Woodlands Close CSO Overflow on sewer network
- Company site name
- WOODLANDS CLOSE/CSO
- EA ID / permit
- YWS01784 · WRA8456
- Outlet location
- SE2032838274 (OS grid reference) · View on Apple Maps
- WFD catchment
- Aire from Gill Beck (Baildon) to Wyke Beck (GB104027063035)
- 2024 spills / hours
- 17 / 53
- Long-term average
- 32.7 spills a year (monitored since 2023)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Monitor below 90%
- Sensor failure / issue · Resolved - Feb
- Investigation
- Env Act (SODRP) investigation completed, UWWTR investigation completed, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 680 hours spilling →
|
River Aire |
54 |
680 |
up 218% |
82% |
Renishaw STW Storm tank at sewage works
- Sewage works
- Renishaw
- Company site name
- RENISHAW/STW
- EA ID / permit
- YWS00140 · 2469
- Outlet location
- SK4483078200 (OS grid reference) · View on Apple Maps
- WFD catchment
- Rother, Doe Lea to Don (GB104027057772)
- 2024 spills / hours
- 124 / 1,667
- Long-term average
- 82.5 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- Env Act (SODRP) investigation completed, UWWTR investigation completed, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 679 hours spilling →
|
Smithy Brook |
60 |
679 |
down 52% |
100% |
Harrogate South STW Storm tank at sewage works
- Sewage works
- Harrogate South
- Company site name
- HARROGATE SOUTH/STW
- EA ID / permit
- YWS01041 · QR.27/21/0048
- Outlet location
- SE3787051620 (OS grid reference) · View on Apple Maps
- WFD catchment
- Crimple Beck from Park Beck to River Nidd (GB104027063742)
- 2024 spills / hours
- 72 / 834
- Long-term average
- 71.2 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- Env Act (SODRP) investigation completed, UWWTR investigation completed, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 662 hours spilling →
|
The Crimple Beck |
55 |
662 |
down 24% |
100% |
South Elmsall WwTW Storm tank at sewage works
- Sewage works
- South Elmsall
- Company site name
- SOUTH ELMSALL/STW/3XDWF OVERFLOW
- EA ID / permit
- YWS01417 · WRA7507
- Outlet location
- SE4830010650 (OS grid reference) · View on Apple Maps
- WFD catchment
- Ea Beck from Frickley Beck to the Skell (GB104027063200)
- 2024 spills / hours
- 45 / 302
- Long-term average
- 64.8 spills a year (monitored since 2020)
- High-spill reason (company)
- Performance - SW Infiltration
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 660 hours spilling →
|
Hemsworth Dyke |
88 |
660 |
up 96% |
100% |
Wombwell WwTW Storm tank at sewage works
- Sewage works
- Wombwell
- Company site name
- WOMBWELL/STW/3XDWF OVERFLOW
- EA ID / permit
- YWS01100 · WA 6273
- Outlet location
- SE4099303788 (OS grid reference) · View on Apple Maps
- WFD catchment
- Dove from Source to River Dearne (GB104027057510)
- 2024 spills / hours
- 73 / 692
- Long-term average
- 74.8 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- UWWTR investigation ongoing, Operational investigation ongoing
- Improvement
- Operational improvement ongoing
- Volume & pollution
- Estimate from 655 hours spilling →
|
River Dove and Bulling Dyke |
67 |
655 |
down 8% |
100% |
Skelton on Ure Wpc Works Inlet overflow at sewage works
- Sewage works
- Skelton On Ure Wpc Works
- Company site name
- SKELTON/STW/6XDWF OVERFLOW
- EA ID / permit
- YWS00285 · 27/22/0060
- Outlet location
- SE3550068600 (OS grid reference) · View on Apple Maps
- WFD catchment
- Ure from River Skell to River Tutt (GB104027064161)
- 2024 spills / hours
- 106 / 1,147
- Long-term average
- 77.2 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 639 hours spilling →
