Storm overflow register · Severn Trent Water

Coventry Finham sewage works: storm overflow spills 2025

Coventry Finham sewage treatment works, run by Severn Trent Water, has 2 monitored storm overflows discharging to Finham Brook, River Sowe. In 2025 they recorded 62 spills totalling 826 hours, against 142 spills and 2,122 hours in 2024. By hours spilling, it ranks 37 of 435 Severn Trent Water works, where 1 spilled longest.

Works size: 464,014 population equivalent (COVENTRY STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecCoventry-Finham WwTW5 Jan 2025 23:52 GMT, 62 h27 Jan 2025 05:25 GMT, 54.7 h24 Feb 2025 00:05 GMT, 28.7 h23 Apr 2025 04:07 GMT, 17.7 h19 Jul 2025 10:56 GMT, 13.7 h20 Jul 2025 10:58 GMT, 18 h21 Jul 2025 18:20 GMT, 10.4 h14 Sep 2025 17:33 GMT, 12.3 h10 Nov 2025 04:50 GMT, 24.2 h12 Nov 2025 08:22 GMT, 22.8 h14 Nov 2025 08:17 GMT, 65.1 h22 Nov 2025 15:49 GMT, 37.4 h2 Dec 2025 01:08 GMT, 14.6 h9 Dec 2025 07:05 GMT, 28.2 h16 Dec 2025 07:52 GMT, 22.9 h18 Dec 2025 01:40 GMT, 54.8 hCoventry-Finham WwTW6 Jan 2025 01:31 GMT, 49.3 h27 Jan 2025 22:50 GMT, 4.7 h20 Jul 2025 12:42 GMT, 19 min20 Jul 2025 18:42 GMT, 34 min3 Sep 2025 08:56 GMT, 76 min3 Sep 2025 10:57 GMT, 15 min10 Nov 2025 07:06 GMT, 26 h11 Nov 2025 09:19 GMT, 36 min12 Nov 2025 01:49 GMT, 32.6 h13 Nov 2025 12:10 GMT, 20 min13 Nov 2025 12:30 GMT, 20 min13 Nov 2025 13:04 GMT, 26 min14 Nov 2025 07:07 GMT, 21 min14 Nov 2025 07:32 GMT, 23 min14 Nov 2025 08:30 GMT, 51.3 h16 Nov 2025 15:21 GMT, 18.2 h17 Nov 2025 10:03 GMT, 20 min17 Nov 2025 10:36 GMT, 24 min17 Nov 2025 11:40 GMT, 19 min22 Nov 2025 16:20 GMT, 41.4 h24 Nov 2025 11:22 GMT, 11 min6 Dec 2025 19:56 GMT, 8.8 h7 Dec 2025 05:00 GMT, 37 min9 Dec 2025 07:20 GMT, 26 h10 Dec 2025 09:33 GMT, 71 min10 Dec 2025 10:45 GMT, 43 min10 Dec 2025 12:07 GMT, 11 min16 Dec 2025 08:52 GMT, 17.1 h18 Dec 2025 02:37 GMT, 53.9 h20 Dec 2025 08:45 GMT, 37 min

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

02M4M6M8MJan 2025: 171 h spilling ≈ 1.4 million m³ (range 540,272–3.4 million m³)JanFeb 2025: 29 h spilling ≈ 228,183 m³ (range 90,890–572,862 m³)FebMar 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MarApr 2025: 18 h spilling ≈ 140,726 m³ (range 56,054–353,298 m³)AprMay 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MayJun 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JunJul 2025: 43 h spilling ≈ 341,876 m³ (range 136,177–858,294 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AugSep 2025: 14 h spilling ≈ 109,719 m³ (range 43,703–275,453 m³)SepOct 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)OctNov 2025: 323 h spilling ≈ 2.6 million m³ (range 1.0 million–6.4 million m³)NovDec 2025: 230 h spilling ≈ 1.8 million m³ (range 726,803–4.6 million m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
14 Nov 2025, 08:17Coventry-Finham WwTW2.7 days206,270 – 1.3 million m³
5 Jan 2025, 23:52Coventry-Finham WwTW2.6 days196,189 – 1.2 million m³
18 Dec 2025, 01:40Coventry-Finham WwTW2.3 days173,493 – 1.1 million m³
27 Jan 2025, 05:25Coventry-Finham WwTW2.3 days173,124 – 1.1 million m³
18 Dec 2025, 02:37Coventry-Finham WwTW2.2 days170,643 – 1.1 million m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate6.6 million m³range 2.6 million – 16.5 million m³
In litres6.6 billionrange 2.6 billion – 16.5 billion L
Olympic swimming pools2,627at 2,500 m³ each
Organic load, as people's raw sewage9.9 millionperson-days of untreated BOD

Assumed spill rate while spilling: 879.7 – 5,544.5 L/s (central 2,208.5 L/s), from a dry-weather flow of 879.7 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 104,647 kg591,120 kg3.3 million kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 274,698 kg2.8 million kg11.9 million kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 4,971 kg41,378 kg153,350 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 3,139 kg17,077 kg89,042 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 261.6 trillion organisms6.6 × 10¹⁵ organisms1.6 × 10¹⁷ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Coventry-Finham WwTW

Storm tank at sewage works · discharges to Finham Brook

Spills 2025
37 (487 hours) · down 54% on 2024
Spills 2024
81 (1,363 hours)
Long-term average
59.0 spills a year (monitored since 2024)
Monitor uptime
100% of the year
High-spill reason (company)
Performance - Asset configuration (e.g. PS/rising main/storm tanks)
Investigation
UWWTR investigation completed, Operational investigation ongoing
Improvement
No improvement action in reporting period
WFD catchment
Finham Bk - conf Canley Bk to conf R Sowe (GB109054044480)
Outlet location
SP3325474303 (OS grid reference) · View on Apple Maps
EA ID / permit
SVT02690 · S/11/26637/R · company name: FINHAM - SSTO OVERFLOW-3PG-FINHAM BROOK

Coventry-Finham WwTW

Storm tank at sewage works · discharges to River Sowe

Spills 2025
25 (339 hours) · down 59% on 2024
Spills 2024
61 (760 hours)
Long-term average
35.0 spills a year (monitored since 2021)
Monitor uptime
100% of the year
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation completed
Improvement
UWWTR improvement completed, Operational improvement completed
WFD catchment
Sowe - conf Withy Bk to conf R Avon (GB109054044540)
Outlet location
SP3380173877 (OS grid reference) · View on Apple Maps
EA ID / permit
SVT00660 · S/11/26637/R · company name: FINHAM - SSTO OVERFLOW-3PG-RIVER SOWE

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Severn Trent Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.