Storm overflow register · 2025 annual return

Southern Water storm overflows, 2025

Southern Water reported 977 storm overflows in England for 2025. Together they recorded 15,554 spills over 114,868 hours, an average of 15.9 spills per overflow against 20.4 across England. That ranks 4 of 10 companies, where 1 is the fewest spills per overflow. Counting the same overflows in both years, spills were down 47% on 2024.

175 overflows did not spill · 42 spilled more than 60 times · 862 had monitors working for 90% of the year or more · 215 sewage treatment works with overflows

Hours spilling by month, 2025

010k20k30k40kJan 2025: 38,729 hours spillingJanFeb 2025: 17,875 hours spillingFebMar 2025: 4,010 hours spillingMarApr 2025: 1,990 hours spillingAprMay 2025: 746 hours spillingMayJun 2025: 804 hours spillingJunJul 2025: 2,044 hours spillingJulAug 2025: 883 hours spillingAugSep 2025: 4,161 hours spillingSepOct 2025: 8,831 hours spillingOctNov 2025: 6,321 hours spillingNovDec 2025: 28,488 hours spillingDec
Hours spilling, all Southern Water overflows, from the start/stop records. Spills running across a month end are split between the months.

All Southern Water storm overflows

Sorted by hours spilling. Open an overflow for its permit, location, reasons for high spills and improvement status.

OverflowDischarges toSpills 2025Hours 2025Spills vs 2024Monitor uptime
St Helens WwTW
Storm tank at sewage works
Sewage works
St Helens
Company site name
ST HELENS SSO - 115440
EA ID / permit
SWS00811 · A00198
Outlet location
SZ6255088320 (OS grid reference) · View on Apple Maps
WFD catchment
Eastern Yar (Lower) (GB107101005971)
Bathing water
Bembridge; Seagrove; St Helens
Shellfish water
Ryde
2024 spills / hours
143 / 2,199
Long-term average
93.8 spills a year (monitored since 2016)
High-spill reason (company)
Performance - GW inundation
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 516 hours spilling →
Tributary of the Eastern Yar 57 516 down 60% 100%
Smarden Wastewater Treatment Works
Storm tank at sewage works
Sewage works
Smarden
Company site name
SMARDEN SSO - 115863
EA ID / permit
SWS00784 · W00486
Outlet location
TQ8776042250 (OS grid reference) · View on Apple Maps
WFD catchment
Beult (GB106040018270)
2024 spills / hours
68 / 1,092
Long-term average
59.7 spills a year (monitored since 2019)
High-spill reason (company)
Performance - GW inundation
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 516 hours spilling →
The River Beult 41 516 down 40% 98%
Barcombe New S.T.W.
Storm tank at sewage works
Sewage works
Barcombe New S T W
Company site name
BARCOMBE NEW SSO - 115373
EA ID / permit
SWS00039 · W00362
Outlet location
TQ4141016690 (OS grid reference) · View on Apple Maps
WFD catchment
Bevern Stream (GB107041012570)
2024 spills / hours
105 / 867
Long-term average
69.1 spills a year (monitored since 2016)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 510 hours spilling →
Bevern Stream 49 510 down 53% 100%
Flexford Lane Sway WwTW
Storm tank at sewage works
Sewage works
Flexford Lane Sway
Company site name
FLEXFORD LANE SWAY SSO - 115913
EA ID / permit
SWS00318 · W00244
Outlet location
SZ2888096570 (OS grid reference) · View on Apple Maps
WFD catchment
Avon Water (GB107042011300)
Shellfish water
Pennington
2024 spills / hours
132 / 2,303
Long-term average
68.4 spills a year (monitored since 2017)
High-spill reason (company)
Performance - GW inundation
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 508 hours spilling →
