Storm overflow register · Severn Trent Water

Chilcote Rbc sewage works: storm overflow spills 2025

Chilcote Rbc sewage treatment works, run by Severn Trent Water, has 1 monitored storm overflow discharging to Chilcote Brook. In 2025 it recorded 72 spills totalling 133 hours, against 80 spills and 245 hours in 2024. By hours spilling, it ranks 232 of 435 Severn Trent Water works, where 1 spilled longest.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecChilcote Rbc Sewage…1 Jan 2025 07:51 GMT, 108 min8 spills, 29.8 h, 5 Jan to 6 Jan24 Jan 2025 06:24 GMT, 11 min5 spills, 6.3 h, 26 Jan to 28 Jan31 Jan 2025 02:12 GMT, 82 min4 Feb 2025 15:43 GMT, 10 min21 Feb 2025 20:27 GMT, 8 min2 spills, 1.8 h, 23 Feb to 24 Feb26 Feb 2025 08:58 GMT, 11 min21 Apr 2025 16:40 GMT, 18 min23 Apr 2025 01:10 GMT, 4 h1 May 2025 21:30 GMT, 43 min24 May 2025 00:55 GMT, 100 min3 spills, 6.5 h, 27 May to 27 May3 Jun 2025 07:35 GMT, 48 min3 spills, 3.4 h, 5 Jun to 5 Jun7 Jun 2025 16:03 GMT, 48 min12 Jun 2025 13:40 GMT, 13 min21 Jun 2025 09:55 GMT, 30 min25 Jun 2025 14:05 GMT, 49 min1 Jul 2025 14:07 GMT, 27 min2 Jul 2025 14:25 GMT, 10 min5 spills, 7.5 h, 6 Jul to 7 Jul2 spills, 1.3 h, 15 Jul to 15 Jul18 Jul 2025 13:46 GMT, 28 min8 spills, 5.6 h, 19 Jul to 21 Jul25 Jul 2025 14:32 GMT, 33 min28 Jul 2025 10:51 GMT, 15 min7 Aug 2025 16:02 GMT, 55 min21 Aug 2025 08:55 GMT, 25 min22 Aug 2025 06:30 GMT, 65 min2 spills, 0.3 h, 23 Aug to 23 Aug2 spills, 1 h, 4 Sep to 4 Sep4 spills, 1.3 h, 11 Sep to 11 Sep3 spills, 3.1 h, 14 Sep to 14 Sep17 Sep 2025 05:10 GMT, 15 min2 spills, 0.9 h, 20 Sep to 21 Sep3 Oct 2025 20:33 GMT, 38 min4 spills, 1.2 h, 18 Oct to 18 Oct3 spills, 1.5 h, 19 Oct to 19 Oct3 spills, 2.8 h, 20 Oct to 21 Oct2 spills, 0.7 h, 29 Oct to 29 Oct2 spills, 0.4 h, 1 Nov to 1 Nov4 Nov 2025 18:20 GMT, 111 min2 spills, 1.8 h, 10 Nov to 10 Nov11 Nov 2025 21:53 GMT, 116 min6 spills, 15.2 h, 14 Nov to 15 Nov19 Nov 2025 00:01 GMT, 18 min2 spills, 0.9 h, 22 Nov to 22 Nov2 spills, 0.9 h, 23 Nov to 23 Nov4 spills, 3.1 h, 28 Nov to 29 Nov2 spills, 0.4 h, 1 Dec to 1 Dec2 spills, 0.6 h, 9 Dec to 9 Dec10 Dec 2025 09:04 GMT, 38 min12 Dec 2025 10:36 GMT, 47 min2 spills, 1.3 h, 15 Dec to 16 Dec2 spills, 9.3 h, 18 Dec to 18 Dec

Hours spilling by month, 2025

010203040Jan 2025: 40 hours spillingJanFeb 2025: 2.3 hours spillingFebMar 2025: 0.0 hours spillingMarApr 2025: 4.3 hours spillingAprMay 2025: 8.8 hours spillingMayJun 2025: 6.5 hours spillingJunJul 2025: 16 hours spillingJulAug 2025: 2.7 hours spillingAugSep 2025: 6.5 hours spillingSepOct 2025: 6.7 hours spillingOctNov 2025: 26 hours spillingNovDec 2025: 13 hours spillingDec
Hours, measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDuration
5 Jan 2025, 21:23Chilcote Rbc Sewage Treatment Works1.1 days
18 Dec 2025, 13:03Chilcote Rbc Sewage Treatment Works9.0 h
14 Nov 2025, 14:53Chilcote Rbc Sewage Treatment Works7.9 h
23 Apr 2025, 01:10Chilcote Rbc Sewage Treatment Works4.0 h
27 May 2025, 09:40Chilcote Rbc Sewage Treatment Works4.0 h

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

This works serves fewer than 2,000 people, or was not matched to a UWWTD report, so its size is not published. The population equivalent above is a placeholder of 1,000. Enter the population served if you know it.

Volume, central estimate2,279 m³range 908 - 5,721 m³
In litres2.3 millionrange 907,725 - 5.7 million L
Olympic swimming pools0.9at 2,500 m³ each
Organic load, as people's raw sewage3,418person-days of untreated BOD

Assumed spill rate while spilling: 1.9 - 11.9 L/s (central 4.8 L/s), from a dry-weather flow of 1.9 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 36 kg205 kg1,144 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 95 kg969 kg4,125 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 1.7 kg14 kg53 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3-9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 1.1 kg5.9 kg31 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 90.8 billion organisms2.3 trillion organisms57.2 trillion organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Chilcote Rbc Sewage Treatment Works

Storm tank at sewage works · discharges to Chilcote Brook

Spills 2025
72 (133 hours) · down 10% on 2024
Spills 2024
80 (245 hours)
Long-term average
63.2 spills a year (monitored since 2021)
Monitor uptime
97% of the year
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
WFD catchment
Mease from Hooborough Brook to Trent (GB104028046560)
Outlet location
SK2785910979 (OS grid reference) · View on Apple Maps
EA ID / permit
SVT00537 · T/23/36154/R · company name: CHILCOTE RBC (CSO)

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024-25 [EA]. Infiltration of groundwater into sewers is taken as 0-40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies - environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 - per capita consumption
  3. HBF: Foul sewer design - historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 - CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Severn Trent Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.