|
Scour Gutter |
70 |
639 |
down 34% |
100% |
Skipton Sewage Treatment Works Storm tank at sewage works
- Sewage works
- Skipton
- Company site name
- SKIPTON/STW/3XDWF OVERFLOW
- EA ID / permit
- YWS00636 · 2838
- Outlet location
- SD9859049710 (OS grid reference) · View on Apple Maps
- WFD catchment
- Aire (Eshton Beck to R Worth) (GB104027063033)
- 2024 spills / hours
- 86 / 892
- Long-term average
- 73.0 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 638 hours spilling →
|
River Aire |
62 |
638 |
down 28% |
100% |
Hillcrest Avenue Overflow on sewer network
- Company site name
- HILLCREST AV TANK/CSO
- EA ID / permit
- YWS00505 · 27/26/0016
- Outlet location
- TA0225090550 (OS grid reference) · View on Apple Maps
- WFD catchment
- Burniston Beck/Sea Cut/Scalby Beck Catch to N Sea (GB104027067980)
- Bathing water
- Scarborough North Bay
- 2024 spills / hours
- 73 / 640
- Long-term average
- 36.2 spills a year (monitored since 2020)
- High-spill reason (company)
- Performance - Asset configuration (e.g. PS/rising main/storm tanks)
- Investigation
- UWWTR investigation ongoing, Operational investigation ongoing
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 635 hours spilling →
|
Scalby Beck - North Sea |
44 |
635 |
down 40% |
100% |
Draughton Wpc Works Inlet overflow at sewage works
- Sewage works
- Draughton Wpc Works
- Company site name
- DRAUGHTON/STW/6XDWF OVERFLOW
- EA ID / permit
- YWS00189 · 27/19/0082
- Outlet location
- SE0460053100 (OS grid reference) · View on Apple Maps
- WFD catchment
- Hambleton Beck/Ings Bk Catch (trib of Wharfe) (GB104027064030)
- Bathing water
- Wharfe at Cromwheel, Ilkley
- 2024 spills / hours
- 47 / 326
- Long-term average
- 23.8 spills a year (monitored since 2021)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 629 hours spilling →
|
Ings Beck |
56 |
629 |
up 19% |
100% |
Church End Sewage Pumping Station Storm discharge at pumping station
- Company site name
- CHURCH END/CSO
- EA ID / permit
- YWS00402 · 27/24/0214
- Outlet location
- SE5767437748 (OS grid reference) · View on Apple Maps
- WFD catchment
- Ouse Still/fleet bk - Kelfield and Wharfe d/s Ryther (GB104027064280)
- 2024 spills / hours
- 73 / 728
- Long-term average
- 36.7 spills a year (monitored since 2020)
- High-spill reason (company)
- Performance - SW Infiltration
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 621 hours spilling →
|
River Ouse (Tidal) |
68 |
621 |
down 7% |
100% |
New Ellerby Sewage Pumping Station Overflow on sewer network
- Company site name
- NEW ELLERBY/CSO
- EA ID / permit
- YWS01984 · WRA8861
- Outlet location
- TA1673039180 (OS grid reference) · View on Apple Maps
- WFD catchment
- Holderness Drain from Fordyke Stream to Humber (GB104026066800)
- 2024 spills / hours
- 72 / 610
- Long-term average
- 67.8 spills a year (monitored since 2020)
- High-spill reason (company)
- Performance - SW Infiltration
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- Operational improvement completed
- Volume & pollution
- Estimate from 620 hours spilling →
|
A Tributary of Kelwell Drain |
58 |
620 |
down 19% |
100% |
Canal Road Frizinghall CSO Overflow on sewer network
- Company site name
- CANAL RD FRIZINGHALL/CSO
- EA ID / permit
- YWS00974 · EPRUP3125GY
- Outlet location
- SE1557535594 (OS grid reference) · View on Apple Maps
- WFD catchment
- Bradford Beck (Clayton Bk to R Aire) (GB104027062862)
- 2024 spills / hours
- 69 / 307
- Long-term average
- 37.2 spills a year (monitored since 2020)
- High-spill reason (company)