Avon Water 43 508 down 67% 100%
Cowden WwTW, Cowden, Tunbridge Well
Storm tank at sewage works
Sewage works
Cowden Cowden Tunbridge Well
Company site name
COWDEN SSO - 115723
EA ID / permit
SWS00213 · W00024
Outlet location
TQ4665040170 (OS grid reference) · View on Apple Maps
WFD catchment
Kent Water (GB106040018090)
2024 spills / hours
72 / 793
Long-term average
43.6 spills a year (monitored since 2016)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 506 hours spilling →
Kent Water 47 506 down 35% 100%
Henderson Road Eastney Wps
Inlet overflow at sewage works
Sewage works
Henderson Road Eastney Wps
Company site name
HENDERSON ROAD EASTNEY CSO - 111912
EA ID / permit
SWS00416 · A00754
Outlet location
SZ6679093250 (OS grid reference) · View on Apple Maps
WFD catchment
Solent (GB650705150000)
Bathing water
Beachlands Central; Beachlands West; Eastney; Southsea East
Shellfish water
Chichester Harbour (Emsworth Channel); Langstone Harbour; Portsmouth Harbour; Spithead and Stokes Bay
2024 spills / hours
124 / 884
Long-term average
97.6 spills a year (monitored since 2016)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing, Bathing Water and/or Shellfish Water investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 500 hours spilling →
The Solent 86 500 down 31% 98%
Cowfold WwTW
Storm tank at sewage works
Sewage works
Cowfold
Company site name
COWFOLD SSO - 115726
EA ID / permit
SWS00216 · W00356
Outlet location
TQ2153021970 (OS grid reference) · View on Apple Maps
WFD catchment
Cowfold Stream (GB107041012260)
2024 spills / hours
71 / 954
Long-term average
49.3 spills a year (monitored since 2018)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 500 hours spilling →
Cowfold Stream Trib River Adur 45 500 down 37% 100%
Hailsham North WwTW
Storm tank at sewage works
Sewage works
Hailsham North
Company site name
HAILSHAM NORTH SSO - 115733
EA ID / permit
SWS00383 · A01166
Outlet location
TQ6017010650 (OS grid reference) · View on Apple Maps
WFD catchment
Hurst Haven at Hailsham (GB107041012500)
2024 spills / hours
77 / 897
Long-term average
52.8 spills a year (monitored since 2016)
High-spill reason (company)
Performance - GW inundation
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 494 hours spilling →
Tributary of the Hurst Haven 49 494 down 36% 100%
Redgate Mill Crowborough WwTW
Storm tank at sewage works
Sewage works
Redgate Mill Crowborough
Company site name
REDGATE MILL CROWBOROUGH SSO - 115803
EA ID / permit
SWS00701 · W00479
Outlet location
TQ5523032520 (OS grid reference) · View on Apple Maps
WFD catchment
Eridge Stream (GB106040018390)
2024 spills / hours
99 / 1,152
Long-term average
65.6 spills a year (monitored since 2016)
High-spill reason (company)
Performance - GW inundation
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 491 hours spilling →
Eridge Stream 44 491 down 56% 100%
Cuckfield WwTW
Storm tank at sewage works
Sewage works
Cuckfield
Company site name
NEWBURY LANE CUCKFIELD SSO - 115919
EA ID / permit
SWS00240 · W00406
Outlet location
TQ3033023710 (OS grid reference) · View on Apple Maps
WFD catchment
Copyhold Stream (GB107041012240)
2024 spills / hours
86 / 1,077
Long-term average
55.8 spills a year (monitored since 2019)
High-spill reason (company)
Performance - GW inundation
Investigation
UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 484 hours spilling →
Trib of River Adur 47 484 down 45% 100%
West Hoathly S.T.W.
