Storm overflow register · 2025 annual return

South West Water storm overflows, 2025

South West Water reported 1,365 storm overflows in England for 2025. Together they recorded 46,164 spills over 407,006 hours, an average of 33.8 spills per overflow against 20.4 across England. That ranks 10 of 10 companies, where 1 is the fewest spills per overflow. Counting the same overflows in both years, spills were down 18% on 2024.

178 overflows did not spill · 275 spilled more than 60 times · 1,313 had monitors working for 90% of the year or more · 334 sewage treatment works with overflows

Hours spilling by month, 2025

050k100k150k200kJan 2025: 84,216 hours spillingJanFeb 2025: 45,207 hours spillingFebMar 2025: 9,740 hours spillingMarApr 2025: 21,006 hours spillingAprMay 2025: 2,363 hours spillingMayJun 2025: 8,257 hours spillingJunJul 2025: 1,289 hours spillingJulAug 2025: 2,570 hours spillingAugSep 2025: 11,756 hours spillingSepOct 2025: 9,772 hours spillingOctNov 2025: 60,065 hours spillingNovDec 2025: 150,480 hours spillingDec
Hours spilling, all South West Water overflows, from the start/stop records. Spills running across a month end are split between the months.

All South West Water storm overflows

Sorted by hours spilling. Open an overflow for its permit, location, reasons for high spills and improvement status.

OverflowDischarges toSpills 2025Hours 2025Spills vs 2024Monitor uptime
Swanvale Pumping Station
Storm discharge at pumping station
Company site name
SWANVALE SPS_PSCSOEO_FALMOUTH
EA ID / permit
SBB01198 · 301669
Outlet location
SW80483056 (OS grid reference) · View on Apple Maps
WFD catchment
Not part of a WFD catchment
Bathing water
Swanpool
2024 spills / hours
77 / 1,244
Long-term average
24.1 spills a year (monitored since 2010)
High-spill reason (company)
Not asset maintenance - hydraulic capacity
Investigation
Operational investigation completed
Improvement
Env Act (SODRP) improvement ongoing
Volume & pollution
Estimate from 690 hours spilling →
Falmouth Bay/Trib Bickland Wat 42 690 down 45% 100%
Newham Wastewater Treatment Works
Storm tank at sewage works
Sewage works
Newham
Company site name
NEWHAM STW_SSO_TRURO
EA ID / permit
SBB01287 · 302707
Outlet location
SW83414329 (OS grid reference) · View on Apple Maps
WFD catchment
Not part of a WFD catchment
Shellfish water
Fal Estuary
2024 spills / hours
57 / 706
Long-term average
34.6 spills a year (monitored since 2012)
High-spill reason (company)
Performance - SW Infiltration
Investigation
Operational investigation completed
Improvement
Env Act (SODRP) improvement ongoing
Volume & pollution
Estimate from 669 hours spilling →
Truro River 51 669 down 11% 100%
Praze Tank CSO
Overflow on sewer network
Company site name
PRAZE TANK_CSO_PENRYN
EA ID / permit
SBB00981 · 302302
Outlet location
SW78103481 (OS grid reference) · View on Apple Maps
WFD catchment
Not part of a WFD catchment
Shellfish water
Fal Estuary
2024 spills / hours
61 / 577
Long-term average
49.4 spills a year (monitored since 2017)
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
No investigation activity in reporting period
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 663 hours spilling →
Praze Stream 49 663 down 20% 94%
Playing Fields Pumping Station
Storm discharge at pumping station
Company site name
PLAYING FIELDS_PSCSOEO_CALSTOCK
EA ID / permit
SBB00944 · 301614
Outlet location
SX43636845 (OS grid reference) · View on Apple Maps
WFD catchment
Not part of a WFD catchment
2024 spills / hours
114 / 667
Long-term average
101.0 spills a year (monitored since 2017)
High-spill reason (company)
Not asset maintenance - hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 661 hours spilling →
River Tamar (Estuarine) 73 661 down 36% 100%
Compton Castle CSO
Overflow on sewer network
Company site name
COMPTON CASTLE_CSO_COMPTON
EA ID / permit
SBB00301 · 201791
Outlet location
SX86496533 (OS grid reference) · View on Apple Maps