- Performance - SW Infiltration
- Investigation
- Env Act (SODRP) investigation completed, UWWTR investigation completed, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 618 hours spilling →
|
Bradford Beck |
100 |
618 |
up 45% |
100% |
North Cowton STW Storm tank at sewage works
- Sewage works
- North Cowton
- Company site name
- NORTH COWTON/STW
- EA ID / permit
- YWS00346 · 27/23/0194
- Outlet location
- NZ2861003520 (OS grid reference) · View on Apple Maps
- WFD catchment
- Trenholme Stell from Source to River Wiske (GB104027069560)
- 2024 spills / hours
- 86 / 832
- Long-term average
- 114.5 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- Operational improvement completed
- Volume & pollution
- Estimate from 613 hours spilling →
|
The Stell |
63 |
613 |
down 27% |
100% |
Howden STW Inlet overflow at sewage works
- Sewage works
- Howden
- Company site name
- HOWDEN/STW
- EA ID / permit
- YWS00034 · 1569
- Outlet location
- SE7542026790 (OS grid reference) · View on Apple Maps
- WFD catchment
- HUMBER UPPER (GB530402609203)
- 2024 spills / hours
- 120 / 828
- Long-term average
- 86.5 spills a year (monitored since 2020)
- High-spill reason (company)
- Performance - SW Infiltration
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 610 hours spilling →
|
River Ouse (Tidal) |
74 |
610 |
down 38% |
100% |
Terry Avenue CSO Overflow on sewer network
- Company site name
- TERRY AVENUE/CSO
- EA ID / permit
- YWS00451 · 27/24/0427
- Outlet location
- SE6049251039 (OS grid reference) · View on Apple Maps
- WFD catchment
- Ouse from River Nidd to Stillingfleet Beck (GB104027069593)
- 2024 spills / hours
- 0 / 0.0
- Long-term average
- 14.0 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 608 hours spilling →
|
River Ouse |
56 |
608 |
up from 0 |
100% |
Danesmoor No 3 CSO Overflow on sewer network
- Company site name
- DANESMOOR/NO 3 CSO
- EA ID / permit
- YWS01817 · WRA8510
- Outlet location
- SK4047062810 (OS grid reference) · View on Apple Maps
- WFD catchment
- Rother from Source to Redleadmill Brook (GB104027052280)
- 2024 spills / hours
- 29 / 200
- Long-term average
- 39.3 spills a year (monitored since 2020)
- High-spill reason (company)
- Performance - SW Infiltration
- Investigation
- Env Act (SODRP) investigation completed, UWWTR investigation completed, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 606 hours spilling →
|
Tributary of the River Rother |
44 |
606 |
up 52% |
100% |
New Inn West Street CSO Overflow on sewer network
- Company site name
- NEW INN WEST STREET/CSO
- EA ID / permit
- YWS01775 · WRA8446
- Outlet location
- SE0589023460 (OS grid reference) · View on Apple Maps
- WFD catchment
- River Ryburn from Booth Dean Clough to R Calder (GB104027062580)
- 2024 spills / hours
- 122 / 1,393
- Long-term average
- 107.0 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- Env Act (SODRP) investigation completed, UWWTR investigation completed, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 604 hours spilling →
|
River Ryburn |
77 |
604 |
down 37% |
100% |
Listing Mill Farm CSO Overflow on sewer network
- Company site name
- LISTING MILL FARM/CSO
- EA ID / permit
- YWS00624 · 2767
- Outlet location
- SE2071024850 (OS grid reference) · View on Apple Maps
- WFD catchment
- Spen Beck from Source to River Calder (GB104027062710)
- 2024 spills / hours
- 38 / 79
- Long-term average
- 46.5 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 604 hours spilling →
|
Tributary of the River Spen |
74 |
604 |
up 95% |
100% |
Google Carr Lane SPS Storm discharge at pumping station