Storm tank at sewage works
Sewage works
West Hoathly S T W
Company site name
WEST HOATHLY SSO - 115792
EA ID / permit
SWS00923 · W00020
Outlet location
TQ3748033510 (OS grid reference) · View on Apple Maps
WFD catchment
Medway at Weir Wood (GB106040018070)
2024 spills / hours
54 / 503
Long-term average
29.4 spills a year (monitored since 2017)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 484 hours spilling →
The Coombe Brook 44 484 down 19% 100%
Fairlee Combined Sewer Overflow
Storm discharge at pumping station
Company site name
FAIRLEE CSO - 111781
EA ID / permit
SWS00293 · NPSWQD000451
Outlet location
SZ5051091250 (OS grid reference) · View on Apple Maps
WFD catchment
MEDINA (GB520710101600)
Shellfish water
Cowes and Medina
2024 spills / hours
79 / 1,053
Long-term average
74.9 spills a year (monitored since 2016)
High-spill reason (company)
Performance - GW inundation
Investigation
UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 480 hours spilling →
River Medina 52 480 down 34% 100%
Northchapel WwTW
Storm tank at sewage works
Sewage works
Northchapel
Company site name
NORTHCHAPEL SSO - 115788
EA ID / permit
SWS00617 · W00364
Outlet location
SU9525029030 (OS grid reference) · View on Apple Maps
WFD catchment
R. Kird (GB107041012300)
2024 spills / hours
83 / 1,105
Long-term average
48.6 spills a year (monitored since 2016)
High-spill reason (company)
Performance - GW inundation
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 471 hours spilling →
River Kird 40 471 down 52% 100%
Petersfield WwTW
Storm tank at sewage works
Sewage works
Petersfield
Company site name
PETERSFIELD SSO - 115721
EA ID / permit
SWS00658 · W00424
Outlet location
SU7710022760 (OS grid reference) · View on Apple Maps
WFD catchment
Stanbridge Stream (GB107041012790)
2024 spills / hours
49 / 331
Long-term average
43.0 spills a year (monitored since 2019)
High-spill reason (company)
Performance - GW inundation
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 459 hours spilling →
Criddell Stream 41 459 down 16% 100%
Quickbourne Lane Northiam WwTW
Storm tank at sewage works
Sewage works
Quickbourne Lane Northiam
Company site name
QUICKBOURNE LANE NORTHIAM SSO - 115929
EA ID / permit
SWS00693 · A00002
Outlet location
TQ8354025720 (OS grid reference) · View on Apple Maps
WFD catchment
Lower Rother from Robertsbridge to Iden (GB107040013640)
2024 spills / hours
114 / 1,488
Long-term average
87.1 spills a year (monitored since 2018)
High-spill reason (company)
Performance - GW inundation
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 458 hours spilling →
The Goddens Gill 47 458 down 59% 100%
Vines Cross WwTW
Storm tank at sewage works
Sewage works
Vines Cross
Company site name
VINES CROSS SSO - 115888
EA ID / permit
SWS00903 · W00013
Outlet location
TQ5933016910 (OS grid reference) · View on Apple Maps
WFD catchment
Waldron Ghyll (GB107041012391)
2024 spills / hours
78 / 1,124
Long-term average
46.9 spills a year (monitored since 2018)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 457 hours spilling →
Waldron Ghyll 43 457 down 45% 100%
Laughton CSO
Storm discharge at pumping station
Company site name
LAUGHTON CSO - 108272
EA ID / permit
SWS00495 · W00436
Outlet location
TQ5014012430 (OS grid reference) · View on Apple Maps
WFD catchment
Glynde Reach (GB107041012510)
2024 spills / hours
81 / 962
Long-term average
45.6 spills a year (monitored since 2017)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 455 hours spilling →
Tributary of Glynde Reach 47 455 down 42% 92%
Shorwell WwTW
Storm tank at sewage works
Sewage works
Shorwell
Company site name
SHORWELL SSO - 115754
EA ID / permit
SWS00772 · A00197
Outlet location
SZ4492082340 (OS grid reference) · View on Apple Maps
WFD catchment
Brighstone Streams (GB107101005940)
2024 spills / hours
78 / 842
Long-term average
49.6 spills a year (monitored since 2017)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 441 hours spilling →
Shorwell Stream 42 441 down 46% 100%
Brockenhurst WwTW
Storm tank at sewage works
Sewage works
Brockenhurst
Company site name
BROCKENHURST SSO - 115374
EA ID / permit
SWS00109 · W00311
Outlet location
SU3090002600 (OS grid reference) · View on Apple Maps
WFD catchment
Lymington River (GB107042011220)
2024 spills / hours
119 / 1,687
Long-term average