WFD catchment
Aller Brook (GB108046005340)
Shellfish water
Teign Estuary
2024 spills / hours
144 / 2,069
Long-term average
119.6 spills a year (monitored since 2017)
High-spill reason (company)
Not asset maintenance - hydraulic capacity
Monitor below 90%
Sensor failure / issue · Resolved - Mar
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation ongoing
Improvement
Env Act (SODRP) improvement ongoing, UWWTR improvement ongoing
Volume & pollution
Estimate from 659 hours spilling →
Trib of Aller Brook 69 659 down 52% 79%
Modbury Wastewater Treatment Works
Storm tank at sewage works
Sewage works
Modbury
Company site name
MODBURY STW_SSO_MODBURY
EA ID / permit
SBB00793 · SWWA 2259
Outlet location
SX65375136 (OS grid reference) · View on Apple Maps
WFD catchment
Ayleston Brook (GB108046005020)
Bathing water
Mothecombe; Coastguards Beach, Erme Estuary
2024 spills / hours
86 / 702
Long-term average
57.4 spills a year (monitored since 2015)
High-spill reason (company)
Performance - SW Infiltration
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed
Improvement
Env Act (SODRP) improvement ongoing, Operational improvement ongoing
Volume & pollution
Estimate from 657 hours spilling →
Ayleston Brook (S) 54 657 down 37% 100%
Ugborough STW
Storm tank at sewage works
Sewage works
Ugborough
Company site name
UGBOROUGH STW_SSO_UGBOROUGH
EA ID / permit
SBB01295 · NRA-SW-6965
Outlet location
SX67535540 (OS grid reference) · View on Apple Maps
WFD catchment
Lud Brook (GB108046005110)
2024 spills / hours
17 / 188
Long-term average
17.2 spills a year (monitored since 2021)
High-spill reason (company)
Performance - SW Infiltration
Investigation
No investigation activity in reporting period
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 654 hours spilling →
(S) Trib of Lud Brook 38 654 up 124% 100%
Torcross Pumping Station
Storm discharge at pumping station
Company site name
TORCROSS SPST_PSCSOEO_TORCROSS
EA ID / permit
SBB01256 · 203035
Outlet location
SX82414170 (OS grid reference) · View on Apple Maps
WFD catchment
Not part of a WFD catchment
Bathing water
Slapton Sands Torcross
Shellfish water
Start Bay
2024 spills / hours
68 / 1,249
Long-term average
51.1 spills a year (monitored since 2010)
High-spill reason (company)
Not asset maintenance - hydraulic capacity
Investigation
No investigation activity in reporting period
Improvement
Env Act (SODRP) improvement ongoing
Volume & pollution
Estimate from 654 hours spilling →
Start Bay (C) 40 654 down 41% 100%
Black Torrington WwTW
Inlet overflow at sewage works
Sewage works
Black Torrington
Company site name
BLACK TORRINGTON STW_SO_BLACK TORRINGTON
EA ID / permit
SBB00117 · 200364
Outlet location
SS46940598 (OS grid reference) · View on Apple Maps
WFD catchment
Torridge (Combe Lake to Lew) (GB108050013930)
2024 spills / hours
116 / 806
Long-term average
129.8 spills a year (monitored since 2019)
High-spill reason (company)
Not asset maintenance - hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 636 hours spilling →
River Torridge (and Trib of) 102 636 down 12% 97%
Town Quay Pumping Station
Storm discharge at pumping station
Company site name
TOWN QUAY SPST_PSCSOEO_FOWEY
EA ID / permit
SBB01268 · 302775
Outlet location
SX12665166 (OS grid reference) · View on Apple Maps
WFD catchment
Not part of a WFD catchment
Bathing water
Readymoney Cove
Shellfish water
Fowey
2024 spills / hours
264 / 711
Long-term average
170.6 spills a year (monitored since 2010)
High-spill reason (company)
Not asset maintenance - hydraulic capacity
Investigation
Operational investigation completed
Improvement
Env Act (SODRP) improvement ongoing, Operational improvement completed
Volume & pollution
Estimate from 635 hours spilling →
River Fowey Estuary (E) 198 635 down 25% 100%
Helebridge WwTW
Storm tank at sewage works
Sewage works
Helebridge
Company site name
HELEBRIDGE STW_SSO_BUDE
EA ID / permit
SBB00560 · 301299
Outlet location