- Company site name
- GOOLE CARR LANE/SPS/6XDWF OVERFLOW
- EA ID / permit
- YWS00095 · 2213(T)
- Outlet location
- SE7490025630 (OS grid reference) · View on Apple Maps
- WFD catchment
- HUMBER UPPER (GB530402609203)
- 2024 spills / hours
- 55 / 252
- Long-term average
- 70.0 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- UWWTR investigation ongoing, Operational investigation ongoing
- Improvement
- Operational improvement ongoing
- Volume & pollution
- Estimate from 602 hours spilling →
|
River Ouse |
77 |
602 |
up 40% |
100% |
Ewden WwTW Storm tank at sewage works
- Sewage works
- Ewden
- Company site name
- EWDEN/STW
- EA ID / permit
- YWS00957 · EPRMB3797WP
- Outlet location
- SK2984495786 (OS grid reference) · View on Apple Maps
- WFD catchment
- Don from Little Don to River Loxley confluence (GB104027057411)
- 2024 spills / hours
- 60 / 726
- Long-term average
- 50.5 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 600 hours spilling →
|
River Don |
49 |
600 |
down 18% |
100% |
Springfield Lane CSO Overflow on sewer network
- Company site name
- SPRINGFIELD LANE/CSO
- EA ID / permit
- YWS01070 · S/UD/112
- Outlet location
- SE1918813012 (OS grid reference) · View on Apple Maps
- WFD catchment
- Fenay beck from Source to River Colne (GB104027063340)
- 2024 spills / hours
- 80 / 387
- Long-term average
- 65.2 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 595 hours spilling →
|
Tributary of Dean Bottom Dike |
67 |
595 |
down 16% |
91% |
Wyvil Crescent CSO Overflow on sewer network
- Company site name
- WYVIL CRESCENT/CSO
- EA ID / permit
- YWS00171 · 27/19/0019
- Outlet location
- SE1360848128 (OS grid reference) · View on Apple Maps
- WFD catchment
- Wharfe from Barben Beck/River Dibb to Hundwith Beck (GB104027064257)
- 2024 spills / hours
- 87 / 570
- Long-term average
- 87.7 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- UWWTR investigation completed, Operational investigation completed, Bathing Water and/or Shellfish Water investigation ongoing
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 595 hours spilling →
|
River Wharfe |
80 |
595 |
down 8% |
100% |
West Vale CSO Overflow on sewer network
- Company site name
- WEST VALE/CSO
- EA ID / permit
- YWS00153 · EPRSB3590WC
- Outlet location
- SE0942421127 (OS grid reference) · View on Apple Maps
- WFD catchment
- Black Brook from Source to River Calder (GB104027062570)
- 2024 spills / hours
- 177 / 2,082
- Long-term average
- 124.5 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Monitor below 90%
- Comms failure / issue · Resolved - Jun
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 587 hours spilling →
|
Black Brook |
78 |
587 |
down 56% |
68% |
North Ferriby STW Inlet overflow at sewage works
- Sewage works
- North Ferriby
- Company site name
- NORTH FERRIBY/STW
- EA ID / permit
- YWS00085 · 2137
- Outlet location
- SE9913025150 (OS grid reference) · View on Apple Maps
- WFD catchment
- HUMBER MIDDLE (GB530402609202)
- 2024 spills / hours
- 126 / 670
- Long-term average
- 135.8 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 581 hours spilling →
|
River Humber |
108 |
581 |
down 14% |
100% |
Garforth Storm Tanks No 1 & 2 Overflow on sewer network
- Company site name
- GARFORTH TANKS/CSO
- EA ID / permit
- YWS01431 · WRA7537
- Outlet location
- SE3980032060 (OS grid reference) · View on Apple Maps
- WFD catchment
- Lin Dike from Source to River Aire (GB104027062810)
- 2024 spills / hours
- 54 / 395
- Long-term average
- 48.3 spills a year (monitored since 2020)
- High-spill reason (company)