86.8 spills a year (monitored since 2016)
High-spill reason (company)
Performance - GW inundation
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 439 hours spilling →
Lymington River 52 439 down 56% 100%
Millbrook WwTW
Storm tank at sewage works
Sewage works
Millbrook
Company site name
MILLBROOK SSO - 115420
EA ID / permit
SWS00579 · A00016
Outlet location
SU3871011760 (OS grid reference) · View on Apple Maps
WFD catchment
SOUTHAMPTON WATER (GB520704202800)
Shellfish water
Southampton Water
2024 spills / hours
99 / 1,556
Long-term average
61.6 spills a year (monitored since 2016)
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 439 hours spilling →
The River Test 28 439 down 72% 100%
Hartfield Road CSO
Storm discharge at pumping station
Company site name
HARTFIELD ROAD FOREST ROW CSO - 103306
EA ID / permit
SWS00402 · A01340
Outlet location
TQ4386034950 (OS grid reference) · View on Apple Maps
WFD catchment
Medway at Weir Wood (GB106040018070)
2024 spills / hours
95 / 979
Long-term average
54.4 spills a year (monitored since 2019)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 438 hours spilling →
The River Medway 56 438 down 41% 100%
Chickenhall Eastleigh WwTW
Storm tank at sewage works
Sewage works
Chickenhall Eastleigh
Company site name
CHICKENHALL EASTLEIGH SSO - 115771
EA ID / permit
SWS00174 · A00154
Outlet location
SU4681017880 (OS grid reference) · View on Apple Maps
WFD catchment
River Itchen (GB107042022580)
2024 spills / hours
73 / 1,000
Long-term average
42.6 spills a year (monitored since 2016)
High-spill reason (company)
Performance - GW inundation
Investigation
UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 436 hours spilling →
The River Itchen 31 436 down 58% 100%
Sidlesham WwTW
Storm tank at sewage works
Sewage works
Sidlesham
Company site name
SIDLESHAM SSO - 115807
EA ID / permit
SWS00774 · W00384
Outlet location
SZ8512096100 (OS grid reference) · View on Apple Maps
WFD catchment
Broad Rife (GB107041006580)
Bathing water
Pagham
2024 spills / hours
57 / 789
Long-term average
53.4 spills a year (monitored since 2018)
High-spill reason (company)
Performance - GW inundation
Investigation
UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 436 hours spilling →
The Broad Rife 37 436 down 35% 100%
Marshall Close CSO - Barnham
Overflow on sewer network
Company site name
MARSHALL CLOSE BARNHAM CSO - 108037
EA ID / permit
SWS00557 · A01121
Outlet location
SU9592004280 (OS grid reference) · View on Apple Maps
WFD catchment
Lidsey Rife (GB107041012010)
2024 spills / hours
124 / 1,150
Long-term average
64.4 spills a year (monitored since 2016)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 434 hours spilling →
Barnham Rife 71 434 down 43% 100%
Lewes Road Lindfield Wps
Storm discharge at pumping station
Company site name
LEWES ROAD LINDFIELD CEO - 108273
EA ID / permit
SWS00502 · W00410
Outlet location
TQ3501024920 (OS grid reference) · View on Apple Maps
WFD catchment
Scrase Bridge Stream at Haywards Heath (GB107041012680)
2024 spills / hours
86 / 980
Long-term average
34.0 spills a year (monitored since 2019)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
Env Act (SODRP) improvement ongoing
Volume & pollution
Estimate from 430 hours spilling →
Scrase Stream 50 430 down 42% 100%
Oxted WwTW
Storm tank at sewage works
Sewage works
Oxted
Company site name
OXTED SSO - 115423
EA ID / permit
SWS00637 · A00193
Outlet location
TQ3978050040 (OS grid reference) · View on Apple Maps
WFD catchment
Upper Eden (GB106040018630)
2024 spills / hours
71 / 955
Long-term average
80.0 spills a year (monitored since 2016)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 427 hours spilling →
The River Eden 52 427 down 27% 100%
Billingshurst WwTW
Storm tank at sewage works
Sewage works
Billingshurst
Company site name
BILLINGSHURST SSO - 115764
EA ID / permit
SWS00065 · A00526
Outlet location
TQ0779024720 (OS grid reference) · View on Apple Maps
WFD catchment
R. Arun (U/S Pallingham) (GB107041017950)
2024 spills / hours
61 / 664
Long-term average
53.3 spills a year (monitored since 2016)
High-spill reason (company)
Performance - GW inundation
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 421 hours spilling →
Par Brook 44 421 down 28% 100%
Barns Green WwTW
Inlet overflow at sewage works
Sewage works
Barns Green
Company site name