SS18910639 (OS grid reference) · View on Apple Maps
WFD catchment
Not part of a WFD catchment
2024 spills / hours
59 / 961
Long-term average
27.3 spills a year (monitored since 2019)
High-spill reason (company)
Performance - SW Infiltration
Monitor below 90%
Telemetry or data archiving failure / issue · Resolved - Sep
Investigation
No investigation activity in reporting period
Improvement
Env Act (SODRP) improvement ongoing
Volume & pollution
Estimate from 633 hours spilling →
Bude Bay (Atlantic Ocean) 39 633 down 34% 52%
Meeth STW
Inlet overflow at sewage works
Sewage works
Meeth
Company site name
MEETH STW_SSO_MEETH
EA ID / permit
SBB00758 · NRA-SW-0003
Outlet location
SS54580795 (OS grid reference) · View on Apple Maps
WFD catchment
Little Mere River (GB108050014190)
2024 spills / hours
103 / 1,104
Long-term average
43.8 spills a year (monitored since 2022)
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Operational investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 629 hours spilling →
Unnamed Watercourse 70 629 down 32% 100%
Harrowbarrow WwTW
Inlet overflow at sewage works
Sewage works
Harrowbarrow
Company site name
HARROW BARROW STW_SO_CALLINGTON
EA ID / permit
SBB01381 · NRA-SW-0227
Outlet location
SX40296973 (OS grid reference) · View on Apple Maps
WFD catchment
Cotehele Stream (GB108047004070)
2024 spills / hours
79 / 356
Long-term average
60.3 spills a year (monitored since 2019)
High-spill reason (company)
Not asset maintenance - hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement ongoing
Volume & pollution
Estimate from 628 hours spilling →
(S)Unnamed Trib River Tamar 68 628 down 14% 99%
Little Silver Pumping Station
Storm discharge at pumping station
Company site name
LITTLE SILVER SPST_PSCSOEO_TIVERTON
EA ID / permit
SBB00697 · 203078
Outlet location
SS95441208 (OS grid reference) · View on Apple Maps
WFD catchment
Lowman (GB108045015030)
2024 spills / hours
113 / 972
Long-term average
89.5 spills a year (monitored since 2010)
High-spill reason (company)
Not asset maintenance - hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed
Improvement
Env Act (SODRP) improvement ongoing, UWWTR improvement ongoing
Volume & pollution
Estimate from 622 hours spilling →
River Lowman 74 622 down 35% 100%
Gittisham Pumping Station
Storm discharge at pumping station
Company site name
GITTISHAM SPST_PSCSOEO_GITTISHAM
EA ID / permit
SBB00490 · 201142
Outlet location
SY13429887 (OS grid reference) · View on Apple Maps
WFD catchment
Lower River Otter (GB108045009170)
2024 spills / hours
82 / 930
Long-term average
68.3 spills a year (monitored since 2019)
High-spill reason (company)
Performance - SW Infiltration
Investigation
Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 622 hours spilling →
Tributary of River Otter 67 622 down 18% 100%
Lewdown Wastewater Treatment Works
Inlet overflow at sewage works
Sewage works
Lewdown
Company site name
LEWDOWN STW_SO_LEWDOWN
EA ID / permit
SBB00686 · NRA-SW-6982
Outlet location
SX44788747 (OS grid reference) · View on Apple Maps
WFD catchment
Thrushel (GB108047008010)
2024 spills / hours
48 / 411
Long-term average
67.7 spills a year (monitored since 2018)
High-spill reason (company)
Not asset maintenance - hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 621 hours spilling →
Tributary of River Thrushel 70 621 up 46% 100%
St Dennis Wastewater Treatment Work
Inlet overflow at sewage works
Sewage works
St Dennis Wastewater Treatment Work
Company site name
ST DENNIS STW_SO_ST DENNIS
EA ID / permit
SBB01128 · NRA-SW-3885
Outlet location
SW94115764 (OS grid reference) · View on Apple Maps
WFD catchment
Upper River Fal (GB108048001390)
2024 spills / hours
129 / 1,253
Long-term average
92.5 spills a year (monitored since 2019)
High-spill reason (company)
Performance - SW Infiltration
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 617 hours spilling →
River Fal 97 617 down 25% 100%