- Performance - Asset configuration (e.g. PS/rising main/storm tanks)
- Investigation
- UWWTR investigation ongoing, Operational investigation ongoing
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 580 hours spilling →
|
The Beck |
51 |
580 |
down 6% |
100% |
Runswick Beck CSO Storm discharge at pumping station
- Company site name
- RUNSWICK BECK/CSO
- EA ID / permit
- YWS00605 · 27/29/0090
- Outlet location
- NZ8074016120 (OS grid reference) · View on Apple Maps
- WFD catchment
- Not part of a WFD catchment
- Bathing water
- Runswick Bay
- 2024 spills / hours
- 62 / 714
- Long-term average
- 52.7 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- Operational investigation completed
- Improvement
- UWWTR improvement ongoing
- Volume & pollution
- Estimate from 568 hours spilling →
|
Culverted Runwick Beck |
44 |
568 |
down 29% |
100% |
Strensall SPS Storm discharge at pumping station
- Company site name
- STRENSALL/CSO
- EA ID / permit
- YWS01250 · WADC408
- Outlet location
- SE6260060600 (OS grid reference) · View on Apple Maps
- WFD catchment
- River Foss from the Syke to the River Ouse (GB104027063520)
- 2024 spills / hours
- 55 / 513
- Long-term average
- 52.5 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- Env Act (SODRP) investigation completed, UWWTR investigation completed, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 564 hours spilling →
|
River Foss |
52 |
564 |
down 5% |
100% |
Sheriff Hutton STW Storm tank at sewage works
- Sewage works
- Sheriff Hutton
- Company site name
- SHERIFF HUTTON/STW
- EA ID / permit
- YWS00435 · 27/24/0363
- Outlet location
- SE6439065580 (OS grid reference) · View on Apple Maps
- WFD catchment
- Foss from Farlington Beck to the Syke (GB104027063540)
- 2024 spills / hours
- 55 / 439
- Long-term average
- 71.7 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 558 hours spilling →
|
Howl Beck |
64 |
558 |
up 16% |
100% |
Manchester Road Weir CSO Overflow on sewer network
- Company site name
- MANCHESTER ROAD WEIR/CSO
- EA ID / permit
- YWS01825 · WRA8523
- Outlet location
- SK2848398153 (OS grid reference) · View on Apple Maps
- WFD catchment
- Little Don from Source to River Don (GB104027057460)
- 2024 spills / hours
- 104 / 695
- Long-term average
- 94.5 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 557 hours spilling →
|
The Porter Or Little Don River |
79 |
557 |
down 24% |
100% |
Silkstone STW Storm tank at sewage works
- Sewage works
- Silkstone
- Company site name
- SILKSTONE/STW/3XDWF OVERFLOW
- EA ID / permit
- YWS00118 · 2313
- Outlet location
- SE2948006430 (OS grid reference) · View on Apple Maps
- WFD catchment
- Silkstone Beck from Source to Cawthorne Dyke (GB104027057560)
- 2024 spills / hours
- 65 / 472
- Long-term average
- 49.7 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 555 hours spilling →
|
Silkstone Beck |
68 |
555 |
up 5% |
100% |
Lelley Sewage Treatment Works Inlet overflow at sewage works
- Sewage works
- Lelley
- Company site name
- LELLEY/STW
- EA ID / permit
- YWS01976 · WRA8797
- Outlet location
- TA2100032750 (OS grid reference) · View on Apple Maps
- WFD catchment
- Humbleton Beck Catchment (GB104026066610)
- 2024 spills / hours
- 93 / 1,524
- Long-term average
- 33.7 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 554 hours spilling →
|
Tributary of Northfield Drain |
39 |
554 |
down 58% |
100% |
South Stainley SPS Storm discharge at pumping station
- Company site name
- SOUTH STAINLEY/CSO
- EA ID / permit
- YWS00289 · 27/22/0069
- Outlet location
- SE3057063060 (OS grid reference) · View on Apple Maps
