Storm overflow register · Severn Trent Water

Broughton Astley sewage works: storm overflow spills 2025

Broughton Astley sewage treatment works, run by Severn Trent Water, has 1 monitored storm overflow discharging to Broughton Astley Brook. In 2025 it recorded 29 spills totalling 304 hours, against 80 spills and 902 hours in 2024. By hours spilling, it ranks 130 of 435 Severn Trent Water works, where 1 spilled longest.

Works size: 10,638 population equivalent (BROUGHTON ASTLEY STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecBroughton Astley STW5 Jan 2025 14:32 GMT, 57.3 h8 Jan 2025 08:35 GMT, 68 min27 Jan 2025 07:47 GMT, 6.9 h27 Jan 2025 18:17 GMT, 6.1 h28 Jan 2025 03:56 GMT, 74 min28 Jan 2025 07:03 GMT, 16.4 h24 Feb 2025 07:48 GMT, 4.6 h23 Apr 2025 05:16 GMT, 4.2 h14 Sep 2025 18:47 GMT, 103 min12 Nov 2025 10:01 GMT, 12.5 h14 Nov 2025 09:16 GMT, 39.9 h16 Nov 2025 01:25 GMT, 9 min16 Nov 2025 09:55 GMT, 2.5 h16 Nov 2025 12:37 GMT, 18 min22 Nov 2025 12:46 GMT, 34.4 h24 Nov 2025 08:27 GMT, 39 min24 Nov 2025 09:35 GMT, 26 min4 Dec 2025 19:22 GMT, 2.8 h5 Dec 2025 18:46 GMT, 11.5 h6 Dec 2025 06:38 GMT, 8.3 h6 Dec 2025 15:07 GMT, 2.6 h6 Dec 2025 17:46 GMT, 22 min6 Dec 2025 18:19 GMT, 68 min9 Dec 2025 09:34 GMT, 14.7 h10 Dec 2025 08:13 GMT, 82 min10 Dec 2025 09:55 GMT, 7 min16 Dec 2025 05:01 GMT, 21.7 h17 Dec 2025 07:51 GMT, 3.7 h18 Dec 2025 00:06 GMT, 2.1 h18 Dec 2025 08:31 GMT, 86 min18 Dec 2025 12:59 GMT, 35.8 h20 Dec 2025 09:37 GMT, 4.2 h20 Dec 2025 14:10 GMT, 21 min22 Dec 2025 10:44 GMT, 107 min

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

020k40k60kJan 2025: 89 h spilling ≈ 16,241 m³ (range 6,469–40,773 m³)JanFeb 2025: 4.6 h spilling ≈ 838 m³ (range 334–2,105 m³)FebMar 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MarApr 2025: 4.2 h spilling ≈ 766 m³ (range 305–1,922 m³)AprMay 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MayJun 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JunJul 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AugSep 2025: 1.7 h spilling ≈ 310 m³ (range 123–778 m³)SepOct 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)OctNov 2025: 91 h spilling ≈ 16,551 m³ (range 6,592–41,551 m³)NovDec 2025: 114 h spilling ≈ 20,761 m³ (range 8,270–52,122 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
5 Jan 2025, 14:32Broughton Astley STW2.4 days4,159 – 26,214 m³
14 Nov 2025, 09:16Broughton Astley STW1.7 days2,899 – 18,274 m³
18 Dec 2025, 12:59Broughton Astley STW1.5 days2,597 – 16,367 m³
22 Nov 2025, 12:46Broughton Astley STW1.4 days2,495 – 15,727 m³
16 Dec 2025, 05:01Broughton Astley STW21.7 h1,578 – 9,945 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate55,485 m³range 22,101 – 139,297 m³
In litres55.5 millionrange 22.1 million – 139.3 million L
Olympic swimming pools22at 2,500 m³ each
Organic load, as people's raw sewage83,227person-days of untreated BOD

Assumed spill rate while spilling: 20.2 – 127.1 L/s (central 50.6 L/s), from a dry-weather flow of 20.2 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 884 kg4,994 kg27,859 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 2,321 kg23,581 kg100,433 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 42 kg350 kg1,295 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 27 kg144 kg752 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 2.2 trillion organisms55.5 trillion organisms1.4 × 10¹⁵ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Broughton Astley STW

Storm tank at sewage works · discharges to Broughton Astley Brook

Spills 2025
29 (304 hours) · down 64% on 2024
Spills 2024
80 (902 hours)
Long-term average
50.2 spills a year (monitored since 2021)
Monitor uptime
99% of the year
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
Operational improvement ongoing
WFD catchment
Soar from Soar Brook to Thurlaston Brook (GB104028042620)
Outlet location
SP5248994801 (OS grid reference) · View on Apple Maps
EA ID / permit
SVT00393 · T/50/45321/R · company name: BROUGHTON ASTLEY STW (SSTO)

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Severn Trent Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.