BARNS GREEN SSO - 115748
EA ID / permit
SWS00043 · W00385
Outlet location
TQ1258026250 (OS grid reference) · View on Apple Maps
WFD catchment
R. Adur West (GB107041012290)
2024 spills / hours
60 / 503
Long-term average
44.4 spills a year (monitored since 2016)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 417 hours spilling →
Parsons Brook 47 417 down 22% 100%
Felbridge WwTW
Inlet overflow at sewage works
Sewage works
Felbridge
Company site name
FELBRIDGE CSO - 116038
EA ID / permit
SWS00304 · W00564
Outlet location
TQ3643040930 (OS grid reference) · View on Apple Maps
WFD catchment
Eden Brook (GB106040018660)
2024 spills / hours
108 / 913
Long-term average
60.0 spills a year (monitored since 2016)
High-spill reason (company)
Performance - GW inundation
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 416 hours spilling →
Felbridge Water (Eden Brook) 55 416 down 49% 100%
Balcombe Wastewater Treatment Works
Storm tank at sewage works
Sewage works
Balcombe
Company site name
BALCOMBE SSO - 115796
EA ID / permit
SWS00035 · A01510
Outlet location
TQ3136028530 (OS grid reference) · View on Apple Maps
WFD catchment
Ouse from Slaugham to Ardingly Resevoir (GB107041012730)
2024 spills / hours
59 / 474
Long-term average
43.7 spills a year (monitored since 2016)
High-spill reason (company)
Performance - GW inundation
Investigation
UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 416 hours spilling →
Unnamed Trib of River Ouse 33 416 down 44% 100%
Edenbridge WwTW
Storm tank at sewage works
Sewage works
Edenbridge
Company site name
EDENBRIDGE SSO - 115738
EA ID / permit
SWS00281 · A00528
Outlet location
TQ4542046470 (OS grid reference) · View on Apple Maps
WFD catchment
Eden at Bough Beech (GB106040018160)
2024 spills / hours
67 / 783
Long-term average
53.7 spills a year (monitored since 2016)
High-spill reason (company)
Performance - GW inundation
Investigation
UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 416 hours spilling →
River Eden 48 416 down 28% 98%
Blackboys WwTW
Storm tank at sewage works
Sewage works
Blackboys
Company site name
BLACKBOYS SSO - 115873
EA ID / permit
SWS00069 · W00361
Outlet location
TQ5195021200 (OS grid reference) · View on Apple Maps
WFD catchment
Tickerage Stream (GB107041012970)
2024 spills / hours
103 / 867
Long-term average
49.8 spills a year (monitored since 2016)
High-spill reason (company)
Performance - GW inundation
Investigation
UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 397 hours spilling →
Tickerage Stream 48 397 down 53% 99%
Fareham Road Wickham Ceo
Storm discharge at pumping station
Company site name
FAREHAM ROAD WICKHAM CEO - 108501
EA ID / permit
SWS00301 · A01309
Outlet location
SU5714011220 (OS grid reference) · View on Apple Maps
WFD catchment
R. Meon (GB107042016640)
2024 spills / hours
70 / 878
Long-term average
34.8 spills a year (monitored since 2016)
High-spill reason (company)
Performance - GW inundation
Investigation
UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 395 hours spilling →
River Meon 35 395 down 50% 95%
Slinfold WwTW
Storm tank at sewage works
Sewage works
Slinfold
Company site name
SLINFOLD SSO - 116044
EA ID / permit
SWS00781 · A01205
Outlet location
TQ1132032090 (OS grid reference) · View on Apple Maps
WFD catchment
R. Arun (U/S Pallingham) (GB107041017950)
2024 spills / hours
104 / 1,189
Long-term average
58.2 spills a year (monitored since 2016)
High-spill reason (company)
Performance - GW inundation
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 392 hours spilling →
Unnamed Trib of River Arun 40 392 down 62% 100%
Battle WwTW
Storm tank at sewage works
Sewage works
Battle
Company site name
BATTLE SSO - 115853
EA ID / permit
SWS00046 · W00538
Outlet location
TQ7577016220 (OS grid reference) · View on Apple Maps
WFD catchment
Brede between Battle and Winchelsea (GB107040013550)
2024 spills / hours
101 / 940
Long-term average
82.2 spills a year (monitored since 2019)
High-spill reason (company)
Performance - GW inundation
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 388 hours spilling →
Trib of the River Brede 49 388 down 51% 100%
Portswood WwTW
Storm tank at sewage works
Sewage works
Portswood
Company site name
PORTSWOOD SSO - 115428
EA ID / permit
SWS00674 · W00314
Outlet location
SU4356014600 (OS grid reference) · View on Apple Maps