- WFD catchment
- Holbeck Catchment (GB104027064110)
- 2024 spills / hours
- 39 / 696
- Long-term average
- 48.7 spills a year (monitored since 2020)
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 548 hours spilling →
|
Stainley Beck |
29 |
548 |
down 26% |
99% |
High Royd Sewage Treatment Works Storm tank at sewage works
- Sewage works
- High Royd
- Company site name
- HIGH ROYD/NO 2 STW/3XDWF OVERFLOW
- EA ID / permit
- YWS00815 · 967
- Outlet location
- SE0469223871 (OS grid reference) · View on Apple Maps
- WFD catchment
- Calder from Colden Water to Ryburn Confluence (GB104027062641)
- 2024 spills / hours
- 91 / 1,052
- Long-term average
- 78.2 spills a year (monitored since 2020)
- High-spill reason (company)
- Performance - SW Infiltration
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 548 hours spilling →
|
River Calder |
57 |
548 |
down 37% |
100% |
Barwick in Elmet Sewage Works Storm tank at sewage works
- Sewage works
- Barwick In Elmet
- Company site name
- BARWICK IN ELMET/STW
- EA ID / permit
- YWS00794 · 65
- Outlet location
- SE4083037380 (OS grid reference) · View on Apple Maps
- WFD catchment
- Cock Beck Catchment (trib of Wharfe) (GB104027063940)
- 2024 spills / hours
- 101 / 866
- Long-term average
- 94.5 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- UWWTR investigation completed, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 546 hours spilling →
|
Trib of Cock Beck |
57 |
546 |
down 44% |
98% |
Constable Burton STW Inlet overflow at sewage works
- Sewage works
- Constable Burton
- Company site name
- CONSTABLE BURTON/STW
- EA ID / permit
- YWS00096 · 2216
- Outlet location
- SE1718390702 (OS grid reference) · View on Apple Maps
- WFD catchment
- Bedale/Newton/Burton Bk from Source to Brompton Bk (GB104027068940)
- 2024 spills / hours
- 49 / 455
- Long-term average
- 44.8 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- Env Act (SODRP) investigation completed, UWWTR investigation completed, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 544 hours spilling →
|
Burton Beck |
57 |
544 |
up 16% |
100% |
Crow Lane Works CSO Overflow on sewer network
- Company site name
- CROW LANE WORKS/CSO
- EA ID / permit
- YWS01793 · WRA8470
- Outlet location
- SK3887071440 (OS grid reference) · View on Apple Maps
- WFD catchment
- Rother, Spittal Brook to Doe Lea (GB104027057771)
- 2024 spills / hours
- 69 / 527
- Long-term average
- 65.7 spills a year (monitored since 2020)
- High-spill reason (company)
- Performance - SW Infiltration
- Investigation
- UWWTR investigation ongoing
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 541 hours spilling →
|
River Rother |
62 |
541 |
down 10% |
100% |
Hough Side Works CSO Overflow on sewer network
- Company site name
- HOUGH SIDE WORKS/CSO
- EA ID / permit
- YWS00859 · C4917
- Outlet location
- SE2365433149 (OS grid reference) · View on Apple Maps
- WFD catchment
- Low/Wortley/Pudsey Bks from Source to Milshaw Beck (GB104027062830)
- 2024 spills / hours
- 103 / 687
- Long-term average
- 92.3 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- Env Act (SODRP) investigation completed, UWWTR investigation completed, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 540 hours spilling →
|
Farnley Beck |
86 |
540 |
down 17% |
100% |
Wistons Lane/Elland Link CSO Overflow on sewer network
- Company site name
- WISTONS LANE/CSO
- EA ID / permit
- YWS01905 · WRA8662
- Outlet location
- SE1101021420 (OS grid reference) · View on Apple Maps
- WFD catchment
- Calder from Ryburn Confluence to River Colne (GB104027062642)