Maer Pumping Station & Tank CSO
Storm discharge at pumping station
Company site name
MAER ROAD SPST_PSCSOEO_EXMOUTH
EA ID / permit
SBB00736 · 200126/PC/01
Outlet location
SY01117968 (OS grid reference) · View on Apple Maps
WFD catchment
Not part of a WFD catchment
Bathing water
Exmouth
Shellfish water
Exe Estuary
2024 spills / hours
76 / 871
Long-term average
52.1 spills a year (monitored since 2010)
High-spill reason (company)
Not asset maintenance - hydraulic capacity
Investigation
Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 612 hours spilling →
English Channel 51 612 down 33% 100%
Latchley STW
Inlet overflow at sewage works
Sewage works
Latchley
Company site name
LATCHLEY STW_SO_GUNNISLAKE
EA ID / permit
SBB00673 · 302129
Outlet location
SX40837397 (OS grid reference) · View on Apple Maps
WFD catchment
Lower River Tamar (GB108047007860)
2024 spills / hours
119 / 1,654
Long-term average
90.8 spills a year (monitored since 2021)
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
No investigation activity in reporting period
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 604 hours spilling →
River Tamar (S) 42 604 down 65% 99%
Chittlehampton WwTW
Storm tank at sewage works
Sewage works
Chittlehampton
Company site name
CHITTLEHAMPTON STW_SSO_CHITTLEHAMPTON
EA ID / permit
SBB00250 · NRA-SW-7809
Outlet location
SS63502521 (OS grid reference) · View on Apple Maps
WFD catchment
Hawkridge Brook (GB108050014520)
2024 spills / hours
80 / 724
Long-term average
110.1 spills a year (monitored since 2017)
High-spill reason (company)
Not asset maintenance - hydraulic capacity
Investigation
Operational investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 599 hours spilling →
Trib of Hawkbridge Brook 60 599 down 25% 100%
Winsford Pscso/EO
Storm discharge at pumping station
Company site name
WINSFORD SPST_PSCSOEO_WINSFORD
EA ID / permit
SBB01369 · 203228
Outlet location
SS90723483 (OS grid reference) · View on Apple Maps
WFD catchment
Exe (Source to Quarme) (GB108045020930)
2024 spills / hours
66 / 892
Long-term average
51.4 spills a year (monitored since 2021)
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
No investigation activity in reporting period
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 597 hours spilling →
River Exe(S) 45 597 down 32% 95%
WwTW at Morchard Bishop
Inlet overflow at sewage works
Sewage works
At Morchard Bishop
Company site name
MORCHARD BISHOP STW_SO_MORCHARD BISHOP
EA ID / permit
SBB01380 · 003126/SF/01
Outlet location
SS76380765 (OS grid reference) · View on Apple Maps
WFD catchment
Knighty Brook (GB108050008290)
2024 spills / hours
152 / 777
Long-term average
126.0 spills a year (monitored since 2021)
High-spill reason (company)
Performance - SW Infiltration
Investigation
Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 593 hours spilling →
Tributary of the Pepper Lake 124 593 down 18% 98%
Glenholt Pumping Station
Overflow on sewer network
Company site name
GLENHOLT SPS_PSCSOEO_PLYMOUTH
EA ID / permit
SBB00493 · 301592
Outlet location
SX50886104 (OS grid reference) · View on Apple Maps
WFD catchment
Lower River Plym (GB108047004040)
Bathing water
Plymouth Hoe East
2024 spills / hours
70 / 571
Long-term average
83.3 spills a year (monitored since 2016)
High-spill reason (company)
Not asset maintenance - hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed
Improvement
Env Act (SODRP) improvement ongoing, UWWTR improvement ongoing
Volume & pollution
Estimate from 593 hours spilling →
Trib of the River Plym 67 593 down 4% 100%
Burrington STW
Inlet overflow at sewage works
Sewage works
Burrington
Company site name
BURRINGTON STW_SO_BURRINGTON
EA ID / permit
SBB00194 · DRA 1437
Outlet location
SS63571679 (OS grid reference) · View on Apple Maps
WFD catchment
Mully Brook (GB108050014310)
2024 spills / hours
144 / 884
Long-term average
117.0 spills a year (monitored since 2022)
High-spill reason (company)