WFD catchment
SOUTHAMPTON WATER (GB520704202800)
Shellfish water
Southampton Water
2024 spills / hours
91 / 994
Long-term average
56.3 spills a year (monitored since 2016)
High-spill reason (company)
Performance - GW inundation
Investigation
UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 380 hours spilling →
River Itchen Estuary 36 380 down 60% 100%
Horsebridge Pumping Station
Storm discharge at pumping station
Company site name
HELLINGLY CSO - 108247
EA ID / permit
SWS00447 · S01450
Outlet location
TQ5827012500 (OS grid reference) · View on Apple Maps
WFD catchment
Cuckmere from Warbleton to Lower Horsebridge (GB107041012390)
2024 spills / hours
72 / 1,021
Long-term average
20.9 spills a year (monitored since 2016)
High-spill reason (company)
Performance - GW inundation
Investigation
UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 376 hours spilling →
River Cuckmere 32 376 down 56% 100%
Hamble Lane Bursledon Wastewater PS
Storm discharge at pumping station
Company site name
HAMBLE LANE BURSLEDON CEO - 113675
EA ID / permit
SWS00391 · EPR/GB3099NQ
Outlet location
SU4815008730 (OS grid reference) · View on Apple Maps
WFD catchment
SOUTHAMPTON WATER (GB520704202800)
Shellfish water
Southampton Water; Approaches to Southampton Water
2024 spills / hours
63 / 950
Long-term average
40.1 spills a year (monitored since 2016)
Investigation
UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 369 hours spilling →
River Hamble Estuary 29 369 down 54% 100%
Small Dole WwTW
Storm tank at sewage works
Sewage works
Small Dole
Company site name
SMALL DOLE SSO - 115768
EA ID / permit
SWS00783 · A01483
Outlet location
TQ2156013710 (OS grid reference) · View on Apple Maps
WFD catchment
Woodsmill Stream (GB107041012060)
2024 spills / hours
75 / 1,031
Long-term average
53.0 spills a year (monitored since 2016)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 368 hours spilling →
Unnamed Trib Tidal River Adur 37 368 down 51% 100%
Partridge Green S.T.W.
Storm tank at sewage works
Sewage works
Partridge Green S T W
Company site name
PARTRIDGE GREEN SSO - 115766
EA ID / permit
SWS00644 · W00470
Outlet location
TQ1943018660 (OS grid reference) · View on Apple Maps
WFD catchment
Adur East (Sakeham) (GB107041012900)
2024 spills / hours
100 / 1,327
Long-term average
73.0 spills a year (monitored since 2019)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 362 hours spilling →
Unnamed Trib of River Adur 43 362 down 57% 99%
Swalecliffe WwTW
Inlet overflow at sewage works
Sewage works
Swalecliffe
Company site name
SWALECLIFFE CSO - 115444
EA ID / permit
SWS00844 · A01102
Outlet location
TR1415069530 (OS grid reference) · View on Apple Maps
WFD catchment
Thames Coastal South (GB640604640000)
Bathing water
Herne Bay Central; Tankerton
Shellfish water
Swale East; Swalecliffe
2024 spills / hours
73 / 685
Long-term average
88.4 spills a year (monitored since 2016)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Monitor below 90%
Sensor failure / issue · Resolved - May
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
Env Act (SODRP) improvement ongoing, Bathing Water and/or Shellfish Water improvement ongoing
Volume & pollution
Estimate from 361 hours spilling →
The North Sea 49 361 down 33% 73%
Prior Crescent CSO
Storm discharge at pumping station
Company site name
PRIOR CRESCENT NEWPORT CSO - 102414
EA ID / permit
SWS00677 · A01226
Outlet location
SZ4942091010 (OS grid reference) · View on Apple Maps
WFD catchment
Lukely Brook (GB107101006250)
Shellfish water
Cowes and Medina
2024 spills / hours
76 / 506
Long-term average
55.1 spills a year (monitored since 2016)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 361 hours spilling →
River Medina 56 361 down 26% 100%
Ryde (Appley Park) Headworks Wps
Storm discharge at pumping station
Company site name
APPLEY PARK RYDE TRANSFER CEO - 108941
EA ID / permit
SWS00727 · A00849
Outlet location
SZ5973095430 (OS grid reference) · View on Apple Maps
WFD catchment
Solent (GB650705150000)
Bathing water
Cowes; Ryde; Seagrove
Shellfish water
Cowes and Medina; Ryde; Spithead and Stokes Bay
2024 spills / hours
57 / 619
Long-term average
79.9 spills a year (monitored since 2016)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 361 hours spilling →
The Solent 43 361 down 25% 100%
East Hoathly S.T.W.