- 2024 spills / hours
- 47 / 207
- Long-term average
- 46.7 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- Env Act (SODRP) investigation completed, UWWTR investigation completed, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 540 hours spilling →
|
Canker Dyke |
47 |
540 |
no change |
100% |
Bolsover WwTW Storm tank at sewage works
- Sewage works
- Bolsover
- Company site name
- BOLSOVER/STW
- EA ID / permit
- YWS00062 · 1866
- Outlet location
- SK4591070150 (OS grid reference) · View on Apple Maps
- WFD catchment
- Doe Lea from Source to Hawke Brook (GB104027057290)
- 2024 spills / hours
- 91 / 786
- Long-term average
- 80.3 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 540 hours spilling →
|
River Doe Lea |
76 |
540 |
down 16% |
100% |
Bridge Road CSO Overflow on sewer network
- Company site name
- BRIDGE ROAD/CSO
- EA ID / permit
- YWS02124 · WRA9235
- Outlet location
- SE2784017820 (OS grid reference) · View on Apple Maps
- WFD catchment
- Smithy Brook from Source to River Calder (GB104027062510)
- 2024 spills / hours
- 110 / 736
- Long-term average
- 92.8 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- Operational improvement completed
- Volume & pollution
- Estimate from 525 hours spilling →
|
Smithy Brook |
101 |
525 |
down 8% |
100% |
Norton Le Clay Sewage Works Inlet overflow at sewage works
- Sewage works
- Norton Le Clay
- Company site name
- NORTON LE CLAY/STW
- EA ID / permit
- YWS00367 · 27/23/0272
- Outlet location
- SE4006071170 (OS grid reference) · View on Apple Maps
- WFD catchment
- Cundall Beck/Soppa Gutter Catch (trib of Swale) (GB104027068780)
- 2024 spills / hours
- 110 / 1,429
- Long-term average
- 85.0 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 515 hours spilling →
|
Unnamed Trib of Main Goit |
59 |
515 |
down 46% |
100% |
Caldervale (Wakefield) STW Storm tank at sewage works
- Sewage works
- Caldervale
- Company site name
- CALDER VALE/STW/3XDWF OVERFLOW
- EA ID / permit
- YWS00830 · C4106
- Outlet location
- SE3506020400 (OS grid reference) · View on Apple Maps
- WFD catchment
- Calder from River Chald to River Aire (GB104027062632)
- 2024 spills / hours
- 41 / 373
- Long-term average
- 55.3 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 511 hours spilling →
|
River Calder |
47 |
511 |
up 15% |
100% |
High Bridge Hillsborough CSO Overflow on sewer network
- Company site name
- HIGH BRIDGE HILLSBORO/CSO
- EA ID / permit
- YWS01788 · WRA8464
- Outlet location
- SK3344090530 (OS grid reference) · View on Apple Maps
- WFD catchment
- Don from Little Don to River Loxley confluence (GB104027057411)
- 2024 spills / hours
- 106 / 706
- Long-term average
- 103.7 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 509 hours spilling →
|
River Don |
80 |
509 |
down 25% |
100% |
Cawthorne WwTW Storm tank at sewage works
- Sewage works
- Cawthorne
- Company site name
- CAWTHORNE/STW/3XDWF OVERFLOW
- EA ID / permit
- YWS00011 · 112
- Outlet location
- SE2829008110 (OS grid reference) · View on Apple Maps
- WFD catchment
- Cawthorne Dyke from Source to Silkstone Beck (GB104027063150)
- 2024 spills / hours
- 133 / 932
- Long-term average
- 84.8 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 508 hours spilling →
|
Tanyard Beck |
47 |
508 |
down 65% |
100% |
Harrogate North Sewage Treatment Storm tank at sewage works
- Sewage works
- Harrogate North Sewage Treatment
- Company site name
- HARROGATE NORTH/STW/3XDWF OVERFLOW
- EA ID / permit
- YWS01039 · QR.27/21/0047
- Outlet location
- SE3020057985 (OS grid reference) · View on Apple Maps