Performance - SW Infiltration
Investigation
Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 588 hours spilling →
Trib of Mully Brook 127 588 down 12% 100%
Railway Station Combined Sewer of
Overflow on sewer network
Company site name
RAILWAY STATION_CSO_AXMINSTER
EA ID / permit
SBB01014 · DRA 1563
Outlet location
SY29279834 (OS grid reference) · View on Apple Maps
WFD catchment
Lower Axe (GB108045008870)
2024 spills / hours
74 / 660
Long-term average
62.8 spills a year (monitored since 2021)
High-spill reason (company)
Performance - SW Infiltration
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation ongoing
Improvement
Env Act (SODRP) improvement ongoing
Volume & pollution
Estimate from 587 hours spilling →
River Axe 68 587 down 8% 100%
Falmouth STW Inlet & Storm PS
Inlet overflow at sewage works
Sewage works
Falmouth And Ps
Company site name
FALMOUTH STW_SSO_FALMOUTH
EA ID / permit
SBB00440 · 302999
Outlet location
SW82643206 (OS grid reference) · View on Apple Maps
WFD catchment
Not part of a WFD catchment
Shellfish water
Fal Estuary
2024 spills / hours
31 / 418
Long-term average
29.9 spills a year (monitored since 2010)
High-spill reason (company)
Performance - SW Infiltration
Investigation
No investigation activity in reporting period
Improvement
Env Act (SODRP) improvement ongoing
Volume & pollution
Estimate from 582 hours spilling →
Penryn River(E) 38 582 up 23% 100%
Culmstock Sewage Treatment Works
Inlet overflow at sewage works
Sewage works
Culmstock
Company site name
CULMSTOCK STW_SO_CULMSTOCK
EA ID / permit
SBB00342 · NRA-SW-3571
Outlet location
ST09921368 (OS grid reference) · View on Apple Maps
WFD catchment
Middle Culm (GB108045014980)
2024 spills / hours
50 / 324
Long-term average
60.4 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - hydraulic capacity
Investigation
Operational investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 581 hours spilling →
River Culm 68 581 up 36% 100%
Bradworthy WwTW SSO
Storm tank at sewage works
Sewage works
Bradworthy
Company site name
BRADWORTHY STW_SSO_BRADWORTHY
EA ID / permit
SBB00143 · NRA-SW-1058
Outlet location
SS32991354 (OS grid reference) · View on Apple Maps
WFD catchment
Waldon (GB108050014270)
2024 spills / hours
143 / 739
Long-term average
143.4 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - hydraulic capacity
Monitor below 90%
Comms failure / issue · Resolved - Jun
Investigation
UWWTR investigation ongoing, Operational investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 579 hours spilling →
Trib of River Torridge 109 579 down 24% 87%
Mitchell Pumping Station
Storm discharge at pumping station
Company site name
MITCHELL SPST_PSCSOEO_TRURO
EA ID / permit
SBB00792 · 302286
Outlet location
SW85675486 (OS grid reference) · View on Apple Maps
WFD catchment
Benny Stream (GB108049000210)
2024 spills / hours
69 / 811
Long-term average
48.5 spills a year (monitored since 2022)
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
No investigation activity in reporting period
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 578 hours spilling →
Benny Stream(S) 48 578 down 30% 99%
Horslears Pumping Station
Storm discharge at pumping station
Company site name
HORSLEARS SPST_PSCSOEO_AXMINSTER
EA ID / permit
SBB00599 · 203701
Outlet location
SY28819773 (OS grid reference) · View on Apple Maps
WFD catchment
Lower Axe (GB108045008870)
2024 spills / hours
61 / 526
Long-term average
57.4 spills a year
High-spill reason (company)
Performance - SW Infiltration
Investigation
Operational investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 577 hours spilling →
River Axe(S) 64 577 up 5% 100%
Bratton Clovelly WwTW CSO
Inlet overflow at sewage works
Sewage works
Bratton Clovelly
Company site name
BRATTON CLOVELLY STW_SO_BRATTON CLOVELY
EA ID / permit
SBB00146 · NRA-SW-1061
Outlet location
SX46749172 (OS grid reference) · View on Apple Maps
WFD catchment
Thrushel (GB108047008010)
