kg13,236 kg73,843 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 6,151 kg62,503 kg266,205 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 111 kg927 kg3,434 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3-9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 70 kg382 kg1,994 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 5.9 trillion organisms147.1 trillion organisms3.7 × 10¹⁵ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Balsall Common WwTW

Inlet overflow at sewage works (with treatment) · discharges to Tributary of River Blythe

Spills 2025
77 (1,129 hours) · up 71% on 2024
Spills 2024
45 (658 hours)
Long-term average
29.8 spills a year (monitored since 2021)
Monitor uptime
99% of the year
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation completed
Improvement
UWWTR improvement ongoing, Operational improvement completed
Treatment
Reed bed
WFD catchment
Blythe from Temple Balsall Brook to Patrick Bridge (GB104028042571)
Outlet location
SP2223877770 (OS grid reference) · View on Apple Maps
EA ID / permit
SVT00166 · T/11/35953/R · company name: BALSALL COMMON STW SRBO SPILL 1 (SSTO)

Balsall Common WwTW

Storm tank at sewage works · discharges to Tributary of River Blythe

Spills 2025
27 (110 hours) · down 73% on 2024
Spills 2024
101 (1,389 hours)
Long-term average
84.2 spills a year (monitored since 2021)
Monitor uptime
99% of the year
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
WFD catchment
Blythe from Temple Balsall Brook to Patrick Bridge (GB104028042571)
Outlet location
SP2223877770 (OS grid reference) · View on Apple Maps
EA ID / permit
SVT00165 · T/11/35953/R · company name: BALSALL COMMON STW SSTO SPILL 2 (SSTO)

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024-25 [EA]. Infiltration of groundwater into sewers is taken as 0-40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies - environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 - per capita consumption
  3. HBF: Foul sewer design - historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 - CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Severn Trent Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.