- WFD catchment
- Oak Beck Catchment (Trib of Nidd) (GB104027063760)
- 2024 spills / hours
- 69 / 686
- Long-term average
- 67.7 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing, Operational investigation ongoing, Bathing Water and/or Shellfish Water investigation ongoing
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 504 hours spilling →
|
Oak Beck (Nidd Cat) |
56 |
504 |
down 19% |
100% |
Hunton STW Final Effluent Inlet overflow at sewage works
- Sewage works
- Hunton Final Effluent
- Company site name
- HUNTON/STW
- EA ID / permit
- YWS00370 · 27/23/0275
- Outlet location
- SE1947092120 (OS grid reference) · View on Apple Maps
- WFD catchment
- Brompton Bk from Source to Newton Bk (GB104027068960)
- 2024 spills / hours
- 73 / 692
- Long-term average
- 61.8 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- Env Act (SODRP) investigation completed, UWWTR investigation completed, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 501 hours spilling →
|
Hunton Beck |
63 |
501 |
down 14% |
100% |
Market Weighton STW Storm tank at sewage works
- Sewage works
- Market Weighton
- Company site name
- MARKET WEIGHTON/NO 2 STW
- EA ID / permit
- YWS01001 · H226
- Outlet location
- SE8681040700 (OS grid reference) · View on Apple Maps
- WFD catchment
- Foulness from Black Beck to Market Weighton Canal (GB104026066690)
- 2024 spills / hours
- 104 / 1,225
- Long-term average
- 55.5 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 497 hours spilling →
|
Market Weighton Beck |
41 |
497 |
down 61% |
100% |
Knostrop WwTW Storm tank at sewage works
- Sewage works
- Knostrop
- Company site name
- KNOSTROP/H LEVEL STW/3XDWF OVERFLOW
- EA ID / permit
- YWS01345 · WRA6924
- Outlet location
- SE3384031860 (OS grid reference) · View on Apple Maps
- WFD catchment
- Wyke Beck from Source to River Aire (GB104027062880)
- 2024 spills / hours
- 73 / 679
- Long-term average
- 94.3 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- Env Act (SODRP) investigation completed, UWWTR investigation completed, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 495 hours spilling →
|
Wyke Beck and the River Aire |
56 |
495 |
down 23% |
100% |
Old Whittington (Chesterfield) STW Inlet overflow at sewage works
- Sewage works
- Old Whittington
- Company site name
- OLD WHITTINGTON/STW
- EA ID / permit
- YWS01335 · WRA6756
- Outlet location
- SK3929074400 (OS grid reference) · View on Apple Maps
- WFD catchment
- Rother, Spittal Brook to Doe Lea (GB104027057771)
- 2024 spills / hours
- 34 / 604
- Long-term average
- 31.5 spills a year (monitored since 2020)
- Investigation
- Env Act (SODRP) investigation completed, UWWTR investigation completed, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 494 hours spilling →
|
River Rother |
29 |
494 |
down 15% |
99% |
Great Hatfield STW Inlet overflow at sewage works
- Sewage works
- Great Hatfield
- Company site name
- GREAT HATFIELD/NO 2 STW
- EA ID / permit
- YWS01743 · WRA8394
- Outlet location
- TA1821042730 (OS grid reference) · View on Apple Maps
- WFD catchment
- Lambwath Stream from Source to Foredyke Stream (GB104026066860)
- 2024 spills / hours
- 50 / 584
- Long-term average
- 38.0 spills a year (monitored since 2020)
- High-spill reason (company)
- Not asset maintenance - hydraulic capacity
- Investigation
- UWWTR investigation ongoing, Operational investigation completed
- Improvement
- No improvement action in reporting period
- Volume & pollution
- Estimate from 494 hours spilling →
|
Unnamed Trib of Catchwater Drn |
43 |
494 |
down 14% |
100% |