2024 spills / hours
115 / 639
Long-term average
110.8 spills a year (monitored since 2021)
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 574 hours spilling →
Trib of River Thrushel 104 574 down 10% 100%
Ludgvan School CSO
Overflow on sewer network
Company site name
LUDGVAN SCHOOL_CSO_CROWLAS
EA ID / permit
SBB00721 · 302301/CS/01
Outlet location
SW51313307 (OS grid reference) · View on Apple Maps
WFD catchment
Marazion River (GB108048002110)
2024 spills / hours
33 / 231
Long-term average
19.7 spills a year (monitored since 2018)
High-spill reason (company)
Not asset maintenance - hydraulic capacity
Investigation
No investigation activity in reporting period
Improvement
Env Act (SODRP) improvement ongoing, Bathing Water and/or Shellfish Water improvement ongoing
Volume & pollution
Estimate from 569 hours spilling →
Ludgvan Stream 47 569 up 42% 100%
Watergate Bay Pumping Station
Storm discharge at pumping station
Company site name
WATERGATE SPS_PSCSOEO_WATERGATE BAY
EA ID / permit
SBB01318 · 301320
Outlet location
SW84236493 (OS grid reference) · View on Apple Maps
WFD catchment
Not part of a WFD catchment
Bathing water
Watergate Bay
2024 spills / hours
32 / 443
Long-term average
20.5 spills a year (monitored since 2010)
Investigation
No investigation activity in reporting period
Improvement
Env Act (SODRP) improvement ongoing
Volume & pollution
Estimate from 567 hours spilling →
Stream/Atlantic Ocean (S) 27 567 down 16% 100%
Perranuthnoe Pumping Station
Storm discharge at pumping station
Company site name
PERRANUTHNOE SPS_PSCSOEO_MARAZION
EA ID / permit
SBB00929 · 300828
Outlet location
SW53522914 (OS grid reference) · View on Apple Maps
WFD catchment
Not part of a WFD catchment
Bathing water
Perranuthnoe
2024 spills / hours
73 / 860
Long-term average
60.9 spills a year (monitored since 2010)
High-spill reason (company)
Performance - SW Infiltration
Investigation
UWWTR investigation completed
Improvement
Env Act (SODRP) improvement ongoing
Volume & pollution
Estimate from 566 hours spilling →
(C) Mounts Bay 50 566 down 32% 100%
Colyford Pscso/EO
Storm discharge at pumping station
Company site name
COLYFORD SPST_PSCSOEO_COLYFORD
EA ID / permit
SBB00290 · 201643
Outlet location
SY25359266 (OS grid reference) · View on Apple Maps
WFD catchment
Umborne Brook (GB108045008880)
2024 spills / hours
69 / 593
Long-term average
43.5 spills a year (monitored since 2022)
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 557 hours spilling →
River Coly(S) 64 557 down 7% 100%
Fowey Wastewater Treatment Works
Storm tank at sewage works (with treatment)
Sewage works
Fowey
Company site name
FOWEY STW_SSO_FOWEY
EA ID / permit
SBB00475 · 302530
Outlet location
SX12765233 (OS grid reference) · View on Apple Maps
WFD catchment
Not part of a WFD catchment
Bathing water
Readymoney Cove
Shellfish water
Fowey
Treatment
UV (Ultraviolet)
2024 spills / hours
91 / 765
Long-term average
156.9 spills a year (monitored since 2010)
High-spill reason (company)
Performance - SW Infiltration
Investigation
Operational investigation completed
Improvement
Env Act (SODRP) improvement ongoing
Volume & pollution
Estimate from 557 hours spilling →
Fowey Estuary (E) 72 557 down 21% 100%
Exford STW
Inlet overflow at sewage works
Sewage works
Exford
Company site name
EXFORD STW_SO_EXFORD
EA ID / permit
SBB00432 · NRA-SW-3496
Outlet location
SS85673816 (OS grid reference) · View on Apple Maps
WFD catchment
Exe (Source to Quarme) (GB108045020930)
2024 spills / hours
43 / 302
Long-term average
34.6 spills a year (monitored since 2021)
High-spill reason (company)
Performance - SW Infiltration
Investigation
UWWTR investigation completed
Improvement
UWWTR improvement completed
Volume & pollution
Estimate from 552 hours spilling →
River Exe 39 552 down 9% 100%
Ipplepen Wastewater Treatment Works
Storm tank at sewage works
Sewage works
Ipplepen
Company site name
IPPLEPEN STW_SSO_IPPLEPEN
EA ID / permit