Storm tank at sewage works
Sewage works
East Hoathly S T W
Company site name
EAST HOATHLY SSO - 115741
EA ID / permit
SWS00270 · A01484
Outlet location
TQ5210015400 (OS grid reference) · View on Apple Maps
WFD catchment
Bull River from Foxhunt Green to Lower Horsebridge (GB107041012380)
2024 spills / hours
67 / 750
Long-term average
43.3 spills a year (monitored since 2016)
High-spill reason (company)
Performance - GW inundation
Investigation
UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 360 hours spilling →
Trib of Glynde Reach 48 360 down 28% 100%
Upper Dicker Sewage P.S.
Storm discharge at pumping station
Company site name
UPPER DICKER CEO - 108776
EA ID / permit
SWS00895 · W00469
Outlet location
TQ5558009900 (OS grid reference) · View on Apple Maps
WFD catchment
Cuckmere between Arlington and Lower Horsebridge (GB107041012930)
2024 spills / hours
76 / 740
Long-term average
54.6 spills a year (monitored since 2018)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 360 hours spilling →
Freshwater River 47 360 down 38% 99%
Barge Lane Wootton Bridge 5 CSO
Overflow on sewer network
Company site name
BARGE LANE WOOTTON BRIDGE OUTSIDE 5 CSO - 108506
EA ID / permit
SWS00040 · A01088
Outlet location
SZ5483092040 (OS grid reference) · View on Apple Maps
WFD catchment
WOOTTON CREEK (GB520710101900)
Shellfish water
Cowes and Medina; Ryde
2024 spills / hours
66 / 523
Long-term average
42.9 spills a year (monitored since 2016)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Monitor below 90%
Sensor failure / issue · Resolved - Sep
Investigation
UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 358 hours spilling →
The Solent 46 358 down 30% 46%
Summer Lane Pagham WwTW
Storm tank at sewage works
Sewage works
Summer Lane Pagham
Company site name
SUMMER LANE PAGHAM SSO - 115443
EA ID / permit
SWS00640 · A01192
Outlet location
SZ8827098950 (OS grid reference) · View on Apple Maps
WFD catchment
Pagham Harbour (GB107041012880)
Bathing water
Pagham
2024 spills / hours
72 / 1,195
Long-term average
50.4 spills a year (monitored since 2016)
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 358 hours spilling →
Pagham Rife 22 358 down 69% 99%
Penshurst WwTW
Inlet overflow at sewage works
Sewage works
Penshurst
Company site name
PENSHURST CSO - 115997
EA ID / permit
SWS00657 · W00026
Outlet location
TQ5316043850 (OS grid reference) · View on Apple Maps
WFD catchment
Mid Medway from Eden Confluence to Yalding (GB106040018182)
2024 spills / hours
100 / 793
Long-term average
66.6 spills a year (monitored since 2016)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 350 hours spilling →
River Medway 61 350 down 39% 100%
Lingfield WwTW
Storm tank at sewage works
Sewage works
Lingfield
Company site name
LINGFIELD SSO - 115415
EA ID / permit
SWS00505 · A00194
Outlet location
TQ3880045040 (OS grid reference) · View on Apple Maps
WFD catchment
Tributary of Eden Brook (GB106040018340)
2024 spills / hours
124 / 2,110
Long-term average
79.7 spills a year (monitored since 2016)
High-spill reason (company)
Performance - GW inundation
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 350 hours spilling →
Ray Brook 38 350 down 69% 98%
Cranbrook WwTW
Storm tank at sewage works
Sewage works
Cranbrook
Company site name
CRANBROOK SSO - 115403
EA ID / permit
SWS00222 · W00497
Outlet location
TQ7824036200 (OS grid reference) · View on Apple Maps
WFD catchment
Hammer Stream (GB106040018290)
2024 spills / hours
93 / 1,117
Long-term average
62.1 spills a year (monitored since 2016)
High-spill reason (company)
Performance - GW inundation
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 347 hours spilling →
The Crane Brook 43 347 down 54% 100%

Sewage treatment works

Storm tanks and inlet overflows at each Southern Water sewage works. The figures are 2025 spills.

← All water companies · Contains Environment Agency data licensed under the Open Government Licence v3.0. How to read the data.