SBB00615 · 203406
Outlet location
SX82816676 (OS grid reference) · View on Apple Maps
WFD catchment
Am Brook (GB108046005210)
2024 spills / hours
66 / 822
Long-term average
48.7 spills a year (monitored since 2019)
High-spill reason (company)
Performance - SW Infiltration
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 550 hours spilling →
Halwell Stream 41 550 down 38% 95%
Ford & Fairy Cross STW
Storm tank at sewage works
Sewage works
Ford And Fairy Cross
Company site name
FORD AND FAIRY CROSS STW_SSO_FORD
EA ID / permit
SBB00466 · 203909
Outlet location
SS41082451 (OS grid reference) · View on Apple Maps
WFD catchment
Upper River Yeo (Bideford) (GB108050014470)
2024 spills / hours
112 / 810
Long-term average
72.3 spills a year (monitored since 2022)
High-spill reason (company)
Performance - SW Infiltration
Investigation
Operational investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 549 hours spilling →
Trib of River Yeo(S) 81 549 down 28% 100%
Torpoint Wastewater Treatment Works
Inlet overflow at sewage works
Sewage works
Torpoint
Company site name
TORPOINT STW_SO_TORPOINT
EA ID / permit
SBB01257 · NRA-SW-6990
Outlet location
SX41475405 (OS grid reference) · View on Apple Maps
WFD catchment
Not part of a WFD catchment
2024 spills / hours
55 / 517
Long-term average
42.4 spills a year (monitored since 2017)
High-spill reason (company)
Not asset maintenance - hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
UWWTR improvement completed, Operational improvement ongoing
Volume & pollution
Estimate from 548 hours spilling →
St John'S Lake (Estuarine) 57 548 up 4% 100%
Sampford Peverell WwTW
Storm tank at sewage works
Sewage works
Sampford Peverell
Company site name
SAMPFORD PEVERELL STW_SSO_SAMPFORD P
EA ID / permit
SBB01048 · DRA 20
Outlet location
ST03871336 (OS grid reference) · View on Apple Maps
WFD catchment
Spratford Stream (GB108045015020)
2024 spills / hours
94 / 1,550
Long-term average
97.6 spills a year (monitored since 2018)
High-spill reason (company)
Performance - SW Infiltration
Investigation
UWWTR investigation ongoing, Operational investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 546 hours spilling →
Spratford Stream 45 546 down 52% 100%
South Molton WwTW
Inlet overflow at sewage works
Sewage works
South Molton
Company site name
SOUTH MOLTON STW_SO_SOUTH MOLTON
EA ID / permit
SBB01100 · NRA-SW-5654
Outlet location
SS72252572 (OS grid reference) · View on Apple Maps
WFD catchment
Mole (Yeo to Burcombe Stream) (GB108050014130)
2024 spills / hours
108 / 506
Long-term average
117.6 spills a year (monitored since 2017)
High-spill reason (company)
Not asset maintenance - hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed
Improvement
Env Act (SODRP) improvement ongoing
Volume & pollution
Estimate from 540 hours spilling →
River Mole 118 540 up 9% 98%
Honda Garage CSO
Overflow on sewer network
Company site name
OPP 447 WOLSELEY RD_CSO_PLYMOUTH
EA ID / permit
SBB00588 · 302610
Outlet location
SX45195748 (OS grid reference) · View on Apple Maps
WFD catchment
Not part of a WFD catchment
2024 spills / hours
74 / 884
Long-term average
37.5 spills a year
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 534 hours spilling →
Weston Mill Stream(E) 43 534 down 42% 100%
Atherington WwTW CSO
Inlet overflow at sewage works
Sewage works
Atherington
Company site name
ATHERINGTON STW_SO_ATHERINGTON
EA ID / permit
SBB00056 · NRA-SW-1008
Outlet location
SS59332312 (OS grid reference) · View on Apple Maps
WFD catchment
Taw (River Mole to Estuary) (GB108050014530)
2024 spills / hours
69 / 493
Long-term average
63.3 spills a year (monitored since 2022)
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Operational investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 530 hours spilling →
Trib of Chantry Stream 60 530 down 13% 99%
Cheriton Bishop STW
Storm tank at sewage works
Sewage works
Cheriton Bishop
Company site name
CHERITON BISHOP STW_SSO_CHERITON BISHOP
EA ID / permit
SBB00241 · NRA-SW-3560
Outlet location
SX77579355 (OS grid reference) · View on Apple Maps
WFD catchment
Ford Brook (EXE) (GB108045009230)
2024 spills / hours
94 / 1,834
Long-term average
72.6 spills a year (monitored since 2021)
High-spill reason (company)
Performance - SW Infiltration
Investigation
No investigation activity in reporting period
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 520 hours spilling →
Ford Brook(S) 40 520 down 57% 100%
Cross Street Pumping Station
Storm discharge at pumping station
Company site name
CROSS STREET SPS_PSCSOEO_COMBE MARTIN
EA ID / permit
SBB00294 · 2675
Outlet location
SS57754719 (OS grid reference) · View on Apple Maps
WFD catchment
Umber (GB108051020440)
Bathing water
Combe Martin
2024 spills / hours
72 / 955
Long-term average
48.4 spills a year (monitored since 2010)
High-spill reason (company)
Not asset maintenance - hydraulic capacity
Investigation
No investigation activity in reporting period
Improvement
Env Act (SODRP) improvement ongoing, Bathing Water and/or Shellfish Water improvement ongoing
Volume & pollution
Estimate from 518 hours spilling →
River Umber 35 518 down 51% 100%
Dartington B CSO
Overflow on sewer network
Company site name
DARTINGTON SCH TWO_CSO_DARTINGTON
EA ID / permit
SBB00349 · 202963
Outlet location
SX78706219 (OS grid reference) · View on Apple Maps
WFD catchment
Bidwell Brook (GB108046005160)
Bathing water
Steamer Quay, Dart Estuary
Shellfish water
Dart
2024 spills / hours
84 / 1,203
Long-term average
62.0 spills a year (monitored since 2017)
High-spill reason (company)
Performance - SW Infiltration
Investigation
Operational investigation ongoing
Improvement
Env Act (SODRP) improvement ongoing, Bathing Water and/or Shellfish Water improvement ongoing
Volume & pollution
Estimate from 508 hours spilling →
Bidwell Brook 45 508 down 46% 100%
Tolvaddon Downs CSO
Overflow on sewer network
Company site name
TOLVADDON TANK_CSO_REDRUTH
EA ID / permit
SBB01249 · 301807
Outlet location
SW65714169 (OS grid reference) · View on Apple Maps
WFD catchment
Red River (Upper) (GB108049000600)
Bathing water
Gwithian Towans; Godrevy Towans
2024 spills / hours
35 / 49
Long-term average
38.0 spills a year
High-spill reason (company)
Not asset maintenance - hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation completed, Operational investigation completed
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 505 hours spilling →
Tolvaddon Stream (S) 69 505 up 97% 100%
Tavistock College Playing Field
Overflow on sewer network
Company site name
PLAYING FIELD_CSO_TAVISTOCK
EA ID / permit
SBB01210 · 301678
Outlet location
SX47657343 (OS grid reference) · View on Apple Maps
WFD catchment
Lower River Tavy (GB108047007840)
2024 spills / hours
94 / 369
Long-term average
80.4 spills a year (monitored since 2017)
High-spill reason (company)
Not asset maintenance - hydraulic capacity
Investigation
Operational investigation completed
Improvement
Env Act (SODRP) improvement ongoing, UWWTR improvement ongoing
Volume & pollution
Estimate from 501 hours spilling →
River Tavy 80 501 down 15% 95%
Ashill STW_SSO_ASHILL
Inlet overflow at sewage works
Sewage works
Ashill Ashill
EA ID / permit
SBB01432 · Unpermitted
Outlet location
ST08621179 (OS grid reference) · View on Apple Maps
WFD catchment
Sheldon Stream (GB108045014940)
2024 spills / hours
78 / 1,160
Long-term average
37.3 spills a year (monitored since 2023)
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
No investigation activity in reporting period
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 499 hours spilling →
Sheldon Stream 34 499 down 56% 100%

Sewage treatment works

Storm tanks and inlet overflows at each South West Water sewage works. The figures are 2025 spills.

← All water companies · Contains Environment Agency data licensed under the Open Government Licence v3.0. How to read the data.